X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22168"

m
m
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22168
 
| Well ID: 37-003-22168
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.534375, -80.119433 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.534375, -80.119433 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Kilbuck Township,_Allegheny_County,_Pennsylvania|Kilbuck Township]]
 
|-
 
|-
 
| Operator Name: [[AMER NATURAL RESOURCES LLC]]
 
| Operator Name: [[AMER NATURAL RESOURCES LLC]]
 
|-
 
|-
| First Permit Date: 2011-03-14
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date: 2011-03-14
+
| Farm/Lease Name: CHARLES LENZNER UNIT 2
 
|-
 
|-
| Spud Date: 2011-05-05
+
| License Status: PLUGGED & ABANDONED
 
|-
 
|-
| Unconventional: No
+
| Spud Date:  
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 2011-03-14
 
|-
 
|-
| Violations: None
+
| Well Type: OIL
 +
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.534375
 
| Latitude: 40.534375
 
|-
 
|-
 
| Longitude: -80.119433
 
| Longitude: -80.119433
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-03-14
 +
| New Permit Application
 +
|-
 +
| 2011-05-05
 +
| Performed Spud Operation
 +
|-
 +
| 2011-05-11
 +
| Drilling Completion
 +
|-
 +
| 2014-02-12
 +
| Drilling Completion
 +
|-
 +
| 2014-04-08
 +
| NEWLY DRILLED
 +
|-
 +
| 2016-06-28
 +
| FULLY PLUGGED
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2013-0
+
| 2011
| style="text-align:right;" | 0.0
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[AMER NATURAL RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-0
+
| 2013
| style="text-align:right;" | 0.0
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2014
| 2011-0
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-0
+
| 2011
| DRILLING FLUID WASTE
+
| [[AMER NATURAL RESOURCES LLC]]
| style="text-align:right;" | 568.0
+
| Drilling Fluid Waste
| Bbl
+
| style="text-align: right;" | 420.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
|-
+
| 2012
| 2011-0
+
| [[AMER NATURAL RESOURCES LLC]]
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste
| style="text-align:right;" | 420.0
+
| style="text-align: right;" | 568.00 Bbl
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
|-
 
|-
 
| 2012-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 568.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1976559
 
| 1976559
 +
| Primary Facility
 
| 2011-04-18
 
| 2011-04-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| EXCAVATOR DIGGING PIT.
 
| EXCAVATOR DIGGING PIT.
E&S, OK AND ACCESS IS STONED.
 
|
 
|-
 
 
|-
 
|-
 
| 1979464
 
| 1979464
 +
| Primary Facility
 
| 2011-05-10
 
| 2011-05-10
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| RIG DOWN.  
+
| RIG DOWN.
SIT, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1979466
 
| 1979466
 +
| Primary Facility
 
| 2011-05-09
 
| 2011-05-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| USE RIG #7 RAN 9 5/8" CASING IN HOLE. CASING WILL BE CEMENTED LATER IN THE DAY.
 
| USE RIG #7 RAN 9 5/8" CASING IN HOLE. CASING WILL BE CEMENTED LATER IN THE DAY.
|
 
|-
 
 
|-
 
|-
 
| 1979496
 
| 1979496
 +
| Primary Facility
 
| 2011-05-09
 
| 2011-05-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING IS COMPLETE. THE SITE IS CLEAN AND DOZED. THE PIT LEVEL IS OK.
 
| DRILLING IS COMPLETE. THE SITE IS CLEAN AND DOZED. THE PIT LEVEL IS OK.
|
 
|-
 
 
|-
 
|-
 
| 1983161
 
| 1983161
 +
| Primary Facility
 
| 2011-05-12
 
| 2011-05-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| DRILLING COMPLETE. EQUIPTMENT GONE.  
+
| DRILLING COMPLETE. EQUIPTMENT GONE.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1983732
 
| 1983732
 +
| Primary Facility
 
| 2011-04-20
 
| 2011-04-20
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On April 20th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road could use some additional rock.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On April 20th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road could use some additional rock.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1983807
 
| 1983807
 +
| Primary Facility
 
| 2011-05-04
 
| 2011-05-04
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On May 4th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road was being rocked.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On May 4th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road was being rocked.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1983812
 
| 1983812
 +
| Primary Facility
 
| 2011-05-11
 
| 2011-05-11
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On May 11th, 2011 I conducted a routine inspection of the above site.  Drilling has started.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  Pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On May 11th, 2011 I conducted a routine inspection of the above site.  Drilling has started.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  Pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 2018481
 
| 2018481
 +
| Primary Facility
 
| 2011-10-05
 
| 2011-10-05
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
 
| THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
|
 
|-
 
 
|-
 
|-
 
| 2027979
 
| 2027979
 +
| Primary Facility
 
| 2011-12-08
 
| 2011-12-08
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| E&S plan on site (originally only ofr one well but now includes Lenzer #3 & #4 also).
 
| E&S plan on site (originally only ofr one well but now includes Lenzer #3 & #4 also).
 
The access road is good.
 
 
The drill pit was good and had adequate freeboard.
 
 
Working on the silt fence at inspection.
 
 
Additional stabilization on banks.
 
 
Weekly inspections and after percipitation events are required.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2051738
 
| 2051738
 +
| Primary Facility
 
| 2012-03-20
 
| 2012-03-20
 +
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
 
| On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #2.  The well reached total depth on 5/11/11 and restoration should have been done by 2/11/12.
 
| On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #2.  The well reached total depth on 5/11/11 and restoration should have been done by 2/11/12.
 
However, ANR was unable to complete the restoration on time because of the extremely wet summer and fall (they included documentation).  I granted the extension and the new restoration date will be 8/11/12.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2065239
 
| 2065239
 +
| Primary Facility
 
| 2012-04-03
 
| 2012-04-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| PUMP JACK SET AND LOOKS TO BE IN USE. TANKS ARE SET. SITE RESTORED.
 
| PUMP JACK SET AND LOOKS TO BE IN USE. TANKS ARE SET. SITE RESTORED.
|
 
|-
 
 
|-
 
|-
 
| 2086051
 
| 2086051
 +
| Primary Facility
 
| 2012-07-24
 
| 2012-07-24
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #4 site.  The new reclamation date is August 5, 2012.  
+
| On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #4 site.  The new reclamation date is August 5, 2012.
 
 
On July 24, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #4 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
 
 
 
I’m recording no violations at this time, but the site could use tending.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2100596
 
| 2100596
 +
| Primary Facility
 
| 2012-09-06
 
| 2012-09-06
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #2 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
 
| On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #2 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
 
Site restoration requires 70% perennial vegetation and the fence removed.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2247336
 
| 2247336
 +
| Primary Facility
 
| 2014-01-22
 
| 2014-01-22
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| EXTREAM COLD PREVENTED EQUIPTMENT FROM STARTING. PLUGGING IS DELAYED.
 
| EXTREAM COLD PREVENTED EQUIPTMENT FROM STARTING. PLUGGING IS DELAYED.
|
 
|-
 
 
|-
 
|-
 
| 2247425
 
| 2247425
 +
| Primary Facility
 
| 2014-01-21
 
| 2014-01-21
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| OIL AND BRINE TANKS ARE STILL ON THE PAD. FRONTIER ENERGY SERVICE RIG IS SET UP TO PLUG THIS WELL.
 
| OIL AND BRINE TANKS ARE STILL ON THE PAD. FRONTIER ENERGY SERVICE RIG IS SET UP TO PLUG THIS WELL.
|
 
|-
 
 
|-
 
|-
 
| 2251811
 
| 2251811
 +
| Primary Facility
 
| 2014-01-24
 
| 2014-01-24
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| APPALACHIAN WELL SERVICES HAS SET BOTTOM PLUG FROM TD TO 1,637'. HIGHER PLUGS WILL BE SET LATER.
 
| APPALACHIAN WELL SERVICES HAS SET BOTTOM PLUG FROM TD TO 1,637'. HIGHER PLUGS WILL BE SET LATER.
|
 
|-
 
 
|-
 
|-
 
| 2251812
 
| 2251812
 +
| Primary Facility
 
| 2014-01-28
 
| 2014-01-28
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| RIG IS DOWN. PLUGGING IS NOT COMPLETE. TANKS ARE ON THE PAD.
 
| RIG IS DOWN. PLUGGING IS NOT COMPLETE. TANKS ARE ON THE PAD.
|
 
|-
 
 
|-
 
|-
 
| 2251849
 
| 2251849
 +
| Primary Facility
 
| 2014-02-12
 
| 2014-02-12
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS PLUGGED. 7" BOND LOG WAS POSITIVE. PROPER PLUGS WERE SET. PEA GRAVEL WILL BE ADDED.
 
| WELL IS PLUGGED. 7" BOND LOG WAS POSITIVE. PROPER PLUGS WERE SET. PEA GRAVEL WILL BE ADDED.
|
 
|-
 
 
|-
 
|-
 
| 2251853
 
| 2251853
 +
| Primary Facility
 
| 2014-03-04
 
| 2014-03-04
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS PLUGGED. VENTED MARKER WITH API NUMBER IS INSTALLED. STORAGE TANKS ARE GONE.
 
| WELL IS PLUGGED. VENTED MARKER WITH API NUMBER IS INSTALLED. STORAGE TANKS ARE GONE.
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 13:39, 20 May 2020

Well Details

Well ID: 37-003-22168
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Kilbuck Township
Operator Name: AMER NATURAL RESOURCES LLC
Well Pad ID:
Farm/Lease Name: CHARLES LENZNER UNIT 2
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date: 2011-03-14
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.534375
Longitude: -80.119433

For data sources see[1][2][3]

Well History

Date Event
2011-03-14 New Permit Application
2011-05-05 Performed Spud Operation
2011-05-11 Drilling Completion
2014-02-12 Drilling Completion
2014-04-08 NEWLY DRILLED
2016-06-28 FULLY PLUGGED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2013 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0
2014 AMER NATURAL RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 AMER NATURAL RESOURCES LLC Drilling Fluid Waste 420.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 AMER NATURAL RESOURCES LLC Drilling Fluid Waste 568.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1976559 Primary Facility 2011-04-18 Drilling/Alteration No Violations Noted EXCAVATOR DIGGING PIT.
1979464 Primary Facility 2011-05-10 Drilling/Alteration No Violations Noted RIG DOWN.
1979466 Primary Facility 2011-05-09 Drilling/Alteration No Violations Noted USE RIG #7 RAN 9 5/8" CASING IN HOLE. CASING WILL BE CEMENTED LATER IN THE DAY.
1979496 Primary Facility 2011-05-09 Drilling/Alteration No Violations Noted DRILLING IS COMPLETE. THE SITE IS CLEAN AND DOZED. THE PIT LEVEL IS OK.
1983161 Primary Facility 2011-05-12 Drilling/Alteration No Violations Noted DRILLING COMPLETE. EQUIPTMENT GONE.
1983732 Primary Facility 2011-04-20 Routine/Complete Inspection No Violations Noted On April 20th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road could use some additional rock. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1983807 Primary Facility 2011-05-04 Routine/Complete Inspection No Violations Noted On May 4th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road was being rocked. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1983812 Primary Facility 2011-05-11 Routine/Complete Inspection No Violations Noted On May 11th, 2011 I conducted a routine inspection of the above site. Drilling has started. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Pit appeared to be in good condition. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
2018481 Primary Facility 2011-10-05 Drilling/Alteration No Violations Noted THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
2027979 Primary Facility 2011-12-08 Routine/Complete Inspection No Violations Noted E&S plan on site (originally only ofr one well but now includes Lenzer #3 & #4 also).
2051738 Primary Facility 2012-03-20 Administrative/File Review No Violations Noted On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #2. The well reached total depth on 5/11/11 and restoration should have been done by 2/11/12.
2065239 Primary Facility 2012-04-03 Routine/Complete Inspection No Violations Noted PUMP JACK SET AND LOOKS TO BE IN USE. TANKS ARE SET. SITE RESTORED.
2086051 Primary Facility 2012-07-24 Routine/Complete Inspection No Violations Noted On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #4 site. The new reclamation date is August 5, 2012.
2100596 Primary Facility 2012-09-06 Routine/Complete Inspection No Violations Noted On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #2 site to check the restoration progress. The site is in fair shape. Overall the it is vegetated but the silt fence is still up. We also did not see signs on the well itself.
2247336 Primary Facility 2014-01-22 Plugging(Includes Plugged/Mined Through) No Violations Noted EXTREAM COLD PREVENTED EQUIPTMENT FROM STARTING. PLUGGING IS DELAYED.
2247425 Primary Facility 2014-01-21 Plugging(Includes Plugged/Mined Through) No Violations Noted OIL AND BRINE TANKS ARE STILL ON THE PAD. FRONTIER ENERGY SERVICE RIG IS SET UP TO PLUG THIS WELL.
2251811 Primary Facility 2014-01-24 Plugging(Includes Plugged/Mined Through) No Violations Noted APPALACHIAN WELL SERVICES HAS SET BOTTOM PLUG FROM TD TO 1,637'. HIGHER PLUGS WILL BE SET LATER.
2251812 Primary Facility 2014-01-28 Plugging(Includes Plugged/Mined Through) No Violations Noted RIG IS DOWN. PLUGGING IS NOT COMPLETE. TANKS ARE ON THE PAD.
2251849 Primary Facility 2014-02-12 Plugging(Includes Plugged/Mined Through) No Violations Noted WELL IS PLUGGED. 7" BOND LOG WAS POSITIVE. PROPER PLUGS WERE SET. PEA GRAVEL WILL BE ADDED.
2251853 Primary Facility 2014-03-04 Plugging(Includes Plugged/Mined Through) No Violations Noted WELL IS PLUGGED. VENTED MARKER WITH API NUMBER IS INSTALLED. STORAGE TANKS ARE GONE.

For data sources see[7]

References