X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-033-20318"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-033-20318
 
| Well ID: 37-033-20318
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.126880, -78.766963 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.126880, -78.766963 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: BALTIMORE & OHIO RR 1
 
| Farm/Lease Name: BALTIMORE & OHIO RR 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 1960-07-25
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.126880
 
| Latitude: 41.126880
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1960-01-01
 +
| NEWLY DRILLED
 +
|-
 +
| 1960-07-25
 +
| Performed Spud Operation
 +
|-
 +
| 1960-08-06
 +
| Drilling Completion
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 95:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 86: Line 121:
 
|-
 
|-
 
| 1980
 
| 1980
| [[LEE E & M LEE MINTER]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 86,903.00
 
| style="text-align: right;" | 86,903.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 95: Line 130:
 
|-
 
|-
 
| 1981
 
| 1981
| [[LEE E & M LEE MINTER]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 77,760.00
 
| style="text-align: right;" | 77,760.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 104: Line 139:
 
|-
 
|-
 
| 1982
 
| 1982
| [[LEE E & M LEE MINTER]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 44,756.00
 
| style="text-align: right;" | 44,756.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 113: Line 148:
 
|-
 
|-
 
| 1983
 
| 1983
| [[LEE E & M LEE MINTER]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 13,704.00
 
| style="text-align: right;" | 13,704.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 122: Line 157:
 
|-
 
|-
 
| 1984
 
| 1984
| [[LEE E & M LEE MINTER]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 26,052.00
 
| style="text-align: right;" | 26,052.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 131: Line 166:
 
|-
 
|-
 
| 1985
 
| 1985
| [[LEE E & M LEE MINTER]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 25,819.00
 
| style="text-align: right;" | 25,819.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 140: Line 175:
 
|-
 
|-
 
| 1991
 
| 1991
| [[MINTER LEE M]]
+
| style="text-align: right;" |
| style="text-align: right;" | 12,469.00
+
| style="text-align: right;" | 12469.00
 
| style="text-align: right;" | 275
 
| style="text-align: right;" | 275
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 150: Line 185:
 
| 2000
 
| 2000
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
| style="text-align: right;" | 2,901.00
+
| style="text-align: right;" | 2901
 
| style="text-align: right;" | 120
 
| style="text-align: right;" | 120
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 159: Line 194:
 
| 2001
 
| 2001
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
| style="text-align: right;" | 23,522.00
+
| style="text-align: right;" | 23522
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 168: Line 203:
 
| 2002
 
| 2002
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
| style="text-align: right;" | 24,175.00
+
| style="text-align: right;" | 24175
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 176: Line 211:
 
|-
 
|-
 
| 2003
 
| 2003
| [[LEE E & M LEE MINTER]]
+
| style="text-align: right;" |
| style="text-align: right;" | 21,543.00
+
| style="text-align: right;" | 21543
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 186: Line 221:
 
| 2004
 
| 2004
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
| style="text-align: right;" | 24,224.00
+
| style="text-align: right;" | 24224
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 195: Line 230:
 
| 2007
 
| 2007
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
| style="text-align: right;" | 21,677.00
+
| style="text-align: right;" | 21677.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 204: Line 239:
 
| 2008
 
| 2008
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
| style="text-align: right;" | 15,197.00
+
| style="text-align: right;" | 15197.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 213: Line 248:
 
| 2009
 
| 2009
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
| style="text-align: right;" | 12,035.00
+
| style="text-align: right;" | 12035.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 336: Line 371:
 
| The weather is 54 Deg. F and sunny at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore & Ohio RR Pad, Well # 1 on October 17, 2018. There is 1 active and producing well on this pad. Line pressure - 58 psi. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2¿ X 8-5/8¿) is closed, (8-5/8" x 13-3/8") is open and vented, cannot verify for gas due to this vent being set deeper inside the cellar. Detected 10% LEL and 0% combustible gas inside the cellar, could not verify exact source of the gas leak. The area around the well is fenced and the gate is closed and locked. No violation noted at time of inspection, but discussed follow up inspection.  
 
| The weather is 54 Deg. F and sunny at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore & Ohio RR Pad, Well # 1 on October 17, 2018. There is 1 active and producing well on this pad. Line pressure - 58 psi. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2¿ X 8-5/8¿) is closed, (8-5/8" x 13-3/8") is open and vented, cannot verify for gas due to this vent being set deeper inside the cellar. Detected 10% LEL and 0% combustible gas inside the cellar, could not verify exact source of the gas leak. The area around the well is fenced and the gate is closed and locked. No violation noted at time of inspection, but discussed follow up inspection.  
 
Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and company owner.
 
Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and company owner.
 +
DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.
 +
|-
 +
| 2887577
 +
| Primary Facility
 +
| 2018-12-06
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| The weather is 38 Deg. F and cloudy at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore &Ohio RR Pad, Well # 1 on December 6, 2018. There is 1 active and producing well on this pad.. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2 X 8-5/8) is closed, (8-5/8" x 13-3/8") is open and vented. 15% LEL and 0% at the annulus vent. Gas leak inside the cellar, that was detected during previous inspection, has been fixed. Observed bubbling at the low rate inside the cellar. No violation noted at time of inspection, but will continue attending wellsite and monitoring well cellar.
 +
Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and Company Owner.
 
DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.
 
DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.
 
|-
 
|-

Revision as of 20:31, 22 May 2020

Well Details

Well ID: 37-033-20318
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Sandy Township
Operator Name: SUSQUEHANNA ENERGIES INC
Well Pad ID:
Farm/Lease Name: BALTIMORE & OHIO RR 1
License Status: ACTIVE
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.126880
Longitude: -78.766963

For data sources see[1][2][3]

Well History

Date Event
1960-01-01 NEWLY DRILLED
1960-07-25 Performed Spud Operation
1960-08-06 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1980 86,903.00 0 0.00 0 0.00 0
1981 77,760.00 0 0.00 0 0.00 0
1982 44,756.00 0 0.00 0 0.00 0
1983 13,704.00 0 0.00 0 0.00 0
1984 26,052.00 0 0.00 0 0.00 0
1985 25,819.00 0 0.00 0 0.00 0
1991 12469.00 275 0.00 0 0.00 0
2000 2901 120 0.00 0 0.00 0
2001 23522 365 0.00 0 0.00 0
2002 24175 365 0.00 0 0.00 0
2003 21543 365 0.00 0 0.00 0
2004 24224 365 0.00 0 0.00 0
2007 21677.00 365 0.00 0 0.00 0
2008 15197.00 365 0.00 0 0.00 0
2009 12035.00 365 0.00 0 0.00 0
2010 11,907.00 365 0.00 0 0.00 0
2011 9,347.00 365 0.00 0 0.00 0
2012 9,515.00 365 0.00 0 0.00 0
2013 4,703.00 365 0.00 0 0.00 0
2014 5,435.00 365 0.00 0 0.00 0
2015 6,805.00 365 0.00 0 0.00 0
2016 SUSQUEHANNA ENERGIES INC 9,398.00 365 0.00 0 0.00 0
2017 SUSQUEHANNA ENERGIES INC 9,829.00 365 0.00 0 0.00 0
2018 SUSQUEHANNA ENERGIES INC 7,894.00 365 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2792669 Primary Facility 2018-10-17 Routine/Complete Inspection No Violations Noted The weather is 54 Deg. F and sunny at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore & Ohio RR Pad, Well # 1 on October 17, 2018. There is 1 active and producing well on this pad. Line pressure - 58 psi. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2¿ X 8-5/8¿) is closed, (8-5/8" x 13-3/8") is open and vented, cannot verify for gas due to this vent being set deeper inside the cellar. Detected 10% LEL and 0% combustible gas inside the cellar, could not verify exact source of the gas leak. The area around the well is fenced and the gate is closed and locked. No violation noted at time of inspection, but discussed follow up inspection.

Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and company owner. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2887577 Primary Facility 2018-12-06 Follow-up Inspection No Violations Noted The weather is 38 Deg. F and cloudy at the time of inspection. Routine inspection of Susquehanna Energies Inc., Baltimore &Ohio RR Pad, Well # 1 on December 6, 2018. There is 1 active and producing well on this pad.. Production processing equipment includes - production water tank, separator, pressure regulator, heater; measurement equipment orifice meter station. Annulus vent (5-1/2 X 8-5/8) is closed, (8-5/8" x 13-3/8") is open and vented. 15% LEL and 0% at the annulus vent. Gas leak inside the cellar, that was detected during previous inspection, has been fixed. Observed bubbling at the low rate inside the cellar. No violation noted at time of inspection, but will continue attending wellsite and monitoring well cellar.

Susquehanna Energies Inc. Representative Steve Beercheck, Well Tender and Company Owner. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

For data sources see[6]

References