X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-22219"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-22219
 
| Well ID: 37-019-22219
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.874158, -79.761136 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.874158, -79.761136 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: BERGBIGLER A UNIT 3H
 
| Farm/Lease Name: BERGBIGLER A UNIT 3H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2014-10-04
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2014-03-27
 
| Permit Date: 2014-03-27
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.874158
 
| Latitude: 40.874158
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2014-03-27
 +
| New Permit Application
 +
|-
 +
| 2014-10-04
 +
| Performed Spud Operation
 +
|-
 +
| 2015-01-20
 +
| Drilling Completion
 +
|-
 +
| 2015-07-14
 +
| Perforation
 +
|-
 +
| 2015-11-20
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 92:
 
| 2015-07-15
 
| 2015-07-15
 
| 2015-08-05
 
| 2015-08-05
| style="text-align: right;" | 5990
+
| style="text-align: right;" | 5,990
| style="text-align: right;" | 9,294,080.0
+
| style="text-align: right;" | 9,294,080
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 252: Line 282:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 310: Line 351:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 58,337.49
+
| style="text-align: right;" | 186,832.06
| style="text-align: right;" | 90
+
| style="text-align: right;" | 303
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 3.34
+
| style="text-align: right;" | 3.76
| style="text-align: right;" | 90
+
| style="text-align: right;" | 114
 
|-
 
|-
 
|}
 
|}
Line 335: Line 376:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 650.23 Tons
 
| style="text-align: right;" | 650.23 Tons
 
| LANDFILL
 
| LANDFILL
Line 342: Line 383:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 7,493.80 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
|-
 
| 2015
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 2,931.50 Bbl
 
| style="text-align: right;" | 2,931.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 356: Line 390:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 393.97 Tons
 
| style="text-align: right;" | 393.97 Tons
 
| LANDFILL
 
| LANDFILL
Line 363: Line 397:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 7,493.80 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1,205.10 Bbl
 
| style="text-align: right;" | 1,205.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 370: Line 411:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
 
| style="text-align: right;" | 22.50 Bbl
 
| style="text-align: right;" | 22.50 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 377: Line 418:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2,598.70 Bbl
 
| style="text-align: right;" | 2,598.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 384: Line 425:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 7,538.71 Bbl
+
| style="text-align: right;" | 1,101.50 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 14,107.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,101.50 Bbl
+
| style="text-align: right;" | 7,538.71 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-133-21076
+
| WMGR123NW009
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,458.50 Bbl
 
| style="text-align: right;" | 1,458.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|  34-133-24189
 
|-
 
|-
| 2016
+
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 14,107.00 Bbl
+
| style="text-align: right;" | 2,523.70 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| INJECTION DISPOSAL WELL
| WMGR123NW009
+
| 34-133-21076
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 830.65 Bbl
 
| style="text-align: right;" | 830.65 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 419: Line 467:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2,198.61 Bbl
 
| style="text-align: right;" | 2,198.61 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 426: Line 474:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,653.65 Bbl
 
| style="text-align: right;" | 1,653.65 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 433: Line 481:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 4,625.77 Bbl
 
| style="text-align: right;" | 4,625.77 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 440: Line 488:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
 
| style="text-align: right;" | 54.00 Bbl
 
| style="text-align: right;" | 54.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2017
+
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 2,523.70 Bbl
+
| style="text-align: right;" | 160.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-21076
+
| 34-133-24189
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 12,553.44 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 419.00 Bbl
 
| style="text-align: right;" | 419.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 468: Line 509:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 160.00 Bbl
+
| style="text-align: right;" | 12,553.44 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-133-24189
+
| WMGR123NW009
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 249.28 Bbl
 
| style="text-align: right;" | 249.28 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 482: Line 523:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 231.43 Bbl
+
| style="text-align: right;" | 3,109.00 Bbl
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2019
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,172.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
Line 496: Line 530:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 243.01 Bbl
+
| style="text-align: right;" | 1,326.48 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|  34-133-24189
Line 503: Line 537:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 987.00 Bbl
+
| style="text-align: right;" | 2,224.86 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
| 34-133-24096
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 858.39 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 
|-
 
|-
 
|}
 
|}

Latest revision as of 21:39, 21 May 2020

Well Details

Well ID: 37-019-22219
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clearfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 150937
Farm/Lease Name: BERGBIGLER A UNIT 3H
License Status:
Spud Date:
Permit Date: 2014-03-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.874158
Longitude: -79.761136

For data sources see[1][2][3]

Well History

Date Event
2014-03-27 New Permit Application
2014-10-04 Performed Spud Operation
2015-01-20 Drilling Completion
2015-07-14 Perforation
2015-11-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-15 2015-08-05 5,990 9,294,080 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.0019367 1682.89
Hydrochloric Acid 7647-01-0 15 0.00170429 1480.94
Hydrochloric Acid 7647-01-0 15 0.0041058 3567.73
Other - (non-hazardous) NA 85 0.0438985 38145.5
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Acetophenone 98-86-2 1 0.00000276 2.399
Short chained glycol ether 112-34-5 60 0.000165676 143.964
Polyethylene Glycol 25322-68-3 50 0.00525794 4568.89
Thiourea 62-56-6 1 0.00000276 2.399
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.00210318 1827.56
Other - (non-hazardous) NA 30 0.00315477 2741.33
Methanol 67-56-1 5 0.00001381 11.997
Formaldehyde 50-00-0 1 0.00000276 2.399
Ethoxylated alcohol 68002-97-1 35 0.00009664 83.979
Water XTO Carrier/Base Fluid Water 7732-18-5 100 89.2561 77,559,100.0
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0377453 32798.8
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0161766 14056.6
Hydrochloric Acid (7.5%) Axiall Acidizing Other - (non-hazardous) NA 92.5 0.497035 431899
Hydrochloric Acid 7647-01-0 7.5 0.00886603 7704.14
Hydrochloric Acid 7647-01-0 7.5 0.0213591 18560
Hydrochloric Acid 7647-01-0 7.5 0.010075 8754.7
Sand (Proppant) Universal Proppant Silica Substrate NA 100 10.0793 8,758,400.0
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0032755 2846.24
Other - (non-hazardous) NA 70 0.00764283 6641.24

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 50,242.00 40 0.00 0 0.00 0
2016 XTO ENERGY INC 605,984.00 328 0.00 0 37.91 52
2017 XTO ENERGY INC 136,739.00 155 0.00 0 5.88 33
2018 XTO ENERGY INC 119,439.94 236 0.00 0 0.00 0
2019 XTO ENERGY INC 186,832.06 303 0.00 0 3.76 114

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 650.23 Tons LANDFILL 100585
2015 XTO ENERGY INC Produced Fluid 2,931.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Drill Cuttings 393.97 Tons LANDFILL 100585
2015 XTO ENERGY INC Produced Fluid 7,493.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 1,205.10 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Fracing Fluid Waste 22.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 2,598.70 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 1,101.50 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 14,107.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 7,538.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,458.50 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 2,523.70 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 830.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 2,198.61 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 1,653.65 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 4,625.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Other Oil & Gas Wastes 54.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 160.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 419.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 12,553.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 249.28 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 3,109.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 1,326.48 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 2,224.86 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 858.39 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2311236 Primary Facility 2014-10-07 Routine/Partial Inspection No Violations Noted
2313709 Primary Facility 2014-10-15 Routine/Partial Inspection No Violations Noted
2338040 Primary Facility 2015-01-21 Routine/Partial Inspection No Violations Noted
2444161 Primary Facility 2016-01-26 Routine/Partial Inspection No Violations Noted
2523287 Primary Facility 2016-09-27 Routine/Partial Inspection No Violations Noted
2698891 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

All wells on site are in production. Well tags in place. Wellheads fenced.

Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad.

All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated.

For data sources see[8]

References