X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0114201612000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0114201612000
 
| Well ID: 0114201612000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.910238, -112.687759 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.910238, -112.687759 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/12-16-011-20W4/0
 
| Location: 00/12-16-011-20W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/12-16-011-20 W4/00
 
| Location Alias 2: 00/12-16-011-20 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 011
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 16
 
|-
 
|-
 
| County/Municipality: [[Lethbridge County,_Alberta|Lethbridge County]]
 
| County/Municipality: [[Lethbridge County,_Alberta|Lethbridge County]]
Line 17: Line 27:
 
| Well Name: SLE IRONSP 12-16-11-20
 
| Well Name: SLE IRONSP 12-16-11-20
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[SanLing Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0181469
 
| License Number: 0181469
Line 29: Line 39:
 
| Final Drill Date: 1995-10-31
 
| Final Drill Date: 1995-10-31
 
|-
 
|-
| Well Total Depth: 1701 m
+
| Well Total Depth: 1701.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 49.910238
 
| Surface Hole Latitude: 49.910238
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1995-10-17
 +
| Obtained License
 +
|-
 +
| 1995-10-21
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1995-10-31
 +
| Finished Drilling
 +
|-
 +
| 1995-10-31
 +
| Well Log Performed
 +
|-
 +
| 1995-11-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1995-11-01
 +
| Well Log Performed
 +
|-
 +
| 1995-11-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1995-11-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 1995-11-04
 +
| Rig Released
 +
|-
 +
| 1995-11-04
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1995-11-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-11-08
 +
| Well Log Performed
 +
|-
 +
| 1995-11-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1995-11-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1995-11-12
 +
| Plug Back Performed
 +
|-
 +
| 1995-11-12
 +
| Well Log Performed
 +
|-
 +
| 1995-11-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-11-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1995-11-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1995-11-16
 +
| Plug Back Performed
 +
|-
 +
| 1995-11-16
 +
| Well Log Performed
 +
|-
 +
| 1995-11-17
 +
| Well Log Performed
 +
|-
 +
| 1995-11-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-11-22
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-05-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-05-29
 +
| Plug Back Performed
 +
|-
 +
| 2002-05-29
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2002-05-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-05-31
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2002-05-31
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2002-06-05
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2002-06-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-06-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2002-06-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-06-07
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2002-08-08
 +
| Well Abandoned
 +
|-
 +
| 2002-08-08
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 207:
 
| 1995-11-08
 
| 1995-11-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1638.5
+
| style="text-align: right;" | 1638.50
| style="text-align: right;" | 1643.5
+
| style="text-align: right;" | 1643.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1995-11-10
 
| 1995-11-10
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1638.5
+
| style="text-align: right;" | 1638.50
| style="text-align: right;" | 1643.5
+
| style="text-align: right;" | 1643.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995-11-12
 
| 1995-11-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1622
+
| style="text-align: right;" | 1622.00
| style="text-align: right;" | 1630
+
| style="text-align: right;" | 1630.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995-11-13
 
| 1995-11-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1192
+
| style="text-align: right;" | 1192.00
| style="text-align: right;" | 1203
+
| style="text-align: right;" | 1203.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1995-11-13
 
| 1995-11-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1192
+
| style="text-align: right;" | 1192.00
| style="text-align: right;" | 1203
+
| style="text-align: right;" | 1203.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1995-11-14
 
| 1995-11-14
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1192
+
| style="text-align: right;" | 1192.00
| style="text-align: right;" | 1203
+
| style="text-align: right;" | 1203.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995-11-16
 
| 1995-11-16
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1167
+
| style="text-align: right;" | 1167.00
| style="text-align: right;" | 1175
+
| style="text-align: right;" | 1175.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995-11-18
 
| 1995-11-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 867
+
| style="text-align: right;" | 867.00
| style="text-align: right;" | 868
+
| style="text-align: right;" | 868.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1995-11-22
 
| 1995-11-22
| Fracture  
+
| Fracture
| style="text-align: right;" | 867
+
| style="text-align: right;" | 867.00
| style="text-align: right;" | 868
+
| style="text-align: right;" | 868.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-05-29
 
| 2002-05-29
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 847
+
| style="text-align: right;" | 847.00
| style="text-align: right;" | 855
+
| style="text-align: right;" | 855.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-05-30
 
| 2002-05-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 339.7
+
| style="text-align: right;" | 339.70
| style="text-align: right;" | 340.7
+
| style="text-align: right;" | 340.70
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2002-05-31
 
| 2002-05-31
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 339.7
+
| style="text-align: right;" | 339.70
| style="text-align: right;" | 340.7
+
| style="text-align: right;" | 340.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-05-31
 
| 2002-05-31
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 339.7
+
| style="text-align: right;" | 339.70
| style="text-align: right;" | 340.7
+
| style="text-align: right;" | 340.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-06-05
 
| 2002-06-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 321
+
| style="text-align: right;" | 321.00
| style="text-align: right;" | 322
+
| style="text-align: right;" | 322.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2002-06-05
 
| 2002-06-05
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 321
+
| style="text-align: right;" | 321.00
| style="text-align: right;" | 322
+
| style="text-align: right;" | 322.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-06-07
 
| 2002-06-07
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 321
+
| style="text-align: right;" | 321.00
| style="text-align: right;" | 322
+
| style="text-align: right;" | 322.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-06-07
 
| 2002-06-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 315.8
+
| style="text-align: right;" | 315.80
| style="text-align: right;" | 316.8
+
| style="text-align: right;" | 316.80
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2002-06-07
 
| 2002-06-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 315.8
+
| style="text-align: right;" | 315.80
| style="text-align: right;" | 316.8
+
| style="text-align: right;" | 316.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-06-07
 
| 2002-06-07
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 315.8
+
| style="text-align: right;" | 315.80
| style="text-align: right;" | 316.8
+
| style="text-align: right;" | 316.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 190: Line 323:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 11:24, 9 July 2020

Well Details

Well ID: 0114201612000
Loading map...
Location: 00/12-16-011-20W4/0
Location Alias: 00/12-16-11-20 W4M
Location Alias 2: 00/12-16-011-20 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 20
Section: 16
County/Municipality: Lethbridge County
Well Name: SLE IRONSP 12-16-11-20
Operator Name: SanLing Energy Ltd.
License Number: 0181469
License Date: 1995-10-17
License Status: Abandoned
Spud Date: 1995-10-20
Final Drill Date: 1995-10-31
Well Total Depth: 1701.00 m
Surface Hole Latitude: 49.910238
Surface Hole Longitude: -112.687759

For data sources see[1][2]

Well History

Date Event
1995-10-17 Obtained License
1995-10-21 Surface Casing Operation Performed
1995-10-31 Finished Drilling
1995-10-31 Well Log Performed
1995-11-01 Drill Stem Test Performed
1995-11-01 Well Log Performed
1995-11-02 Drill Stem Test Performed
1995-11-04 Production Casing Operation Performed
1995-11-04 Rig Released
1995-11-04 Well Mode changed to Drilled and Cased
1995-11-08 Perforation Treatment Performed - Jet Perforation
1995-11-08 Well Log Performed
1995-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-12 Plug Back Performed
1995-11-12 Well Log Performed
1995-11-13 Perforation Treatment Performed - Jet Perforation
1995-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-16 Plug Back Performed
1995-11-16 Well Log Performed
1995-11-17 Well Log Performed
1995-11-18 Perforation Treatment Performed - Jet Perforation
1995-11-22 Perforation Treatment Performed - Fractured
2002-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-29 Plug Back Performed
2002-05-29 Well Mode changed to Abandoned Zone
2002-05-30 Perforation Treatment Performed - Jet Perforation
2002-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-31 Perforation Treatment Performed - Remedial Casing
2002-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-05 Perforation Treatment Performed - Jet Perforation
2002-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-07 Perforation Treatment Performed - Jet Perforation
2002-06-07 Perforation Treatment Performed - Remedial Casing
2002-08-08 Well Abandoned
2002-08-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-08 Perforation 1638.50 1643.50 13
1995-11-10 Acid Treatment 1638.50 1643.50 0
1995-11-12 Packing Device Capped w/Cement 1622.00 1630.00 0
1995-11-13 Perforation 1192.00 1203.00 13
1995-11-13 Perforation 1192.00 1203.00 13
1995-11-14 Acid Treatment 1192.00 1203.00 0
1995-11-16 Packing Device Capped w/Cement 1167.00 1175.00 0
1995-11-18 Perforation 867.00 868.00 13
1995-11-22 Fracture 867.00 868.00 0
2002-05-29 Packing Device Capped w/Cement 847.00 855.00 0
2002-05-30 Perforation 339.70 340.70 14
2002-05-31 Acid Treatment 339.70 340.70 0
2002-05-31 Remedial Casing Cementing 339.70 340.70 0
2002-06-05 Perforation 321.00 322.00 14
2002-06-05 Acid Treatment 321.00 322.00 0
2002-06-07 Remedial Casing Cementing 321.00 322.00 0
2002-06-07 Perforation 315.80 316.80 14
2002-06-07 Acid Treatment 315.80 316.80 0
2002-06-07 Remedial Casing Cementing 315.80 316.80 0

For data sources see[4]



References