X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0594170411000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0594170411000
 
| Well ID: 0594170411000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.074672, -112.489052 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.074672, -112.489052 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/11-04-059-17W4/0
 
| Location: 00/11-04-059-17W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/11-04-059-17 W4/00
 
| Location Alias 2: 00/11-04-059-17 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 059
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 17
 +
|-
 +
| Section: 04
 
|-
 
|-
 
| County/Municipality: [[Smoky Lake County,_Alberta|Smoky Lake County]]
 
| County/Municipality: [[Smoky Lake County,_Alberta|Smoky Lake County]]
Line 17: Line 27:
 
| Well Name: PCP BELLIS 11-4-59-17
 
| Well Name: PCP BELLIS 11-4-59-17
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Ovintiv Canada ULC]]
 
|-
 
|-
 
| License Number: 0053380
 
| License Number: 0053380
Line 29: Line 39:
 
| Final Drill Date: 1975-03-28
 
| Final Drill Date: 1975-03-28
 
|-
 
|-
| Well Total Depth: 702.6 m
+
| Well Total Depth: 702.60 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.074672
 
| Surface Hole Latitude: 54.074672
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1975-03-21
 +
| Obtained License
 +
|-
 +
| 1975-03-28
 +
| Finished Drilling
 +
|-
 +
| 1975-03-29
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-03-30
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-03-31
 +
| Production Casing Operation Performed
 +
|-
 +
| 1975-04-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-04-06
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1975-04-07
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1975-04-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-04-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1975-08-01
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1976-05-11
 +
| Well Began Production
 +
|-
 +
| 1976-05-11
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1976-05-11
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1979-01-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1979-01-05
 +
| Well Abandoned
 +
|-
 +
| 1979-01-05
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1979-01-05
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 153:
 
| 1975-04-05
 
| 1975-04-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 666.9
+
| style="text-align: right;" | 666.90
| style="text-align: right;" | 668.1
+
| style="text-align: right;" | 668.10
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1975-04-06
 
| 1975-04-06
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 666.9
+
| style="text-align: right;" | 666.90
| style="text-align: right;" | 668.1
+
| style="text-align: right;" | 668.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1975-04-07
 
| 1975-04-07
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 666.9
+
| style="text-align: right;" | 666.90
| style="text-align: right;" | 668.1
+
| style="text-align: right;" | 668.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1975-04-08
 
| 1975-04-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 661.4
+
| style="text-align: right;" | 661.40
| style="text-align: right;" | 662.6
+
| style="text-align: right;" | 662.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1975-04-10
 
| 1975-04-10
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 661.4
+
| style="text-align: right;" | 661.40
| style="text-align: right;" | 662.6
+
| style="text-align: right;" | 662.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-01-05
 
| 1979-01-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 658
+
| style="text-align: right;" | 658.00
| style="text-align: right;" | 658
+
| style="text-align: right;" | 658.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 112: Line 191:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 145: Line 238:
 
| 1976
 
| 1976
 
| style="text-align: right;" | 2181
 
| style="text-align: right;" | 2181
| style="text-align: right;" | 765.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.6
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 153: Line 246:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 05:02, 12 July 2020

Well Details

Well ID: 0594170411000
Loading map...
Location: 00/11-04-059-17W4/0
Location Alias: 00/11-04-59-17 W4M
Location Alias 2: 00/11-04-059-17 W4/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 17
Section: 04
County/Municipality: Smoky Lake County
Well Name: PCP BELLIS 11-4-59-17
Operator Name: Ovintiv Canada ULC
License Number: 0053380
License Date: 1975-03-21
License Status: RecCertified
Spud Date: 1975-03-23
Final Drill Date: 1975-03-28
Well Total Depth: 702.60 m
Surface Hole Latitude: 54.074672
Surface Hole Longitude: -112.489052

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-21 Obtained License
1975-03-28 Finished Drilling
1975-03-29 Drill Stem Test Performed
1975-03-30 Drill Stem Test Performed
1975-03-31 Production Casing Operation Performed
1975-04-05 Perforation Treatment Performed - Jet Perforation
1975-04-06 Perforation Treatment Performed - Acid Wash - No Pressure
1975-04-07 Perforation Treatment Performed - Cement Squeeze
1975-04-08 Perforation Treatment Performed - Jet Perforation
1975-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-01 Well Mode changed to Drilled and Cased
1976-05-11 Well Began Production
1976-05-11 Well Fluid changed to Gas
1976-05-11 Well Mode changed to Flowing
1979-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-01-05 Well Abandoned
1979-01-05 Well Fluid changed to Gas
1979-01-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-04-05 Perforation 666.90 668.10 7
1975-04-06 Acid Wash 666.90 668.10 0
1975-04-07 Cement Squeeze 666.90 668.10 0
1975-04-08 Perforation 661.40 662.60 13
1975-04-10 Acid Treatment 661.40 662.60 0
1979-01-05 Packing Device Capped w/Cement 658.00 658.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2181 0.0 0.0 0.0

For data sources see[5]

References