If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-015-20661 | | Well ID: 37-015-20661 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.803369, -76.638283 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: FINNERTY 2H | | Farm/Lease Name: FINNERTY 2H | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2010-03-05 |
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.803369 | | Latitude: 41.803369 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2010-03-05 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-08-07 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2010-10-05 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2010-12-22 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2011-10-05 | ||
+ | | DEVIATED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 143: | Line 209: | ||
| 2019 | | 2019 | ||
| [[CHESAPEAKE APPALACHIA LLC]] | | [[CHESAPEAKE APPALACHIA LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 364,951.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 364 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 160: | Line 226: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 165: | Line 232: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | Fracing Fluid Waste | + | | [[CHESAPEAKE APPALACHIA LLC]] |
+ | | Fracing Fluid Waste | ||
| style="text-align: right;" | 6,450.00 Bbl | | style="text-align: right;" | 6,450.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | Produced Fluid | + | | [[CHESAPEAKE APPALACHIA LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 454.30 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | | + | | 2013 |
− | | Produced Fluid | + | | [[CHESAPEAKE APPALACHIA LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 1,014.86 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | | + | | 2014 |
− | | Produced Fluid | + | | [[CHESAPEAKE APPALACHIA LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 130.00 Bbl |
− | | | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) |
+ | | WMGR123NC008 | ||
|- | |- | ||
− | | | + | | 2014 |
− | + | | [[CHESAPEAKE APPALACHIA LLC]] | |
− | + | | Produced Fluid | |
− | | | ||
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
| style="text-align: right;" | 173.52 Bbl | | style="text-align: right;" | 173.52 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | | + | | 2015 |
− | + | | [[CHESAPEAKE APPALACHIA LLC]] | |
− | + | | Produced Fluid | |
− | | | ||
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
| style="text-align: right;" | 350.50 Bbl | | style="text-align: right;" | 350.50 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | Produced Fluid | + | | [[CHESAPEAKE APPALACHIA LLC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 222.00 Bbl | | style="text-align: right;" | 222.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | Produced Fluid | + | | [[CHESAPEAKE APPALACHIA LLC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 220.00 Bbl | | style="text-align: right;" | 220.00 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CHESAPEAKE APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 108.00 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CHESAPEAKE APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 105.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NC008 | ||
|- | |- | ||
|} | |} | ||
Line 244: | Line 321: | ||
| 1941579 | | 1941579 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2011-01-05 |
| Compliance Evaluation | | Compliance Evaluation | ||
| No Violations Noted | | No Violations Noted | ||
Line 251: | Line 328: | ||
| 1943362 | | 1943362 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2010-12-16 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 258: | Line 335: | ||
| 1945366 | | 1945366 | ||
| Primary Facility | | Primary Facility | ||
− | | 11 | + | | 2010-11-04 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 265: | Line 342: | ||
| 1947422 | | 1947422 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2011-02-03 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 272: | Line 349: | ||
| 1955104 | | 1955104 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2011-02-22 |
| Follow-up Inspection | | Follow-up Inspection | ||
| Pending | | Pending | ||
Line 279: | Line 356: | ||
| 2185755 | | 2185755 | ||
| Primary Facility | | Primary Facility | ||
− | | 07 | + | | 2013-07-23 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 286: | Line 363: | ||
| 2367825 | | 2367825 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2015-05-06 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 293: | Line 370: | ||
| 2435108 | | 2435108 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2015-12-22 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 349: | Line 426: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-015-20661 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.803369,"lon":-76.638283,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: West Burlington Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148336 | |
Farm/Lease Name: FINNERTY 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.803369 | |
Longitude: -76.638283 |
Date | Event |
---|---|
2010-03-05 | New Permit Application |
2010-08-07 | Performed Spud Operation |
2010-10-05 | New Permit Application |
2010-12-22 | Perforation |
2011-10-05 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 616,972.00 | 135 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 1,123,599.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 981,178.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 813,235.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 693,652.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 539,007.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 516,140.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 386,231.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 364,951.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 6,450.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 454.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,014.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 173.52 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 350.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 222.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 220.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 108.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1941579 | Primary Facility | 2011-01-05 | Compliance Evaluation | No Violations Noted | Water spilled onto pad |
1943362 | Primary Facility | 2010-12-16 | Drilling/Alteration | No Violations Noted | |
1945366 | Primary Facility | 2010-11-04 | Drilling/Alteration | No Violations Noted | |
1947422 | Primary Facility | 2011-02-03 | Routine/Complete Inspection | No Violations Noted | |
1955104 | Primary Facility | 2011-02-22 | Follow-up Inspection | Pending | "fresh water" spill confirmation sampling |
2185755 | Primary Facility | 2013-07-23 | Routine/Complete Inspection | No Violations Noted | |
2367825 | Primary Facility | 2015-05-06 | Routine/Complete Inspection | No Violations Noted | Arrived on Site at 10:55 and departed at 11:10. Weather conditions were sunny ~65°F. No Chesapeake representatives were present during the inspection. |
2435108 | Primary Facility | 2015-12-22 | Routine/Complete Inspection | No Violations Noted | |
2555944 | Primary Facility | 2017-01-27 | Routine/Complete Inspection | No Violations Noted | One well in production phase. One each sand and water separator. No leaks detected from production equipment. Site stable. No violations noted. |
2671009 | Primary Facility | 2017-12-14 | Routine/Complete Inspection | No Violations Noted | Inspection to assess overall site conditions. No violations cited. |
2727681 | Primary Facility | 2018-05-09 | Administrative/File Review | No Violations Noted | The eSubmission Post Drilling Site Restoration Report was submitted to the DEP on 5/2/2018. Based on inspection report 2435113 and 2671009 the Post Drilling Restoration report was accepted on 5/9/2018. |
For data sources see[7]