X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0244221206002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0244221206002
 
| Well ID: 0244221206002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.030353, -112.949579 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.030353, -112.949579 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-12-024-22W4/2
 
| Location: 00/06-12-024-22W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-12-024-22 W4/02
 
| Location Alias 2: 00/06-12-024-22 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 024
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 22
 +
|-
 +
| Section: 12
 
|-
 
|-
 
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
Line 17: Line 27:
 
| Well Name: PCP HUSSAR 6-12-24-22
 
| Well Name: PCP HUSSAR 6-12-24-22
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Ovintiv Canada ULC]]
 
|-
 
|-
 
| License Number: 0102837
 
| License Number: 0102837
Line 29: Line 39:
 
| Final Drill Date: 1983-09-01
 
| Final Drill Date: 1983-09-01
 
|-
 
|-
| Well Total Depth: 1491 m
+
| Well Total Depth: 1491.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 51.030353
 
| Surface Hole Latitude: 51.030353
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1983-08-24
 +
| Obtained License
 +
|-
 +
| 1983-09-01
 +
| Finished Drilling
 +
|-
 +
| 1983-09-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1983-09-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1983-09-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 1983-11-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1983-11-16
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1983-11-16
 +
| Plug Back Performed
 +
|-
 +
| 1983-11-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1983-11-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1983-11-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-02-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-02-03
 +
| Well Log Performed
 +
|-
 +
| 1984-02-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1988-11-30
 +
| Plug Back Performed
 +
|-
 +
| 1994-01-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1994-01-07
 +
| Plug Back Performed
 +
|-
 +
| 1994-01-07
 +
| Well Log Performed
 +
|-
 +
| 1994-01-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-01-12
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1994-08-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1994-08-27
 +
| Plug Back Performed
 +
|-
 +
| 1994-09-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-09-21
 +
| Well Log Performed
 +
|-
 +
| 1994-10-27
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1997-03-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1997-03-05
 +
| Plug Back Performed
 +
|-
 +
| 1997-07-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1997-07-09
 +
| Well Log Performed
 +
|-
 +
| 1997-07-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1997-07-12
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1997-07-19
 +
| Well Abandoned
 +
|-
 +
| 1997-07-19
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 198:
 
| 1983-11-11
 
| 1983-11-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1409
+
| style="text-align: right;" | 1409.00
| style="text-align: right;" | 1411.5
+
| style="text-align: right;" | 1411.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1983-11-16
 
| 1983-11-16
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1409
+
| style="text-align: right;" | 1409.00
| style="text-align: right;" | 1411.5
+
| style="text-align: right;" | 1411.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1983-11-19
 
| 1983-11-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1457.5
+
| style="text-align: right;" | 1457.50
| style="text-align: right;" | 1462.5
+
| style="text-align: right;" | 1462.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1983-11-20
 
| 1983-11-20
| Fracture  
+
| Fracture
| style="text-align: right;" | 1457.5
+
| style="text-align: right;" | 1457.50
| style="text-align: right;" | 1462.5
+
| style="text-align: right;" | 1462.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1983-11-30
 
| 1983-11-30
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1392
+
| style="text-align: right;" | 1392.00
| style="text-align: right;" | 1400
+
| style="text-align: right;" | 1400.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-02-03
 
| 1984-02-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 820.5
+
| style="text-align: right;" | 820.50
| style="text-align: right;" | 824
+
| style="text-align: right;" | 824.00
 
| style="text-align: right;" | 11
 
| style="text-align: right;" | 11
 
|-
 
|-
 
| 1984-02-07
 
| 1984-02-07
| Fracture  
+
| Fracture
| style="text-align: right;" | 820.5
+
| style="text-align: right;" | 820.50
| style="text-align: right;" | 824
+
| style="text-align: right;" | 824.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-01-07
 
| 1994-01-07
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 807
+
| style="text-align: right;" | 807.00
| style="text-align: right;" | 815
+
| style="text-align: right;" | 815.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-01-09
 
| 1994-01-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 645
+
| style="text-align: right;" | 645.00
| style="text-align: right;" | 651.5
+
| style="text-align: right;" | 651.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-01-12
 
| 1994-01-12
| Fracture  
+
| Fracture
| style="text-align: right;" | 645
+
| style="text-align: right;" | 645.00
| style="text-align: right;" | 651.5
+
| style="text-align: right;" | 651.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-08-27
 
| 1994-08-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 627
+
| style="text-align: right;" | 627.00
| style="text-align: right;" | 635
+
| style="text-align: right;" | 635.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-09-21
 
| 1994-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 411.5
+
| style="text-align: right;" | 411.50
| style="text-align: right;" | 419.5
+
| style="text-align: right;" | 419.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-09-21
 
| 1994-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 421
+
| style="text-align: right;" | 421.00
| style="text-align: right;" | 425.5
+
| style="text-align: right;" | 425.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-10-27
 
| 1994-10-27
| Fracture  
+
| Fracture
| style="text-align: right;" | 411
+
| style="text-align: right;" | 411.00
| style="text-align: right;" | 425.5
+
| style="text-align: right;" | 425.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-03-05
 
| 1997-03-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 392
+
| style="text-align: right;" | 392.00
| style="text-align: right;" | 400
+
| style="text-align: right;" | 400.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-07-09
 
| 1997-07-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 304
+
| style="text-align: right;" | 304.00
| style="text-align: right;" | 305
+
| style="text-align: right;" | 305.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1997-07-12
 
| 1997-07-12
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 304
+
| style="text-align: right;" | 304.00
| style="text-align: right;" | 305
+
| style="text-align: right;" | 305.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-07-12
 
| 1997-07-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 248
+
| style="text-align: right;" | 248.00
| style="text-align: right;" | 322
+
| style="text-align: right;" | 322.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 184: Line 308:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 19:40, 7 July 2020

Well Details

Well ID: 0244221206002
Loading map...
Location: 00/06-12-024-22W4/2
Location Alias: 00/06-12-24-22 W4M
Location Alias 2: 00/06-12-024-22 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 22
Section: 12
County/Municipality: Wheatland County
Well Name: PCP HUSSAR 6-12-24-22
Operator Name: Ovintiv Canada ULC
License Number: 0102837
License Date: 1983-08-24
License Status: RecCertified
Spud Date: 1983-08-27
Final Drill Date: 1983-09-01
Well Total Depth: 1491.00 m
Surface Hole Latitude: 51.030353
Surface Hole Longitude: -112.949579

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-24 Obtained License
1983-09-01 Finished Drilling
1983-09-03 Drill Stem Test Performed
1983-09-04 Drill Stem Test Performed
1983-09-04 Production Casing Operation Performed
1983-11-11 Perforation Treatment Performed - Jet Perforation
1983-11-16 Perforation Treatment Performed - Cement Squeeze
1983-11-16 Plug Back Performed
1983-11-19 Perforation Treatment Performed - Jet Perforation
1983-11-20 Perforation Treatment Performed - Fractured
1983-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-02-03 Perforation Treatment Performed - Jet Perforation
1984-02-03 Well Log Performed
1984-02-07 Perforation Treatment Performed - Fractured
1988-11-30 Plug Back Performed
1994-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-07 Plug Back Performed
1994-01-07 Well Log Performed
1994-01-09 Perforation Treatment Performed - Jet Perforation
1994-01-12 Perforation Treatment Performed - Fractured
1994-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-27 Plug Back Performed
1994-09-21 Perforation Treatment Performed - Jet Perforation
1994-09-21 Well Log Performed
1994-10-27 Perforation Treatment Performed - Fractured
1997-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-05 Plug Back Performed
1997-07-09 Perforation Treatment Performed - Jet Perforation
1997-07-09 Well Log Performed
1997-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-12 Perforation Treatment Performed - Remedial Casing
1997-07-19 Well Abandoned
1997-07-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-11 Perforation 1409.00 1411.50 13
1983-11-16 Cement Squeeze 1409.00 1411.50 0
1983-11-19 Perforation 1457.50 1462.50 13
1983-11-20 Fracture 1457.50 1462.50 0
1983-11-30 Packing Device Capped w/Cement 1392.00 1400.00 0
1984-02-03 Perforation 820.50 824.00 11
1984-02-07 Fracture 820.50 824.00 0
1994-01-07 Packing Device Capped w/Cement 807.00 815.00 0
1994-01-09 Perforation 645.00 651.50 13
1994-01-12 Fracture 645.00 651.50 0
1994-08-27 Packing Device Capped w/Cement 627.00 635.00 0
1994-09-21 Perforation 411.50 419.50 13
1994-09-21 Perforation 421.00 425.50 13
1994-10-27 Fracture 411.00 425.50 0
1997-03-05 Packing Device Capped w/Cement 392.00 400.00 0
1997-07-09 Perforation 304.00 305.00 14
1997-07-12 Remedial Casing Cementing 304.00 305.00 0
1997-07-12 Packing Device Capped w/Cement 248.00 322.00 0

For data sources see[4]



References