X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0905053205002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0905053205002
 
| Well ID: 0905053205002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 56.848992, -114.767385 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 56.848992, -114.767385 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/05-32-090-05W5/2
 
| Location: 00/05-32-090-05W5/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/05-32-090-05 W5/02
 
| Location Alias 2: 00/05-32-090-05 W5/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 090
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 05
 +
|-
 +
| Section: 32
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Opportunity No. 17,_Alberta|Municipal District of Opportunity No. 17]]
 
| County/Municipality: [[Municipal District of Opportunity No. 17,_Alberta|Municipal District of Opportunity No. 17]]
Line 17: Line 27:
 
| Well Name: PRED KIDNEY 5-32-90-5
 
| Well Name: PRED KIDNEY 5-32-90-5
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Highwood Oil Company Ltd.]]
 
|-
 
|-
 
| License Number: 0146284
 
| License Number: 0146284
Line 29: Line 39:
 
| Final Drill Date: 1990-12-02
 
| Final Drill Date: 1990-12-02
 
|-
 
|-
| Well Total Depth: 1523 m
+
| Well Total Depth: 1523.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 56.848992
 
| Surface Hole Latitude: 56.848992
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1990-11-13
 +
| Obtained License
 +
|-
 +
| 1990-11-21
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1990-11-25
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 1990-12-01
 +
| Lost Circulation Occurred
 +
|-
 +
| 1990-12-02
 +
| Finished Drilling
 +
|-
 +
| 1990-12-02
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1990-12-03
 +
| Well Log Performed
 +
|-
 +
| 1990-12-04
 +
| Well Log Performed
 +
|-
 +
| 1990-12-05
 +
| Production Casing Operation Performed
 +
|-
 +
| 1990-12-05
 +
| Rig Released
 +
|-
 +
| 1991-01-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1991-01-12
 +
| Well Log Performed
 +
|-
 +
| 1991-01-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1991-01-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1991-01-15
 +
| Plug Back Performed
 +
|-
 +
| 1991-01-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1991-01-16
 +
| Well Log Performed
 +
|-
 +
| 1991-01-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-05-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-05-28
 +
| Perforation Treatment Performed - Casing Patch (Over Perfs)
 +
|-
 +
| 1996-05-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-05-28
 +
| Well Log Performed
 +
|-
 +
| 1996-05-29
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-05-30
 +
| Well Log Performed
 +
|-
 +
| 1996-05-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-05-31
 +
| Well Log Performed
 +
|-
 +
| 1996-06-25
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-06-28
 +
| Well Began Production
 +
|-
 +
| 1996-06-28
 +
| Well Fluid changed to Water
 +
|-
 +
| 1996-06-28
 +
| Well Type changed to Source
 +
|-
 +
| 1997-04-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1997-05-28
 +
| Well Log Performed
 +
|-
 +
| 1997-05-31
 +
| Well Log Performed
 +
|-
 +
| 1998-03-02
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2008-10-31
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2008-11-04
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-11-04
 +
| Plug Back Performed
 +
|-
 +
| 2008-11-04
 +
| Well Fluid changed to Water
 +
|-
 +
| 2008-11-04
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2008-11-04
 +
| Well Type changed to Source
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 216:
 
| 1991-01-12
 
| 1991-01-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1492
+
| style="text-align: right;" | 1492.00
| style="text-align: right;" | 1494
+
| style="text-align: right;" | 1494.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1991-01-13
 
| 1991-01-13
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1492
+
| style="text-align: right;" | 1492.00
| style="text-align: right;" | 1494
+
| style="text-align: right;" | 1494.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991-01-15
 
| 1991-01-15
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1481
+
| style="text-align: right;" | 1481.00
| style="text-align: right;" | 1489
+
| style="text-align: right;" | 1489.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1991-01-16
 
| 1991-01-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1471.5
+
| style="text-align: right;" | 1471.50
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1991-01-17
 
| 1991-01-17
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1471.5
+
| style="text-align: right;" | 1471.50
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996-05-26
 
| 1996-05-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1492
+
| style="text-align: right;" | 1492.00
| style="text-align: right;" | 1494
+
| style="text-align: right;" | 1494.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1996-05-28
 
| 1996-05-28
| Casing Patch  
+
| Casing Patch
| style="text-align: right;" | 1471.5
+
| style="text-align: right;" | 1471.50
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996-05-28
 
| 1996-05-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1483.5
+
| style="text-align: right;" | 1483.50
| style="text-align: right;" | 1488.5
+
| style="text-align: right;" | 1488.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1996-05-29
 
| 1996-05-29
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1483.5
+
| style="text-align: right;" | 1483.50
| style="text-align: right;" | 1488.5
+
| style="text-align: right;" | 1488.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996-05-31
 
| 1996-05-31
 
| Perforation
 
| Perforation
| style="text-align: right;" | 607
+
| style="text-align: right;" | 607.00
| style="text-align: right;" | 612
+
| style="text-align: right;" | 612.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1996-06-25
 
| 1996-06-25
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 607
+
| style="text-align: right;" | 607.00
| style="text-align: right;" | 612
+
| style="text-align: right;" | 612.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-04-09
 
| 1997-04-09
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1483.5
+
| style="text-align: right;" | 1483.50
| style="text-align: right;" | 1488.5
+
| style="text-align: right;" | 1488.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-03-02
 
| 1998-03-02
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 607
+
| style="text-align: right;" | 607.00
| style="text-align: right;" | 612
+
| style="text-align: right;" | 612.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-10-31
 
| 2008-10-31
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 880
+
| style="text-align: right;" | 880.00
| style="text-align: right;" | 1019
+
| style="text-align: right;" | 1019.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-11-04
 
| 2008-11-04
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 540
+
| style="text-align: right;" | 540.00
| style="text-align: right;" | 555
+
| style="text-align: right;" | 555.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 166: Line 308:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 201: Line 357:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 72018.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1997
 
| 1997
Line 207: Line 363:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 148897.1
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1998
 
| 1998
Line 213: Line 369:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 131104.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1999
 
| 1999
Line 219: Line 375:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 137267.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2000
 
| 2000
Line 225: Line 381:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 123586.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2001
 
| 2001
Line 231: Line 387:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 80254.5
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2002
 
| 2002
Line 237: Line 393:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 47729.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 243: Line 399:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 262: Line 418:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 16:24, 8 July 2020

Well Details

Well ID: 0905053205002
Loading map...
Location: 00/05-32-090-05W5/2
Location Alias: 00/05-32-90-05 W5M
Location Alias 2: 00/05-32-090-05 W5/02
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 05
Section: 32
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 5-32-90-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0146284
License Date: 1990-11-13
License Status: Suspension
Spud Date: 1990-11-18
Final Drill Date: 1990-12-02
Well Total Depth: 1523.00 m
Surface Hole Latitude: 56.848992
Surface Hole Longitude: -114.767385

For data sources see[1][2]

Well History

Date Event
1990-11-13 Obtained License
1990-11-21 Surface Casing Operation Performed
1990-11-25 Intermediate Casing Operation Performed
1990-12-01 Lost Circulation Occurred
1990-12-02 Finished Drilling
1990-12-02 Well Mode changed to Drilled and Cased
1990-12-03 Well Log Performed
1990-12-04 Well Log Performed
1990-12-05 Production Casing Operation Performed
1990-12-05 Rig Released
1991-01-12 Perforation Treatment Performed - Jet Perforation
1991-01-12 Well Log Performed
1991-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-15 Plug Back Performed
1991-01-16 Perforation Treatment Performed - Jet Perforation
1991-01-16 Well Log Performed
1991-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-26 Perforation Treatment Performed - Jet Perforation
1996-05-28 Perforation Treatment Performed - Casing Patch (Over Perfs)
1996-05-28 Perforation Treatment Performed - Jet Perforation
1996-05-28 Well Log Performed
1996-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-30 Well Log Performed
1996-05-31 Perforation Treatment Performed - Jet Perforation
1996-05-31 Well Log Performed
1996-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-28 Well Began Production
1996-06-28 Well Fluid changed to Water
1996-06-28 Well Type changed to Source
1997-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-28 Well Log Performed
1997-05-31 Well Log Performed
1998-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-10-31 Perforation Treatment Performed - Cement Plug
2008-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-04 Plug Back Performed
2008-11-04 Well Fluid changed to Water
2008-11-04 Well Mode changed to Abandoned Zone
2008-11-04 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-12 Perforation 1492.00 1494.00 13
1991-01-13 Acid Treatment 1492.00 1494.00 0
1991-01-15 Packing Device Capped w/Cement 1481.00 1489.00 0
1991-01-16 Perforation 1471.50 1474.00 13
1991-01-17 Acid Treatment 1471.50 1474.00 0
1996-05-26 Perforation 1492.00 1494.00 13
1996-05-28 Casing Patch 1471.50 1474.00 0
1996-05-28 Perforation 1483.50 1488.50 13
1996-05-29 Acid Treatment 1483.50 1488.50 0
1996-05-31 Perforation 607.00 612.00 13
1996-06-25 Acid Treatment 607.00 612.00 0
1997-04-09 Acid Treatment 1483.50 1488.50 0
1998-03-02 Acid Treatment 607.00 612.00 0
2008-10-31 Cement Plug 880.00 1019.00 0
2008-11-04 Packing Device Capped w/Cement 540.00 555.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-12-01 Lost Circulation 1478.00 1478.00

For data sources see[6]

References