X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-023-20165"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-023-20165
 
| Well ID: 37-023-20165
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.605061, -78.351325 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.605061, -78.351325 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: SRC WT 5041 23H 50716
 
| Farm/Lease Name: SRC WT 5041 23H 50716
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2014-03-28
+
| Spud Date: 2014-03-29
 
|-
 
|-
 
| Permit Date: 2014-03-21
 
| Permit Date: 2014-03-21
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.605061
 
| Latitude: 41.605061
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2014-03-21
 +
| New Permit Application
 +
|-
 +
| 2014-03-28
 +
| Performed Spud Operation
 +
|-
 +
| 2014-07-05
 +
| Drilling Completion
 +
|-
 +
| 2014-08-18
 +
| Perforation
 +
|-
 +
| 2015-03-30
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 92:
 
| 2014-08-18
 
| 2014-08-18
 
| 2014-08-31
 
| 2014-08-31
| style="text-align: right;" | 6024
+
| style="text-align: right;" | 6,024
| style="text-align: right;" | 14,679,800.0
+
| style="text-align: right;" | 14,679,800
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 226: Line 256:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 284: Line 325:
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| style="text-align: right;" | 87,384.03
+
| style="text-align: right;" | 338,248.67
| style="text-align: right;" | 90
+
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 309: Line 350:
 
| 2014
 
| 2014
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 457.10 Tons
 
| style="text-align: right;" | 457.10 Tons
 
| LANDFILL
 
| LANDFILL
Line 316: Line 357:
 
| 2014
 
| 2014
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 640.20 Tons
 
| style="text-align: right;" | 640.20 Tons
 
| LANDFILL
 
| LANDFILL
Line 323: Line 364:
 
| 2015
 
| 2015
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Fracing Fluid Waste (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 8,311.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW011
 +
|-
 +
| 2015
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 80.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2015
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Fracing Fluid Waste
 
| style="text-align: right;" | 20.89 Bbl
 
| style="text-align: right;" | 20.89 Bbl
 
| LANDFILL
 
| LANDFILL
Line 330: Line 385:
 
| 2015
 
| 2015
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Servicing Fluid (in Barrels)
+
| Servicing Fluid
 
| style="text-align: right;" | 85.00 Bbl
 
| style="text-align: right;" | 85.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 337: Line 392:
 
| 2015
 
| 2015
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 37.76 Tons
 
| style="text-align: right;" | 37.76 Tons
 
| LANDFILL
 
| LANDFILL
Line 344: Line 399:
 
| 2015
 
| 2015
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Fracing Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 80.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123
 
|-
 
| 2015
 
| [[SENECA RESOURCES CO LLC]]
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 53,940.00 Bbl
 
| style="text-align: right;" | 53,940.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
|-
 
| 2015
 
| [[SENECA RESOURCES CO LLC]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 8,311.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW011
 
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Fracturing Fluid Waste (in Barrels) RWC 805
+
| Synthetic Liner Materials
| style="text-align: right;" | 10.56 Bbl
+
| style="text-align: right;" | 0.39 Tons
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| LANDFILL
| WMGR123
+
| 100361
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 5,281.00 Bbl
 
| style="text-align: right;" | 5,281.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 379: Line 420:
 
| 2016
 
| 2016
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
 
| style="text-align: right;" | 181.80 Bbl
 
| style="text-align: right;" | 181.80 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 386: Line 427:
 
| 2016
 
| 2016
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 50,755.27 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW011
 +
|-
 +
| 2016
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 20,729.70 Bbl
 
| style="text-align: right;" | 20,729.70 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 393: Line 441:
 
| 2016
 
| 2016
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Synthetic Liner Materials (in Tons) RWC 806
+
| Produced Fluid
| style="text-align: right;" | 0.39 Tons
+
| style="text-align: right;" | 40.00 Bbl
| LANDFILL
 
| 100361
 
|-
 
| 2016
 
| [[SENECA RESOURCES CO LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50,755.27 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123NW011
+
| WMGR123NW005
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Fracturing Fluid Waste
| style="text-align: right;" | 40.00 Bbl
+
| style="text-align: right;" | 10.56 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NW005
+
| WMGR123
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 3,651.00 Bbl
+
| style="text-align: right;" | 59.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
Line 421: Line 462:
 
| 2017
 
| 2017
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 151.16 Bbl
+
| style="text-align: right;" | 160.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40,960.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
| WMGR123NW011
Line 428: Line 476:
 
| 2017
 
| 2017
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid
| style="text-align: right;" | 59.00 Bbl
+
| style="text-align: right;" | 3,651.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017
+
| 2018
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 39,975.33 Bbl
+
| style="text-align: right;" | 16,707.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
| WMGR123NW011
Line 442: Line 490:
 
| 2018
 
| 2018
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid
 +
| style="text-align: right;" | 871.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D025BELK
 +
|-
 +
| 2018
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 737.50 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Other Oil & Gas Wastes
 
| style="text-align: right;" | 67.50 Bbl
 
| style="text-align: right;" | 67.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 449: Line 511:
 
| 2018
 
| 2018
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 65.00 Bbl
 
| style="text-align: right;" | 65.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2018
+
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 871.67 Bbl
+
| style="text-align: right;" | 16.67 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| PAS2D025BELK
+
| 34-007-24355
 
|-
 
|-
| 2018
+
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 737.50 Bbl
+
| style="text-align: right;" | 35.00 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE TRANSFER FACILITY
|  
+
| WMGR123NC039
 
|-
 
|-
| 2018
+
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 16,707.50 Bbl
+
| style="text-align: right;" | 9,758.66 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
| WMGR123NW011
Line 477: Line 546:
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 163.33 Bbl
+
| style="text-align: right;" | 16.67 Bbl
| REUSE (AT WELL PAD)
+
| INJECTION DISPOSAL WELL
|  
+
| 34-133-20525
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 2,263.66 Bbl
+
| style="text-align: right;" | 91.66 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
| WMGR123NW011
Line 491: Line 560:
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 380.00 Bbl
+
| style="text-align: right;" | 309.99 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 16.67 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| PAS2D025BELK
+
| 34-155-21893
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid
| style="text-align: right;" | 73.33 Bbl
+
| style="text-align: right;" | 1,760.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| WMGR123NW011
+
| PAS2D025BELK
 
|-
 
|-
 
|}
 
|}

Latest revision as of 05:08, 22 May 2020

Well Details

Well ID: 37-023-20165
Loading map...
Country: United States
State: Pennsylvania
County: Cameron
Municipality: Shippen Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 150752
Farm/Lease Name: SRC WT 5041 23H 50716
License Status:
Spud Date: 2014-03-29
Permit Date: 2014-03-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.605061
Longitude: -78.351325

For data sources see[1][2][3]

Well History

Date Event
2014-03-21 New Permit Application
2014-03-28 Performed Spud Operation
2014-07-05 Drilling Completion
2014-08-18 Perforation
2015-03-30 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-18 2014-08-31 6,024 14,679,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15% HydroChloric Acid Trican Chemical Hydrochloric Acid HCl 7647-01-0 15 0.00208984 0
Proppant 40/70 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 5.82596 0
FR-15 Trican Friction Reducer Proprietary Amide Proprietary 2.5 0.00180322 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 25 0.0180322 0
Proppant 80/100 Oklahoma Trican Proppant Silica 14808-60-7 100 0.600135 0
Sl-7 Trican Scale Inhibitor Ethylene glycol 107-21-1 30 0.00826563 0
Proppant 30/50 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 5.58209 0
MBC 516 Trican Biocide Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.00080541 0
N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00053371 0
Ethanol 64-17-5 2.8 0.00027171 0
Glutaraldehyde 111-30-8 27 0.00262002 0
7.5% HydroChloric Acid Trican Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0329149 0
AL-7NR Trican Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00001006 0
FEAC 20 Trican Iron Control Acetic acid 64-19-7 50 0.00035585 0
Citric acid 77-92-9 30 0.00021351 0
Water Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 87.9239 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2015 SENECA RESOURCES CO LLC 387,322.00 140 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 546,771.97 259 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 492,260.10 327 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 424,849.87 360 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 338,248.67 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 SENECA RESOURCES CO LLC Drill Cuttings 457.10 Tons LANDFILL 101397
2014 SENECA RESOURCES CO LLC Drill Cuttings 640.20 Tons LANDFILL 100361
2015 SENECA RESOURCES CO LLC Produced Fluid 8,311.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SENECA RESOURCES CO LLC Fracing Fluid Waste 80.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SENECA RESOURCES CO LLC Fracing Fluid Waste 20.89 Bbl LANDFILL 101397
2015 SENECA RESOURCES CO LLC Servicing Fluid 85.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SENECA RESOURCES CO LLC Drill Cuttings 37.76 Tons LANDFILL 100361
2015 SENECA RESOURCES CO LLC Produced Fluid 53,940.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Synthetic Liner Materials 0.39 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Produced Fluid 5,281.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 181.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 50,755.27 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 20,729.70 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Produced Fluid 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 SENECA RESOURCES CO LLC Fracturing Fluid Waste 10.56 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 59.00 Bbl REUSE (AT WELL PAD)
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 160.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 40,960.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 3,651.00 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 16,707.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 871.67 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Produced Fluid 737.50 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 67.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 16.67 Bbl INJECTION DISPOSAL WELL 34-007-24355
2019 SENECA RESOURCES CO LLC Produced Fluid 35.00 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Produced Fluid 9,758.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 16.67 Bbl INJECTION DISPOSAL WELL 34-133-20525
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 91.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 309.99 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Produced Fluid 16.67 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 SENECA RESOURCES CO LLC Produced Fluid 1,760.00 Bbl INJECTION DISPOSAL WELL PAS2D025BELK

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2259717 Primary Facility 2014-04-02 Routine/Complete Inspection No Violations Noted
2270645 Primary Facility 2014-05-14 Routine/Complete Inspection No Violations Noted
2284141 Primary Facility 2014-07-02 Routine/Complete Inspection No Violations Noted
2286499 Primary Facility 2014-06-30 Routine/Complete Inspection No Violations Noted
2296806 Primary Facility 2014-08-20 Routine/Complete Inspection No Violations Noted
2308811 Primary Facility 2014-09-30 Routine/Complete Inspection No Violations Noted
2337035 Primary Facility 2015-01-14 Routine/Complete Inspection No Violations Noted At the time of inspection 1230pm, clear sky, 25 degrees F, light snow cover
2344157 Primary Facility 2015-02-12 Routine/Complete Inspection No Violations Noted At the time of inspection sunny sky, 30 degrees F, 20” snow cover.
2358097 Primary Facility 2015-04-02 Routine/Complete Inspection No Violations Noted
2379735 Primary Facility 2015-06-17 Routine/Complete Inspection No Violations Noted
2408203 Primary Facility 2015-09-10 Routine/Complete Inspection No Violations Noted
2491506 Primary Facility 2016-06-01 Routine/Complete Inspection No Violations Noted
2552067 Primary Facility 2017-01-12 Routine/Complete Inspection No Violations Noted
2575248 Primary Facility 2017-03-27 Routine/Complete Inspection No Violations Noted C09D well pad occupied by (6) Marcellus wells. All wells tagged with API/Permit number at the flowline off each wellhead. All cellars full with rainwater to nearly pad elevation, frozen today. (6) skid-mounted production units serving the wells are spotted in a modular secondary containment. Production fluids separator dump lines are plumbed to (3) 400 bbl. vertical, steel production fluids tanks spotted in a modular secondary containment. Containments serving the production units and fluids tanks show 1"-2" rainwater, frozen at this inspection. Keystone Clearwater personnel on location activating the temporary diesel transfer pumps used to pump production fluids generated at the C08G pad and this pad, into the temporary, aboveground HDPE pipeline to the Clermont water management facility, for re-use during well stimulation on other Seneca locations.
    Centralized freshwater impoundment in the shared C08F LOD shows 8'+ freeboard and is frozen.  Since last previous inspection, a new ditchline has been
2693512 Primary Facility 2018-02-09 Routine/Complete Inspection No Violations Noted Routine site inspection of Seneca Resources Rich Valley Pad F and Freshwater Impoundment (FWI) on February 9, 2018. No one was onsite during my inspection.

The site sign, PPC plan, emergency response plan, and weekly inspection logs were onsite for review. The site and surrounding areas were covered in snow. No E & S issues were observed during the time of my inspection.

There are (6) producing Marcellus wells located on this pad (023-20160, 023-20161, 023-20162, 023-20163, 023-20164, and 023-20165). All well-heads are tagged with API/Permit number. All well cellars were frozen. There are (6) GPU's stationed on the pad and (3) 400 bbl. vertical, steel production fluids tanks spotted in a modular secondary containment. Water within this containment was frozen. I observed some rusting streaks on the exterior of the produced fluids tanks. The Department recommends the operator continue to monitor the tanks and replace them if needed.

A Freshwater Impoundment (FWI) falls under this ESCGP. The FWI is enclo

2749079 Primary Facility 2018-07-03 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production.
2849198 Primary Facility 2019-03-06 Routine/Complete Inspection No Violations Noted At the time of this inspection this well as in production. A digital gauge on the well head assembly was showing a pressure of 543 psi ( pounds per square inch ) . There are three (3) annulus vents on this well that are vented to surface. These vents were tested for combustible gas with a Altair 5 x Multi Gas Meter. Results of this testing was 0% LEL ( lower explosion limit) and 0% Methane on the 20" x 13 3/8" vent. 0% LEL and 0% Methane on the 13 3/8" x 9 5/8" vent and 100% LEL and 100% Methane on the 9 5/8" x 5 1/2" vent. No violations were noted at this inspection.
2850620 Primary Facility 2019-03-06 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection of Seneca Resources Rich Valley Pad F and Freshwater Impoundment (FWI) on March 6, 2019.

The well pad and surrounding areas were snow covered. No E&S issues were observed during the time of my inspection. No staining or spills were observed on the well pad.

There are (6) producing Marcellus wells located on this pad (023-20160, 023-20161, 023-20162, 023-20163, 023-20164, and 023-20165). All well-heads are tagged with API/Permit number. All well cellars were frozen. There are (6) GPU's stationed on the pad and (3) 400 bbl. vertical, steel production fluids tanks spotted in a modular secondary containment. Water within this containment was frozen. I observed some rusting streaks on the exterior of the produced fluids tanks. The Department recommends the operator continue to monitor the tanks and replace them if needed.

An approved extension of the well pad on the SW end remains in place ~ 350' L x 140' W. Currently road equipment

For data sources see[8]

References