If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-033-20318 | | Well ID: 37-033-20318 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.126880, -78.766963 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: BALTIMORE & OHIO RR 1 | | Farm/Lease Name: BALTIMORE & OHIO RR 1 | ||
|- | |- | ||
− | | License Status: | + | | License Status: ACTIVE |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: | | Permit Date: | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.126880 | | Latitude: 41.126880 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1960-01-01 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | | 1960-07-25 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 1960-08-06 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 95: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 86: | Line 121: | ||
|- | |- | ||
| 1980 | | 1980 | ||
− | | | + | | style="text-align: right;" | |
| style="text-align: right;" | 86,903.00 | | style="text-align: right;" | 86,903.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 95: | Line 130: | ||
|- | |- | ||
| 1981 | | 1981 | ||
− | | | + | | style="text-align: right;" | |
| style="text-align: right;" | 77,760.00 | | style="text-align: right;" | 77,760.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 104: | Line 139: | ||
|- | |- | ||
| 1982 | | 1982 | ||
− | | | + | | style="text-align: right;" | |
| style="text-align: right;" | 44,756.00 | | style="text-align: right;" | 44,756.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 113: | Line 148: | ||
|- | |- | ||
| 1983 | | 1983 | ||
− | | | + | | style="text-align: right;" | |
| style="text-align: right;" | 13,704.00 | | style="text-align: right;" | 13,704.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 122: | Line 157: | ||
|- | |- | ||
| 1984 | | 1984 | ||
− | | | + | | style="text-align: right;" | |
| style="text-align: right;" | 26,052.00 | | style="text-align: right;" | 26,052.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 131: | Line 166: | ||
|- | |- | ||
| 1985 | | 1985 | ||
− | | | + | | style="text-align: right;" | |
| style="text-align: right;" | 25,819.00 | | style="text-align: right;" | 25,819.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 140: | Line 175: | ||
|- | |- | ||
| 1991 | | 1991 | ||
− | | | + | | style="text-align: right;" | |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 12469.00 |
| style="text-align: right;" | 275 | | style="text-align: right;" | 275 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 150: | Line 185: | ||
| 2000 | | 2000 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2901 |
| style="text-align: right;" | 120 | | style="text-align: right;" | 120 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 159: | Line 194: | ||
| 2001 | | 2001 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 23522 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 168: | Line 203: | ||
| 2002 | | 2002 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 24175 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 176: | Line 211: | ||
|- | |- | ||
| 2003 | | 2003 | ||
− | | | + | | style="text-align: right;" | |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 21543 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 186: | Line 221: | ||
| 2004 | | 2004 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 24224 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 195: | Line 230: | ||
| 2007 | | 2007 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 21677.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 204: | Line 239: | ||
| 2008 | | 2008 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 15197.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 213: | Line 248: | ||
| 2009 | | 2009 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 12035.00 |
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 336: | Line 371: | ||
| The weather is 54 Deg. F and sunny at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore & Ohio RR Pad, Well # 1 on October 17, 2018. There is 1 active and producing well on this pad. Line pressure - 58 psi. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2¿ X 8-5/8¿) is closed, (8-5/8" x 13-3/8") is open and vented, cannot verify for gas due to this vent being set deeper inside the cellar. Detected 10% LEL and 0% combustible gas inside the cellar, could not verify exact source of the gas leak. The area around the well is fenced and the gate is closed and locked. No violation noted at time of inspection, but discussed follow up inspection. | | The weather is 54 Deg. F and sunny at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore & Ohio RR Pad, Well # 1 on October 17, 2018. There is 1 active and producing well on this pad. Line pressure - 58 psi. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2¿ X 8-5/8¿) is closed, (8-5/8" x 13-3/8") is open and vented, cannot verify for gas due to this vent being set deeper inside the cellar. Detected 10% LEL and 0% combustible gas inside the cellar, could not verify exact source of the gas leak. The area around the well is fenced and the gate is closed and locked. No violation noted at time of inspection, but discussed follow up inspection. | ||
Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and company owner. | Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and company owner. | ||
+ | DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. | ||
+ | |- | ||
+ | | 2887577 | ||
+ | | Primary Facility | ||
+ | | 2018-12-06 | ||
+ | | Follow-up Inspection | ||
+ | | No Violations Noted | ||
+ | | The weather is 38 Deg. F and cloudy at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore &Ohio RR Pad, Well # 1 on December 6, 2018. There is 1 active and producing well on this pad.. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2 X 8-5/8) is closed, (8-5/8" x 13-3/8") is open and vented. 15% LEL and 0% at the annulus vent. Gas leak inside the cellar, that was detected during previous inspection, has been fixed. Observed bubbling at the low rate inside the cellar. No violation noted at time of inspection, but will continue attending wellsite and monitoring well cellar. | ||
+ | Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and Company Owner. | ||
DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. | DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. | ||
|- | |- |
Well ID: 37-033-20318 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.12688,"lon":-78.766963,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Sandy Township | |
Operator Name: SUSQUEHANNA ENERGIES INC | |
Well Pad ID: | |
Farm/Lease Name: BALTIMORE & OHIO RR 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.126880 | |
Longitude: -78.766963 |
Date | Event |
---|---|
1960-01-01 | NEWLY DRILLED |
1960-07-25 | Performed Spud Operation |
1960-08-06 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1980 | 86,903.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
1981 | 77,760.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
1982 | 44,756.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
1983 | 13,704.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
1984 | 26,052.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
1985 | 25,819.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
1991 | 12469.00 | 275 | 0.00 | 0 | 0.00 | 0 | |
2000 | 2901 | 120 | 0.00 | 0 | 0.00 | 0 | |
2001 | 23522 | 365 | 0.00 | 0 | 0.00 | 0 | |
2002 | 24175 | 365 | 0.00 | 0 | 0.00 | 0 | |
2003 | 21543 | 365 | 0.00 | 0 | 0.00 | 0 | |
2004 | 24224 | 365 | 0.00 | 0 | 0.00 | 0 | |
2007 | 21677.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2008 | 15197.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2009 | 12035.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2010 | 11,907.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2011 | 9,347.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2012 | 9,515.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2013 | 4,703.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2014 | 5,435.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2015 | 6,805.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2016 | SUSQUEHANNA ENERGIES INC | 9,398.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | SUSQUEHANNA ENERGIES INC | 9,829.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | SUSQUEHANNA ENERGIES INC | 7,894.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2792669 | Primary Facility | 2018-10-17 | Routine/Complete Inspection | No Violations Noted | The weather is 54 Deg. F and sunny at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore & Ohio RR Pad, Well # 1 on October 17, 2018. There is 1 active and producing well on this pad. Line pressure - 58 psi. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2¿ X 8-5/8¿) is closed, (8-5/8" x 13-3/8") is open and vented, cannot verify for gas due to this vent being set deeper inside the cellar. Detected 10% LEL and 0% combustible gas inside the cellar, could not verify exact source of the gas leak. The area around the well is fenced and the gate is closed and locked. No violation noted at time of inspection, but discussed follow up inspection.
Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and company owner. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2887577 | Primary Facility | 2018-12-06 | Follow-up Inspection | No Violations Noted | The weather is 38 Deg. F and cloudy at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore &Ohio RR Pad, Well # 1 on December 6, 2018. There is 1 active and producing well on this pad.. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2 X 8-5/8) is closed, (8-5/8" x 13-3/8") is open and vented. 15% LEL and 0% at the annulus vent. Gas leak inside the cellar, that was detected during previous inspection, has been fixed. Observed bubbling at the low rate inside the cellar. No violation noted at time of inspection, but will continue attending wellsite and monitoring well cellar.
Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and Company Owner. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
For data sources see[6]