X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0094160601002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0094160601002
 
| Well ID: 0094160601002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.701456, -112.154758 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.701456, -112.154758 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/01-06-009-16W4/2
 
| Location: 00/01-06-009-16W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/01-06-009-16 W4/02
 
| Location Alias 2: 00/01-06-009-16 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 009
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 16
 +
|-
 +
| Section: 06
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Taber,_Alberta|Municipal District of Taber]]
 
| County/Municipality: [[Municipal District of Taber,_Alberta|Municipal District of Taber]]
Line 17: Line 27:
 
| Well Name: CNRL HORSEFLY 1-6-9-16
 
| Well Name: CNRL HORSEFLY 1-6-9-16
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Canadian Natural Resources Limited]]
 
|-
 
|-
 
| License Number: 0189987
 
| License Number: 0189987
Line 29: Line 39:
 
| Final Drill Date: 1996-07-31
 
| Final Drill Date: 1996-07-31
 
|-
 
|-
| Well Total Depth: 1005 m
+
| Well Total Depth: 1005.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 49.701456
 
| Surface Hole Latitude: 49.701456
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1996-07-26
 +
| Obtained License
 +
|-
 +
| 1996-07-30
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1996-07-31
 +
| Finished Drilling
 +
|-
 +
| 1996-07-31
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1996-08-01
 +
| Well Log Performed
 +
|-
 +
| 1996-08-02
 +
| Production Casing Operation Performed
 +
|-
 +
| 1996-08-02
 +
| Rig Released
 +
|-
 +
| 1996-08-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-08-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1999-09-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-09-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-09-27
 +
| Plug Back Performed
 +
|-
 +
| 1999-09-27
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1999-10-09
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 138:
 
| 1996-08-06
 
| 1996-08-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 950
+
| style="text-align: right;" | 950.00
| style="text-align: right;" | 954
+
| style="text-align: right;" | 954.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1996-08-07
 
| 1996-08-07
| Fracture  
+
| Fracture
| style="text-align: right;" | 950
+
| style="text-align: right;" | 950.00
| style="text-align: right;" | 954
+
| style="text-align: right;" | 954.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-09-27
 
| 1999-09-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 937
+
| style="text-align: right;" | 937.00
| style="text-align: right;" | 945
+
| style="text-align: right;" | 945.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-09-27
 
| 1999-09-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 581
+
| style="text-align: right;" | 581.00
| style="text-align: right;" | 582.5
+
| style="text-align: right;" | 582.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1999-10-09
 
| 1999-10-09
| Fracture  
+
| Fracture
| style="text-align: right;" | 581
+
| style="text-align: right;" | 581.00
| style="text-align: right;" | 582.5
+
| style="text-align: right;" | 582.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 106: Line 170:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 19:56, 8 July 2020

Well Details

Well ID: 0094160601002
Loading map...
Location: 00/01-06-009-16W4/2
Location Alias: 00/01-06-09-16 W4M
Location Alias 2: 00/01-06-009-16 W4/02
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 06
County/Municipality: Municipal District of Taber
Well Name: CNRL HORSEFLY 1-6-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0189987
License Date: 1996-07-26
License Status: Suspension
Spud Date: 1996-07-30
Final Drill Date: 1996-07-31
Well Total Depth: 1005.00 m
Surface Hole Latitude: 49.701456
Surface Hole Longitude: -112.154758

For data sources see[1][2]

Well History

Date Event
1996-07-26 Obtained License
1996-07-30 Surface Casing Operation Performed
1996-07-31 Finished Drilling
1996-07-31 Well Mode changed to Drilled and Cased
1996-08-01 Well Log Performed
1996-08-02 Production Casing Operation Performed
1996-08-02 Rig Released
1996-08-06 Perforation Treatment Performed - Jet Perforation
1996-08-07 Perforation Treatment Performed - Fractured
1999-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-27 Perforation Treatment Performed - Jet Perforation
1999-09-27 Plug Back Performed
1999-09-27 Well Mode changed to Drilled and Cased
1999-10-09 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-06 Perforation 950.00 954.00 13
1996-08-07 Fracture 950.00 954.00 0
1999-09-27 Packing Device Capped w/Cement 937.00 945.00 0
1999-09-27 Perforation 581.00 582.50 13
1999-10-09 Fracture 581.00 582.50 0

For data sources see[4]



References