X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0635133202000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0635133202000
 
| Well ID: 0635133202000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.48835, -115.9262 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.488350, -115.9262 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/02-32-063-13W5/0
 
| Location: 00/02-32-063-13W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/02-32-063-13 W5/00
 
| Location Alias 2: 00/02-32-063-13 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 063
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 13
 +
|-
 +
| Section: 32
 
|-
 
|-
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
Line 17: Line 27:
 
| Well Name: ACL HOPE CREEK 2-32-63-13
 
| Well Name: ACL HOPE CREEK 2-32-63-13
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Paramount Resources Ltd.]]
 
|-
 
|-
 
| License Number: 0021714
 
| License Number: 0021714
Line 29: Line 39:
 
| Final Drill Date: 1961-12-30
 
| Final Drill Date: 1961-12-30
 
|-
 
|-
| Well Total Depth: 2993.1 m
+
| Well Total Depth: 2993.10 m
 
|-
 
|-
| Surface Hole Latitude: 54.48835
+
| Surface Hole Latitude: 54.488350
 
|-
 
|-
 
| Surface Hole Longitude: -115.9262
 
| Surface Hole Longitude: -115.9262
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1961-11-20
 +
| Obtained License
 +
|-
 +
| 1961-11-27
 +
| Lost Circulation Occurred
 +
|-
 +
| 1961-12-30
 +
| Finished Drilling
 +
|-
 +
| 1961-12-30
 +
| Well Log Performed
 +
|-
 +
| 1961-12-31
 +
| Well Log Performed
 +
|-
 +
| 1962-01-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1962-01-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1962-01-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1962-01-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1962-01-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1962-01-10
 +
| Production Casing Operation Performed
 +
|-
 +
| 1962-01-11
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1962-01-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-01-14
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1962-01-15
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-01-17
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-01-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-01-20
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1962-01-26
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-01-27
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1962-01-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-01-30
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-01-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1962-08-22
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1963-02-18
 +
| Well Began Production
 +
|-
 +
| 1963-02-18
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1963-02-18
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1976-03-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1976-03-11
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1976-03-11
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1976-03-11
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1976-03-13
 +
| Well Log Performed
 +
|-
 +
| 1976-03-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1976-03-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-11-13
 +
| Well Log Performed
 +
|-
 +
| 1999-10-16
 +
| Well Log Performed
 +
|-
 +
| 2003-11-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 73: Line 209:
 
|-
 
|-
 
| 1962-01-11
 
| 1962-01-11
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-13
 
| 1962-01-13
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-14
 
| 1962-01-14
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2859.6
+
| style="text-align: right;" | 2859.60
| style="text-align: right;" | 2860.2
+
| style="text-align: right;" | 2860.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-15
 
| 1962-01-15
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
| style="text-align: right;" | 2860.2
+
| style="text-align: right;" | 2860.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-17
 
| 1962-01-17
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
| style="text-align: right;" | 2860.2
+
| style="text-align: right;" | 2860.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-20
 
| 1962-01-20
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
| style="text-align: right;" | 2859.6
+
| style="text-align: right;" | 2859.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-20
 
| 1962-01-20
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2859.9
+
| style="text-align: right;" | 2859.90
| style="text-align: right;" | 2860.2
+
| style="text-align: right;" | 2860.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-20
 
| 1962-01-20
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
| style="text-align: right;" | 2860.2
+
| style="text-align: right;" | 2860.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-26
 
| 1962-01-26
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2859.3
+
| style="text-align: right;" | 2859.30
| style="text-align: right;" | 2860.2
+
| style="text-align: right;" | 2860.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-27
 
| 1962-01-27
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2829.2
+
| style="text-align: right;" | 2829.20
| style="text-align: right;" | 2835.6
+
| style="text-align: right;" | 2835.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-27
 
| 1962-01-27
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2846.5
+
| style="text-align: right;" | 2846.50
| style="text-align: right;" | 2846.5
+
| style="text-align: right;" | 2846.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-28
 
| 1962-01-28
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2829.2
+
| style="text-align: right;" | 2829.20
| style="text-align: right;" | 2846.5
+
| style="text-align: right;" | 2846.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-01-30
 
| 1962-01-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2840.1
+
| style="text-align: right;" | 2840.10
| style="text-align: right;" | 2841.3
+
| style="text-align: right;" | 2841.30
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1962-01-30
 
| 1962-01-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2845
+
| style="text-align: right;" | 2845.00
| style="text-align: right;" | 2847.7
+
| style="text-align: right;" | 2847.70
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1962-01-30
 
| 1962-01-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2828.2
+
| style="text-align: right;" | 2828.20
| style="text-align: right;" | 2830.7
+
| style="text-align: right;" | 2830.70
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1962-01-30
 
| 1962-01-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2834.6
+
| style="text-align: right;" | 2834.60
| style="text-align: right;" | 2836.5
+
| style="text-align: right;" | 2836.50
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1962-01-30
 
| 1962-01-30
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2828.2
+
| style="text-align: right;" | 2828.20
| style="text-align: right;" | 2847.7
+
| style="text-align: right;" | 2847.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1976-03-08
 
| 1976-03-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2828.2
+
| style="text-align: right;" | 2828.20
| style="text-align: right;" | 2847.7
+
| style="text-align: right;" | 2847.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1976-03-11
 
| 1976-03-11
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 2780.7
+
| style="text-align: right;" | 2780.70
| style="text-align: right;" | 2896.2
+
| style="text-align: right;" | 2896.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1976-03-17
 
| 1976-03-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1884.3
+
| style="text-align: right;" | 1884.30
| style="text-align: right;" | 1891
+
| style="text-align: right;" | 1891.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1976-03-19
 
| 1976-03-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1884.3
+
| style="text-align: right;" | 1884.30
| style="text-align: right;" | 1891
+
| style="text-align: right;" | 1891.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003-11-17
 
| 2003-11-17
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1884.3
+
| style="text-align: right;" | 1884.30
| style="text-align: right;" | 1891
+
| style="text-align: right;" | 1891.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 208: Line 344:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 241: Line 391:
 
| 1963
 
| 1963
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 96.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 14.8
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1964
 
| 1964
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 57.1
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 253: Line 403:
 
| 1965
 
| 1965
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 86.3
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 259: Line 409:
 
| 1966
 
| 1966
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 62.0
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 265: Line 415:
 
| 1967
 
| 1967
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 20.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 271: Line 421:
 
| 1968
 
| 1968
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 6.7
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 279: Line 429:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 303: Line 453:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 22:02, 8 July 2020

Well Details

Well ID: 0635133202000
Loading map...
Location: 00/02-32-063-13W5/0
Location Alias: 00/02-32-63-13 W5M
Location Alias 2: 00/02-32-063-13 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 13
Section: 32
County/Municipality: Woodlands County
Well Name: ACL HOPE CREEK 2-32-63-13
Operator Name: Paramount Resources Ltd.
License Number: 0021714
License Date: 1961-11-20
License Status: Suspension
Spud Date: 1961-11-24
Final Drill Date: 1961-12-30
Well Total Depth: 2993.10 m
Surface Hole Latitude: 54.488350
Surface Hole Longitude: -115.9262

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-11-20 Obtained License
1961-11-27 Lost Circulation Occurred
1961-12-30 Finished Drilling
1961-12-30 Well Log Performed
1961-12-31 Well Log Performed
1962-01-02 Drill Stem Test Performed
1962-01-03 Drill Stem Test Performed
1962-01-04 Drill Stem Test Performed
1962-01-06 Drill Stem Test Performed
1962-01-07 Drill Stem Test Performed
1962-01-10 Production Casing Operation Performed
1962-01-11 Perforation Treatment Performed - Selective Jet Perforations
1962-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-14 Perforation Treatment Performed - Selective Jet Perforations
1962-01-15 Perforation Treatment Performed - Cement Squeeze
1962-01-17 Perforation Treatment Performed - Cement Squeeze
1962-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-20 Perforation Treatment Performed - Selective Jet Perforations
1962-01-26 Perforation Treatment Performed - Cement Squeeze
1962-01-27 Perforation Treatment Performed - Selective Jet Perforations
1962-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-30 Perforation Treatment Performed - Jet Perforation
1962-08-22 Well Mode changed to Drilled and Cased
1963-02-18 Well Began Production
1963-02-18 Well Fluid changed to Crude Oil
1963-02-18 Well Mode changed to Pumping
1976-03-08 Perforation Treatment Performed - Jet Perforation
1976-03-11 Perforation Treatment Performed - Cement Plug
1976-03-11 Well Fluid changed to Crude Oil
1976-03-11 Well Mode changed to Abandoned Zone
1976-03-13 Well Log Performed
1976-03-17 Perforation Treatment Performed - Jet Perforation
1976-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-13 Well Log Performed
1999-10-16 Well Log Performed
2003-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-11 Selective Jet Perforations 2859.30 2859.30 0
1962-01-13 Acid Treatment 2859.30 2859.30 0
1962-01-14 Selective Jet Perforations 2859.60 2860.20 0
1962-01-15 Cement Squeeze 2859.30 2860.20 0
1962-01-17 Cement Squeeze 2859.30 2860.20 0
1962-01-20 Selective Jet Perforations 2859.30 2859.60 0
1962-01-20 Selective Jet Perforations 2859.90 2860.20 0
1962-01-20 Acid Treatment 2859.30 2860.20 0
1962-01-26 Cement Squeeze 2859.30 2860.20 0
1962-01-27 Selective Jet Perforations 2829.20 2835.60 0
1962-01-27 Selective Jet Perforations 2846.50 2846.50 0
1962-01-28 Acid Treatment 2829.20 2846.50 0
1962-01-30 Perforation 2840.10 2841.30 7
1962-01-30 Perforation 2845.00 2847.70 7
1962-01-30 Perforation 2828.20 2830.70 7
1962-01-30 Perforation 2834.60 2836.50 7
1962-01-30 Acid Treatment 2828.20 2847.70 0
1976-03-08 Perforation 2828.20 2847.70 0
1976-03-11 Cement Plug 2780.70 2896.20 0
1976-03-17 Perforation 1884.30 1891.00 7
1976-03-19 Acid Treatment 1884.30 1891.00 0
2003-11-17 Acid Treatment 1884.30 1891.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-11-27 Lost Circulation 48.70 173.70
1961-11-27 Lost Circulation 314.50 314.50

For data sources see[6]

References