X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31318"

m
 
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31318
 
| Well ID: 37-005-31318
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.686867, -79.681397 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.686864, -79.681397 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: TRILOGY C 4H
 
| Farm/Lease Name: TRILOGY C 4H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 09/17/2018
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 3/12/2018
+
| Permit Date: 2018-03-12
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 29: Line 31:
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 
|-
 
|-
| Latitude: 40.686867
+
| Conservation: No
 +
|-
 +
| Latitude: 40.686864
 
|-
 
|-
 
| Longitude: -79.681397
 
| Longitude: -79.681397
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-03-12
 +
| New Permit Application
 +
|-
 +
| 2018-09-17
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 119:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 1,494,123.60
| style="text-align: right;" | 0
+
| style="text-align: right;" | 139
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 79: Line 136:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 84: Line 142:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-10
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[XTO ENERGY INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,080.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 719.09 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Drill Cuttings
 
| style="text-align: right;" | 14.77 Tons
 
| style="text-align: right;" | 14.77 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100434
 
| 100434
 
|-
 
|-
| 2018-10
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[XTO ENERGY INC]]
| style="text-align: right;" | 206.71 Tons
+
| Drill Cuttings
 +
| style="text-align: right;" | 1,060.01 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100585
 
| 100585
 
|-
 
|-
| 2018-10
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[XTO ENERGY INC]]
| style="text-align: right;" | 370.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 1,016.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Unused Fracturing Fluid Waste
 +
| style="text-align: right;" | 13.32 Tons
 +
| LANDFILL
 +
| 100434
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,504.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 253.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2018-11
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[XTO ENERGY INC]]
| style="text-align: right;" | 512.38 Tons
+
| Drill Cuttings
 +
| style="text-align: right;" | 167.00 Tons
 
| LANDFILL
 
| LANDFILL
| 100585
+
| 100172
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,463.06 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,118.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2018-11
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[XTO ENERGY INC]]
| style="text-align: right;" | 600.00 Bbl
+
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 122.13 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NW009
+
| 101674
 
|-
 
|-
| 2018-12
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[XTO ENERGY INC]]
| style="text-align: right;" | 110.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 53,898.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2019-01
+
| 2019
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[XTO ENERGY INC]]
| style="text-align: right;" | 3.56 Tons
+
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 50.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 53.50 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100585
 
| 100585
Line 207: Line 328:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 08:36, 21 May 2020

Well Details

Well ID: 37-005-31318
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Freeport Borough
Operator Name: XTO ENERGY INC
Well Pad ID: 155139
Farm/Lease Name: TRILOGY C 4H
License Status:
Spud Date:
Permit Date: 2018-03-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.686864
Longitude: -79.681397

For data sources see[1][2][3]

Well History

Date Event
2018-03-12 New Permit Application
2018-09-17 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 1,494,123.60 139 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 XTO ENERGY INC Drilling Fluid Waste 1,080.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Drill Cuttings 719.09 Tons LANDFILL 100585
2018 XTO ENERGY INC Drill Cuttings 14.77 Tons LANDFILL 100434
2019 XTO ENERGY INC Drill Cuttings 1,060.01 Tons LANDFILL 100585
2019 XTO ENERGY INC Produced Fluid 1,016.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Unused Fracturing Fluid Waste 13.32 Tons LANDFILL 100434
2019 XTO ENERGY INC Produced Fluid 1,504.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Other Oil & Gas Wastes 253.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Drill Cuttings 167.00 Tons LANDFILL 100172
2019 XTO ENERGY INC Produced Fluid 1,463.06 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 1,118.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Waste Water Treatment Sludge 122.13 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Produced Fluid 53,898.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Other Oil & Gas Wastes 50.00 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Synthetic Liner Materials 53.50 Tons LANDFILL 100585

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2775897 Primary Facility 2018-09-17 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.
2778793 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

2800614 Primary Facility 2018-11-08 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

On this date the rig had finished their top hole portion of this well and had TD'd at 6278' and was moving equipment off the well. All paperwork and equipment on site looked ok.

2821638 Primary Facility 2019-01-03 Drilling/Alteration No Violations Noted The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok.

For data sources see[7]

References