X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30525"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30525
 
| Well ID: 37-005-30525
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.745321, -79.254434 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.745321, -79.254434 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: WYNN 1
 
| Farm/Lease Name: WYNN 1
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2010-02-04
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2009-12-22
 
| Permit Date: 2009-12-22
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.745321
 
| Latitude: 40.745321
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-12-22
 +
| New Permit Application
 +
|-
 +
| 2010-02-04
 +
| Performed Spud Operation
 +
|-
 +
| 2010-02-12
 +
| Drilling Completion
 +
|-
 +
| 2010-02-23
 +
| Perforation
 +
|-
 +
| 2010-09-28
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 161: Line 202:
 
| style="text-align: right;" | 2,760.00
 
| style="text-align: right;" | 2,760.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 4,816.75
 +
| style="text-align: right;" | 61
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 184: Line 234:
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Drilling Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 740.00 Bbl
+
| style="text-align: right;" | 1,320.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0095443
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 1,320.00 Bbl
+
| style="text-align: right;" | 530.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| PA0091472
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Fracing Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 530.00 Bbl
+
| style="text-align: right;" | 740.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
Line 205: Line 255:
 
| 2013
 
| 2013
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 48 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 48.00 Bbl
 
| style="text-align: right;" | 48.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Latest revision as of 08:39, 21 May 2020

Well Details

Well ID: 37-005-30525
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Atwood Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: WYNN 1
License Status:
Spud Date:
Permit Date: 2009-12-22
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.745321
Longitude: -79.254434

For data sources see[1][2][3]

Well History

Date Event
2009-12-22 New Permit Application
2010-02-04 Performed Spud Operation
2010-02-12 Drilling Completion
2010-02-23 Perforation
2010-09-28 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 3,419.00 123 0.00 0 0.00 0
2011 PENNECO OIL CO INC 6,498.00 365 0.00 0 0.00 0
2012 PENNECO OIL CO INC 6,987.00 335 0.00 0 0.00 0
2013 PENNECO OIL CO INC 7,717.00 365 0.00 0 0.00 0
2014 PENNECO OIL CO INC 4,700.00 365 0.00 0 0.00 0
2015 PENNECO OIL CO INC 2,844.87 244 0.00 0 0.00 0
2016 PENNECO OIL CO INC 689.85 61 0.00 0 0.00 0
2017 PENNECO OIL CO INC 2,791.00 365 0.00 0 0.00 0
2018 PENNECO OIL CO INC 2,760.00 365 0.00 0 0.00 0
2019 PENNECO OIL CO INC 4,816.75 61 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENNECO OIL CO INC Fracing Fluid Waste 1,320.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PENNECO OIL CO INC Fracing Fluid Waste 530.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Drilling Fluid Waste 740.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2013 PENNECO OIL CO INC Produced Fluid 48 Bbl CENT WASTE TRT FAC NPDES PA0095443
2013 PENNECO OIL CO INC Produced Fluid 48.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1865027 Primary Facility 2010-02-23 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed and logging equipment was located onsite. Noted below and above grade pits located onsite. Both pits had more than the required two feet of lined freeboard. The operator should evaluate all site erosion controls for functionality as the snow melts. N oted that there had been a small amount of sediment transported off-site onto SR 2002. Due to the current access road condition and the time of year the operator should implement additional clean durable rock to the access road for stabilization and have a plow and/or broom truck available during well stimulation activities.
1877326 Primary Facility 2010-04-14 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for & in production at the time of the inspection. Brine tank located onsite and appeared to be in sound condition. The majority of the disturbed area had been regraded, seeded, and mulched. The area upslope from the well head still required seeding and mulching. Obsereved no accelerated erosion & sedimentation in relation to the access road or well-site.
2122937 Primary Facility 2012-12-12 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2728503 Primary Facility 2018-05-10 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping and grounded 100 bbl fiberglass fluid collection tank look ok.

For data sources see[7]

References