X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-27903"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-27903
 
| Well ID: 37-005-27903
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.810179, -79.383108 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.810179, -79.383108 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: VIRAG 8
 
| Farm/Lease Name: VIRAG 8
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2005-04-12
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2005-02-01
 
| Permit Date: 2005-02-01
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.810179
 
| Latitude: 40.810179
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-02-01
 +
| New Permit Application
 +
|-
 +
| 2005-04-12
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 92:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 214: Line 246:
 
| [[ALLIANCE PETRO CO LLC]]
 
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 1,548.00
 
| style="text-align: right;" | 1,548.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[ALLIANCE PETRO CO LLC]]
 +
| style="text-align: right;" | 1,526.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 238: Line 279:
 
| 2012
 
| 2012
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE

Latest revision as of 04:53, 21 May 2020

Well Details

Well ID: 37-005-27903
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Valley Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: VIRAG 8
License Status:
Spud Date:
Permit Date: 2005-02-01
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.810179
Longitude: -79.383108

For data sources see[1][2][3]

Well History

Date Event
2005-02-01 New Permit Application
2005-04-12 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2005 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2006 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2007 DANNIC ENERGY CORP 3,443.00 304 0.00 0 0.00 0
2008 EXCO RESOURCES PA INC 4,293.00 366 0.00 0 0.00 0
2009 EXCO RESOURCES PA INC 3,679.00 365 0.00 0 0.00 0
2010 EXCO RESOURCES PA INC 2,777.00 365 0.00 0 0.00 0
2011 EXCO RESOURCES PA INC 3,090.00 365 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 2,992.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 2,356.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 2,247.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 2,313.00 365 0.00 0 0.00 0
2016 ALLIANCE PETRO CO LLC 461.00 183 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 1,324.00 365 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 1,548.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 1,526.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 EXCO RESOURCES PA LLC Produced Fluid 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1442140 Primary Facility 2005-04-18 Drilling/Alteration No Violations Noted ES and pit ok.

For data sources see[7]

References