X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-21748"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-21748
 
| Well ID: 37-019-21748
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.841750, -80.053544 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.841750, -80.053544 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: VOLL UNIT 4H
 
| Farm/Lease Name: VOLL UNIT 4H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2011-03-15
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2010-09-15
 
| Permit Date: 2010-09-15
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.841750
 
| Latitude: 40.841750
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-09-15
 +
| New Permit Application
 +
|-
 +
| 2011-03-15
 +
| Performed Spud Operation
 +
|-
 +
| 2011-09-15
 +
| Permit Renewal Application
 +
|-
 +
| 2012-09-25
 +
| Drilling Completion
 +
|-
 +
| 2012-10-04
 +
| Perforation
 +
|-
 +
| 2015-02-02
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 95:
 
| 2012-10-17
 
| 2012-10-17
 
| 2012-10-17
 
| 2012-10-17
| style="text-align: right;" | 5514.00
+
| style="text-align: right;" | 5,514
| style="text-align: right;" | 5,663,028.0
+
| style="text-align: right;" | 5,663,028
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
|-
 
|-
Line 224: Line 257:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 318: Line 362:
 
| 2019
 
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| style="text-align: right;" | 57,646.00
+
| style="text-align: right;" | 244,955.00
| style="text-align: right;" | 82
+
| style="text-align: right;" | 349
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 31
 
|-
 
|-
 
|}
 
|}
Line 343: Line 387:
 
| 2011
 
| 2011
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Fracing Fluid Waste (in Barrels)
+
| Drill Cuttings
| style="text-align: right;" | 324.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
|-
 
| 2011
 
| [[REX ENERGY OPERATING CORP]]
 
| Drill Cuttings (in Tons)
 
 
| style="text-align: right;" | 41.45 Tons
 
| style="text-align: right;" | 41.45 Tons
 
| LANDFILL
 
| LANDFILL
Line 357: Line 394:
 
| 2011
 
| 2011
 
| [[REX ENERGY OPERATING CORP]]
 
| [[REX ENERGY OPERATING CORP]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 249.20 Tons
 
| style="text-align: right;" | 249.20 Tons
 
| LANDFILL
 
| LANDFILL
 
|  
 
|  
 +
|-
 +
| 2011
 +
| [[REX ENERGY OPERATING CORP]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 324.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Fracing Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 510.00 Bbl
+
| style="text-align: right;" | 2,205.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| EPA ID: 748-163
 
| EPA ID: 748-163
Line 371: Line 415:
 
| 2012
 
| 2012
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Drill Cuttings (in Tons)
+
| Fracing Fluid Waste
| style="text-align: right;" | 536.76 Tons
+
| style="text-align: right;" | 510.00 Bbl
| LANDFILL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 100585
+
| EPA ID: 748-163
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 210.00 Bbl
 
| style="text-align: right;" | 210.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 385: Line 429:
 
| 2012
 
| 2012
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 2,205.00 Bbl
+
| style="text-align: right;" | 105.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| EPA ID: 748-163
+
| 34-155-21438
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Drill Cuttings
| style="text-align: right;" | 105.00 Bbl
+
| style="text-align: right;" | 536.76 Tons
| INJECTION DISPOSAL WELL
+
| LANDFILL
| 34-155-21438
+
| 100585
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,465.00 Bbl
+
| style="text-align: right;" | 1,163.84 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-151-21179
+
| 34-155-23732
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,200.20 Bbl
+
| style="text-align: right;" | 1,365.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-155-21447
+
| EPA ID: 748-163
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 90.18 Bbl
 
| style="text-align: right;" | 90.18 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 420: Line 464:
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,749.78 Bbl
+
| style="text-align: right;" | 1,200.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23759
+
| 34-155-21447
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 3,332.10 Bbl
+
| style="text-align: right;" | 525.00 Bbl
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
|-
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,365.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| EPA ID: 748-163
+
| 3192
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,163.84 Bbl
+
| style="text-align: right;" | 3,332.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23732
+
| 34-155-21438
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 630.00 Bbl
 
| style="text-align: right;" | 630.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 455: Line 492:
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 525.00 Bbl
+
| style="text-align: right;" | 1,465.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| 3192
+
| 34-151-21179
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 630.00 Bbl
 
| style="text-align: right;" | 630.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-24523
 
| 34-007-24523
 
|-
 
|-
| 2014
+
| 2013
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 95.50 Bbl
+
| style="text-align: right;" | 1,749.78 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-151-21179
+
| 34-155-23759
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 105.00 Bbl
 
| style="text-align: right;" | 105.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 3192
 
| 3192
 
|-
 
|-
| 2015
+
| 2014
|  
+
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 206.88 Bbl
+
| style="text-align: right;" | 95.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-21847
+
| 34-151-21179
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 102.00 Bbl
 
| style="text-align: right;" | 102.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 496: Line 533:
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 100.00 Bbl
+
| style="text-align: right;" | 188.54 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-157-25506
 +
|-
 +
| 2015
 +
| [[RE GAS DEV LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 206.88 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23196
+
| 34-007-21847
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 200.40 Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23759
+
| 34-155-23196
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 517: Line 561:
 
|-
 
|-
 
| 2015
 
| 2015
|  
+
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 188.54 Bbl
+
| style="text-align: right;" | 200.40 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-157-25506
+
| 34-155-23759
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 375.00 Bbl
+
| style="text-align: right;" | 270.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| INJECTION DISPOSAL WELL
|  
+
| 34-155-24063
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 220.00 Bbl
 
| style="text-align: right;" | 220.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 539: Line 583:
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 90.00 Bbl
 
| style="text-align: right;" | 90.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 546: Line 590:
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 270.00 Bbl
+
| style="text-align: right;" | 375.00 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-007-21847
+
|  
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 110.00 Bbl
 
| style="text-align: right;" | 110.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 560: Line 604:
 
| 2016
 
| 2016
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 270.00 Bbl
 
| style="text-align: right;" | 270.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-24063
+
| 34-007-21847
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 85.00 Bbl
 
| style="text-align: right;" | 85.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 574: Line 618:
 
| 2017
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 631.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 210.00 Bbl
 
| style="text-align: right;" | 210.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 588: Line 625:
 
| 2017
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 170.00 Bbl
 
| style="text-align: right;" | 170.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 595: Line 632:
 
| 2017
 
| 2017
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 631.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2017
 +
| [[RE GAS DEV LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 514.00 Bbl
 
| style="text-align: right;" | 514.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
Line 602: Line 646:
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 570.00 Bbl
+
| style="text-align: right;" | 1.25 Tons
| INJECTION DISPOSAL WELL
+
| LANDFILL
| 34-155-24079
+
| 06-08438
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 150.00 Bbl
 
| style="text-align: right;" | 150.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 616: Line 660:
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 791.00 Bbl
 
| style="text-align: right;" | 791.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
Line 623: Line 667:
 
| 2018
 
| 2018
 
| [[RE GAS DEV LLC]]
 
| [[RE GAS DEV LLC]]
| Produced Fluid (in Tons) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1.25 Tons
+
| style="text-align: right;" | 570.00 Bbl
| LANDFILL
+
| INJECTION DISPOSAL WELL
| 06-08438
+
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 109.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 101.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-22403
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 163.63 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 61.72 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 283.00 Bbl
+
| style="text-align: right;" | 652.22 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 637: Line 709:
 
| 2019
 
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| [[PENNENERGY RESOURCES LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 90.00 Bbl
+
| style="text-align: right;" | 173.51 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| WMGR123NW009
+
| 34-155-23196
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 175.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 
|-
 
|-
 
|}
 
|}

Latest revision as of 20:52, 21 May 2020

Well Details

Well ID: 37-019-21748
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Connoquenessing Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 149503
Farm/Lease Name: VOLL UNIT 4H
License Status:
Spud Date:
Permit Date: 2010-09-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.841750
Longitude: -80.053544

For data sources see[1][2][3]

Well History

Date Event
2010-09-15 New Permit Application
2011-03-15 Performed Spud Operation
2011-09-15 Permit Renewal Application
2012-09-25 Drilling Completion
2012-10-04 Perforation
2015-02-02 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-10-17 2012-10-17 5,514 5,663,028

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid (Hydrochloric) Frac Tech Services (FTS) Acidizing Hydrochloric acid 7647-01-0 7.50 0.09
NE-100L ICI Non-Emulsifier Isopropanol 67-63-0 10.00 0.00012000
2-Butoxyethanol 111-76-2 10.00 0.00012000
Alkylaryl sulphonic acid 27176-87-0 5.00 0.00006000
Water Rex Energy Base Fluid Water 7732-18-5 100.00 86.82
CS-500 SI ICI Scale Inhibitor Ethylene glycol 107-21-1 10.00 0.00468000
CI-150L ICI Corrosion Inhibitor N,N-Dimethylformamide 68-12-2 10.00 0.00021000
Organic Amine Resin Salt 10.00 0.00021000
Quaternary Ammonium Compound 5.00 0.00011000
Isopropanol 67-63-0 30.00 0.00064000
Aromatic Aldehyde 5.00 0.00011000
FE 100L (Iron Chelator) ICI Iron Control Citric acid 77-92-9 55.00 0.00226000
Sand (Proppant) Vertex Proppant Quartz 14808-60-7 100.00 11.76
FRW-200W ICI Friction Reducer Ethylene glycol 107-21-1 4.00 0.00227000
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
ICI-3240 ICI Bactericide Sodium hydroxide 1310-73-2 4.00 0.00193000
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione 533-74-4 24.00 0.01

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 REX ENERGY OPERATING CORP 0.00 0 0.00 0 0.00 0
2011 REX ENERGY OPERATING CORP 0.00 0 0.00 0 0.00 0
2012 RE GAS DEV LLC 67,579.32 20 0.00 0 0.00 0
2013 RE GAS DEV LLC 733,874.92 365 0.00 0 271.16 365
2014 RE GAS DEV LLC 501,342.29 365 10.42 184 96.62 181
2015 RE GAS DEV LLC 387,718.32 345 0.00 0 81.21 168
2016 RE GAS DEV LLC 343,700.93 359 0.00 0 1.00 29
2017 RE GAS DEV LLC 299,145.00 357 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 297,254.09 359 0.00 0 1.50 31
2019 PENNENERGY RESOURCES LLC 244,955.00 349 0.00 0 0.00 31

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 REX ENERGY OPERATING CORP Drill Cuttings 41.45 Tons LANDFILL NY # 50S08
2011 REX ENERGY OPERATING CORP Drill Cuttings 249.20 Tons LANDFILL
2011 REX ENERGY OPERATING CORP Fracing Fluid Waste 324.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2012 RE GAS DEV LLC Produced Fluid 2,205.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2012 RE GAS DEV LLC Fracing Fluid Waste 510.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2012 RE GAS DEV LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-151-21179
2012 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 RE GAS DEV LLC Drill Cuttings 536.76 Tons LANDFILL 100585
2013 RE GAS DEV LLC Produced Fluid 1,163.84 Bbl INJECTION DISPOSAL WELL 34-155-23732
2013 RE GAS DEV LLC Produced Fluid 1,365.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2013 RE GAS DEV LLC Produced Fluid 90.18 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 RE GAS DEV LLC Produced Fluid 1,200.20 Bbl INJECTION DISPOSAL WELL 34-155-21447
2013 RE GAS DEV LLC Produced Fluid 525.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2013 RE GAS DEV LLC Produced Fluid 3,332.10 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 RE GAS DEV LLC Produced Fluid 630.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2013 RE GAS DEV LLC Produced Fluid 1,465.00 Bbl INJECTION DISPOSAL WELL 34-151-21179
2013 RE GAS DEV LLC Produced Fluid 630.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2013 RE GAS DEV LLC Produced Fluid 1,749.78 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 RE GAS DEV LLC Produced Fluid 105.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2014 RE GAS DEV LLC Produced Fluid 95.50 Bbl INJECTION DISPOSAL WELL 34-151-21179
2015 RE GAS DEV LLC Produced Fluid 102.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 RE GAS DEV LLC Produced Fluid 188.54 Bbl INJECTION DISPOSAL WELL 34-157-25506
2015 RE GAS DEV LLC Produced Fluid 206.88 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 RE GAS DEV LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2015 RE GAS DEV LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2015 RE GAS DEV LLC Produced Fluid 200.40 Bbl INJECTION DISPOSAL WELL 34-155-23759
2016 RE GAS DEV LLC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-155-24063
2016 RE GAS DEV LLC Produced Fluid 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-157-25506
2016 RE GAS DEV LLC Produced Fluid 375.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RE GAS DEV LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-155-24063
2017 RE GAS DEV LLC Produced Fluid 210.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RE GAS DEV LLC Produced Fluid 170.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2017 RE GAS DEV LLC Produced Fluid 631.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 RE GAS DEV LLC Produced Fluid 514.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 1.25 Tons LANDFILL 06-08438
2018 RE GAS DEV LLC Produced Fluid 150.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 RE GAS DEV LLC Produced Fluid 791.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 570.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 109.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 101.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 163.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 61.72 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 652.22 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 173.51 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 175.00 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1964616 Primary Facility 2011-04-08 Drilling/Alteration No Violations Noted
2101546 Primary Facility 2012-09-21 Drilling/Alteration No Violations Noted
2126153 Primary Facility 2012-12-27 Routine/Partial Inspection No Violations Noted
2196315 Primary Facility 2013-08-15 Routine/Partial Inspection No Violations Noted
2291487 Primary Facility 2014-07-10 Site Restoration No Violations Noted
2406516 Primary Facility 2015-09-10 Routine/Partial Inspection No Violations Noted
2689737 Primary Facility 2018-02-01 Routine/Partial/Aerial Inspection No Violations Noted On 2/01/2018, WQS Brian MacQuarrie onsite. Sign maintained at entrance from Woodlands Road. Access road maintained. Well pad fenced in and locked. Two wells properly tagged and in production. Six 300 bbl ( four produced fluid and two condensate) tanks installed within steel secondary containment structure. Two gas processing units also installed within secondary steel containment structure. No apparent issues.

For data sources see[8]

References