X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-22218"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-22218
 
| Well ID: 37-019-22218
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.874161, -79.761027 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.874161, -79.761028 | width=100% | height=100% }}
 
|-
 
|-
| County:
+
| Country: United States
 
|-
 
|-
| Municipality:
+
| State: Pennsylvania
 +
|-
 +
| County: [[Butler_County,_Pennsylvania|Butler]]
 +
|-
 +
| Municipality: [[Clearfield Township,_Butler_County,_Pennsylvania|Clearfield Township]]
 
|-
 
|-
 
| Operator Name: [[XTO ENERGY INC]]
 
| Operator Name: [[XTO ENERGY INC]]
 
|-
 
|-
| Well Pad Name:
+
| Well Pad ID: [[150937]]
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name: BERGBIGLER A UNIT 2H
 
|-
 
|-
| First Permit Date: 2014-03-27
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2014-03-27
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2014-10-04
+
| Permit Date: 2014-03-27
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing:
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: 0
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.874161
 
| Latitude: 40.874161
 
|-
 
|-
| Longitude: -79.761027
+
| Longitude: -79.761028
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2014-03-27
 +
| New Permit Application
 +
|-
 +
| 2014-10-04
 +
| Performed Spud Operation
 +
|-
 +
| 2015-02-20
 +
| Drilling Completion
 +
|-
 +
| 2015-07-15
 +
| Perforation
 +
|-
 +
| 2015-10-14
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2015-07-15
 +
| 2015-08-06
 +
| style="text-align: right;" | 5,990
 +
| style="text-align: right;" | 12,174,600
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="19"| 1
 +
| rowspan="9"| Acid Inhibitor, Unihib G
 +
| rowspan="9"| GeoSafe
 +
| rowspan="9"| Acid Inhibitor
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00001331
 +
| style="text-align: right;" | 15.093
 +
|-
 +
| Short chained glycol ether
 +
| 112-34-5
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.000159746
 +
| style="text-align: right;" | 181.116
 +
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 20
 +
| style="text-align: right;" | 0.00223756
 +
| style="text-align: right;" | 2536.88
 +
|-
 +
| Other - (non-hazardous)
 +
| NA
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00335634
 +
| style="text-align: right;" | 3805.32
 +
|-
 +
| Acetophenone
 +
| 98-86-2
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000266
 +
| style="text-align: right;" | 3.019
 +
|-
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 50
 +
| style="text-align: right;" | 0.0055939
 +
| style="text-align: right;" | 6342.2
 +
|-
 +
| Thiourea
 +
| 62-56-6
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000266
 +
| style="text-align: right;" | 3.019
 +
|-
 +
| Ethoxylated alcohol
 +
| 68002-97-1
 +
| style="text-align: right;" | 35
 +
| style="text-align: right;" | 0.00009319
 +
| style="text-align: right;" | 105.651
 +
|-
 +
| Formaldehyde
 +
| 50-00-0
 +
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 0.00000266
 +
| style="text-align: right;" | 3.019
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"| XTO
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 89.61
 +
| style="text-align: right;" | 101,597,000.0
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| Hydrochloric Acid (7.5%)
 +
| rowspan="4"| Axiall
 +
| rowspan="4"| Acidizing
 +
| Other - (non-hazardous)
 +
| NA
 +
| style="text-align: right;" | 92.5
 +
| style="text-align: right;" | 0.576514
 +
| style="text-align: right;" | 653635
 +
|-
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.5
 +
| style="text-align: right;" | 0.0247745
 +
| style="text-align: right;" | 28088.6
 +
|-
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.5
 +
| style="text-align: right;" | 0.0102838
 +
| style="text-align: right;" | 11659.4
 +
|-
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.5
 +
| style="text-align: right;" | 0.0116861
 +
| style="text-align: right;" | 13249.4
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Scale Inhibitor, ScaleHib A
 +
| rowspan="2"| Nalco
 +
| rowspan="2"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00324263
 +
| style="text-align: right;" | 3676.4
 +
|-
 +
| Other - (non-hazardous)
 +
| NA
 +
| style="text-align: right;" | 70
 +
| style="text-align: right;" | 0.00756613
 +
| style="text-align: right;" | 8578.27
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand (Proppant)
 +
| rowspan="1"| Universal
 +
| rowspan="1"| Proppant
 +
| Silica Substrate
 +
| NA
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 9.6822
 +
| style="text-align: right;" | 10,977,400.0
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Friction Reducer, Unislick ST-50
 +
| rowspan="2"| CESI Chemical
 +
| rowspan="2"| Friction Reducer
 +
| Other - (non-hazardous)
 +
| NA
 +
| style="text-align: right;" | 70
 +
| style="text-align: right;" | 0.0435683
 +
| style="text-align: right;" | 49396.5
 +
|-
 +
| Petroleum distillates, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0186721
 +
| style="text-align: right;" | 21169.9
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2014
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 87,114.00
 +
| style="text-align: right;" | 44
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 602,525.00
 +
| style="text-align: right;" | 336
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 40.00
 +
| style="text-align: right;" | 94
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 216,641.00
 +
| style="text-align: right;" | 162
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 349,688.13
 +
| style="text-align: right;" | 356
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1.67
 +
| style="text-align: right;" | 31
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 383,068.38
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2014
!scope="col" | FACILITY STATE
+
| [[XTO ENERGY INC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 519.41 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,160.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 560.07 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8,531.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,474.40 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 22.50 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,772.10 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,096.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 12,356.70 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 7,479.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 115.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,266.90 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,097.51 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 365.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 917.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 416.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,659.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 54.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 303.94 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 440.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 7,245.20 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 85.46 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,880.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 475.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,021.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 937.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
+
|-
 +
| 2311235
 +
| Primary Facility
 +
| 2014-10-07
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2316194
 +
| Primary Facility
 +
| 2014-10-28
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2345015
 +
| Primary Facility
 +
| 2015-02-18
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2390579
 +
| Primary Facility
 +
| 2015-07-16
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2444164
 +
| Primary Facility
 +
| 2016-01-26
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2523292
 +
| Primary Facility
 +
| 2016-09-27
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2698886
 +
| Primary Facility
 +
| 2018-02-27
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| On site for a routine partial inspection.
 +
 
 +
All wells on site are in production. Well tags in place. Wellheads fenced.
 +
 
 +
Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad.
 +
 
 +
All temporary E/S controls removed.  PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated.
 +
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 21:39, 21 May 2020

Well Details

Well ID: 37-019-22218
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clearfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 150937
Farm/Lease Name: BERGBIGLER A UNIT 2H
License Status:
Spud Date:
Permit Date: 2014-03-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.874161
Longitude: -79.761028

For data sources see[1][2][3]

Well History

Date Event
2014-03-27 New Permit Application
2014-10-04 Performed Spud Operation
2015-02-20 Drilling Completion
2015-07-15 Perforation
2015-10-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-15 2015-08-06 5,990 12,174,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Methanol 67-56-1 5 0.00001331 15.093
Short chained glycol ether 112-34-5 60 0.000159746 181.116
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.00223756 2536.88
Other - (non-hazardous) NA 30 0.00335634 3805.32
Acetophenone 98-86-2 1 0.00000266 3.019
Polyethylene Glycol 25322-68-3 50 0.0055939 6342.2
Thiourea 62-56-6 1 0.00000266 3.019
Ethoxylated alcohol 68002-97-1 35 0.00009319 105.651
Formaldehyde 50-00-0 1 0.00000266 3.019
Water XTO Carrier/Base Fluid Water 7732-18-5 100 89.61 101,597,000.0
Hydrochloric Acid (7.5%) Axiall Acidizing Other - (non-hazardous) NA 92.5 0.576514 653635
Hydrochloric Acid 7647-01-0 7.5 0.0247745 28088.6
Hydrochloric Acid 7647-01-0 7.5 0.0102838 11659.4
Hydrochloric Acid 7647-01-0 7.5 0.0116861 13249.4
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00324263 3676.4
Other - (non-hazardous) NA 70 0.00756613 8578.27
Sand (Proppant) Universal Proppant Silica Substrate NA 100 9.6822 10,977,400.0
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0435683 49396.5
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0186721 21169.9

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 87,114.00 44 0.00 0 0.00 0
2016 XTO ENERGY INC 602,525.00 336 0.00 0 40.00 94
2017 XTO ENERGY INC 216,641.00 162 0.00 0 0.00 0
2018 XTO ENERGY INC 349,688.13 356 0.00 0 1.67 31
2019 XTO ENERGY INC 383,068.38 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 519.41 Tons LANDFILL 100585
2015 XTO ENERGY INC Produced Fluid 2,160.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Drill Cuttings 560.07 Tons LANDFILL 100585
2015 XTO ENERGY INC Produced Fluid 8,531.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 1,474.40 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Fracing Fluid Waste 22.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,772.10 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 1,096.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 12,356.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 7,479.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 115.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 1,266.90 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 1,097.51 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 365.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 917.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 416.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 2,659.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Other Oil & Gas Wastes 54.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 303.94 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 440.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 7,245.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 85.46 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 2,880.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 475.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 2,021.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 937.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2311235 Primary Facility 2014-10-07 Routine/Partial Inspection No Violations Noted
2316194 Primary Facility 2014-10-28 Drilling/Alteration No Violations Noted
2345015 Primary Facility 2015-02-18 Drilling/Alteration No Violations Noted
2390579 Primary Facility 2015-07-16 Drilling/Alteration No Violations Noted
2444164 Primary Facility 2016-01-26 Routine/Partial Inspection No Violations Noted
2523292 Primary Facility 2016-09-27 Routine/Partial Inspection No Violations Noted
2698886 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

All wells on site are in production. Well tags in place. Wellheads fenced.

Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad.

All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated.

For data sources see[8]

References