X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0424120807002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0424120807002
 
| Well ID: 0424120807002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.599567, -111.693209 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.599567, -111.693209 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-08-042-12W4/2
 
| Location: 00/07-08-042-12W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/07-08-042-12 W4/02
 
| Location Alias 2: 00/07-08-042-12 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 042
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 12
 +
|-
 +
| Section: 08
 
|-
 
|-
 
| County/Municipality: [[Flagstaff County,_Alberta|Flagstaff County]]
 
| County/Municipality: [[Flagstaff County,_Alberta|Flagstaff County]]
Line 17: Line 27:
 
| Well Name: CLEO ENERGY SEDGE 7-8-42-12
 
| Well Name: CLEO ENERGY SEDGE 7-8-42-12
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cleo Energy Corp.]]
 
|-
 
|-
 
| License Number: 0009670
 
| License Number: 0009670
Line 29: Line 39:
 
| Final Drill Date: 1955-08-30
 
| Final Drill Date: 1955-08-30
 
|-
 
|-
| Well Total Depth: 967.7 m
+
| Well Total Depth: 967.70 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.599567
 
| Surface Hole Latitude: 52.599567
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1955-07-04
 +
| Obtained License
 +
|-
 +
| 1955-08-22
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-08-24
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-08-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-08-26
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-08-27
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-08-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-08-30
 +
| Finished Drilling
 +
|-
 +
| 1955-08-30
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1955-08-31
 +
| Production Casing Operation Performed
 +
|-
 +
| 1955-09-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-03-01
 +
| Well Began Production
 +
|-
 +
| 1995-03-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1995-03-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1995-03-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-08-19
 +
| Well Log Performed
 +
|-
 +
| 1996-08-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-03-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-03-06
 +
| Plug Back Performed
 +
|-
 +
| 2001-03-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-03-07
 +
| Plug Back Performed
 +
|-
 +
| 2001-03-07
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2001-03-07
 +
| Well Log Performed
 +
|-
 +
| 2001-03-07
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2001-03-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-03-08
 +
| Well Log Performed
 +
|-
 +
| 2001-03-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-03-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-03-09
 +
| Plug Back Performed
 +
|-
 +
| 2001-03-09
 +
| Well Log Performed
 +
|-
 +
| 2001-10-27
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2017-07-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2017-07-15
 +
| Plug Back Performed
 +
|-
 +
| 2017-07-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2017-07-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2017-07-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2017-07-28
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2017-07-28
 +
| Plug Back Performed
 +
|-
 +
| 2017-08-04
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 216:
 
| 1955-09-03
 
| 1955-09-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 899.5
+
| style="text-align: right;" | 899.50
| style="text-align: right;" | 911.7
+
| style="text-align: right;" | 911.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1995-03-14
 
| 1995-03-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 888.5
+
| style="text-align: right;" | 888.50
| style="text-align: right;" | 890.9
+
| style="text-align: right;" | 890.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1996-08-20
 
| 1996-08-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 869.3
+
| style="text-align: right;" | 869.30
| style="text-align: right;" | 872.3
+
| style="text-align: right;" | 872.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1996-08-20
 
| 1996-08-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 749.8
+
| style="text-align: right;" | 749.80
| style="text-align: right;" | 755.3
+
| style="text-align: right;" | 755.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2001-03-06
 
| 2001-03-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 892.3
+
| style="text-align: right;" | 892.30
| style="text-align: right;" | 895.3
+
| style="text-align: right;" | 895.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-03-07
 
| 2001-03-07
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 876
+
| style="text-align: right;" | 876.00
| style="text-align: right;" | 884
+
| style="text-align: right;" | 884.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-03-07
 
| 2001-03-07
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 858
+
| style="text-align: right;" | 858.00
| style="text-align: right;" | 866
+
| style="text-align: right;" | 866.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-03-08
 
| 2001-03-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 839
+
| style="text-align: right;" | 839.00
| style="text-align: right;" | 843
+
| style="text-align: right;" | 843.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-03-09
 
| 2001-03-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 758.5
+
| style="text-align: right;" | 758.50
| style="text-align: right;" | 761.5
+
| style="text-align: right;" | 761.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-03-09
 
| 2001-03-09
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 828
+
| style="text-align: right;" | 828.00
| style="text-align: right;" | 836
+
| style="text-align: right;" | 836.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-10-27
 
| 2001-10-27
| Fracture  
+
| Fracture
| style="text-align: right;" | 749.8
+
| style="text-align: right;" | 749.80
| style="text-align: right;" | 755.3
+
| style="text-align: right;" | 755.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-07-15
 
| 2017-07-15
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 737
+
| style="text-align: right;" | 737.00
| style="text-align: right;" | 745
+
| style="text-align: right;" | 745.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-07-27
 
| 2017-07-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
| style="text-align: right;" | 313
+
| style="text-align: right;" | 313.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2017-07-28
 
| 2017-07-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2017-07-28
 
| 2017-07-28
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017-07-28
 
| 2017-07-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 300
+
| style="text-align: right;" | 300.00
| style="text-align: right;" | 308
+
| style="text-align: right;" | 308.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 172: Line 314:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 205: Line 361:
 
| 1995
 
| 1995
 
| style="text-align: right;" | 6159
 
| style="text-align: right;" | 6159
| style="text-align: right;" | 1509.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 211: Line 367:
 
| 1996
 
| 1996
 
| style="text-align: right;" | 5867
 
| style="text-align: right;" | 5867
| style="text-align: right;" | 127.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 217: Line 373:
 
| 1997
 
| 1997
 
| style="text-align: right;" | 975
 
| style="text-align: right;" | 975
| style="text-align: right;" | 8.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 223: Line 379:
 
| 1998
 
| 1998
 
| style="text-align: right;" | 557
 
| style="text-align: right;" | 557
| style="text-align: right;" | 3.5
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 229: Line 385:
 
| 1999
 
| 1999
 
| style="text-align: right;" | 507
 
| style="text-align: right;" | 507
| style="text-align: right;" | 3.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 237: Line 393:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 248: Line 404:
 
|-
 
|-
 
| 2017-07-15
 
| 2017-07-15
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2017-07-27
 
| 2017-07-27
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2017-07-28
 
| 2017-07-28
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 266: Line 422:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 09:56, 12 July 2020

Well Details

Well ID: 0424120807002
Loading map...
Location: 00/07-08-042-12W4/2
Location Alias: 00/07-08-42-12 W4M
Location Alias 2: 00/07-08-042-12 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 12
Section: 08
County/Municipality: Flagstaff County
Well Name: CLEO ENERGY SEDGE 7-8-42-12
Operator Name: Cleo Energy Corp.
License Number: 0009670
License Date: 1955-07-04
License Status: Abandoned
Spud Date: 1955-08-16
Final Drill Date: 1955-08-30
Well Total Depth: 967.70 m
Surface Hole Latitude: 52.599567
Surface Hole Longitude: -111.693209

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-07-04 Obtained License
1955-08-22 Drill Stem Test Performed
1955-08-24 Drill Stem Test Performed
1955-08-25 Drill Stem Test Performed
1955-08-26 Drill Stem Test Performed
1955-08-27 Drill Stem Test Performed
1955-08-28 Drill Stem Test Performed
1955-08-30 Finished Drilling
1955-08-30 Well Mode changed to Drilled and Cased
1955-08-31 Production Casing Operation Performed
1955-09-03 Perforation Treatment Performed - Jet Perforation
1995-03-01 Well Began Production
1995-03-01 Well Fluid changed to Gas
1995-03-01 Well Mode changed to Flowing
1995-03-14 Perforation Treatment Performed - Jet Perforation
1996-08-19 Well Log Performed
1996-08-20 Perforation Treatment Performed - Jet Perforation
2001-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-06 Plug Back Performed
2001-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-07 Plug Back Performed
2001-03-07 Well Fluid changed to Gas
2001-03-07 Well Log Performed
2001-03-07 Well Mode changed to Abandoned Zone
2001-03-08 Perforation Treatment Performed - Jet Perforation
2001-03-08 Well Log Performed
2001-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-09 Perforation Treatment Performed - Jet Perforation
2001-03-09 Plug Back Performed
2001-03-09 Well Log Performed
2001-10-27 Perforation Treatment Performed - Fractured
2017-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-07-15 Plug Back Performed
2017-07-27 Perforation Treatment Performed - Jet Perforation
2017-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-07-28 Perforation Treatment Performed - Jet Perforation
2017-07-28 Perforation Treatment Performed - Remedial Casing
2017-07-28 Plug Back Performed
2017-08-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-09-03 Perforation 899.50 911.70 13
1995-03-14 Perforation 888.50 890.90 13
1996-08-20 Perforation 869.30 872.30 13
1996-08-20 Perforation 749.80 755.30 13
2001-03-06 Packing Device Capped w/Cement 892.30 895.30 0
2001-03-07 Packing Device Capped w/Cement 876.00 884.00 0
2001-03-07 Packing Device Capped w/Cement 858.00 866.00 0
2001-03-08 Perforation 839.00 843.00 17
2001-03-09 Perforation 758.50 761.50 17
2001-03-09 Packing Device Capped w/Cement 828.00 836.00 0
2001-10-27 Fracture 749.80 755.30 0
2017-07-15 Packing Device Capped w/Cement 737.00 745.00 0
2017-07-27 Perforation 312.00 313.00 17
2017-07-28 Perforation 0.00 312.00 13
2017-07-28 Remedial Casing Cementing 0.00 312.00 0
2017-07-28 Packing Device Capped w/Cement 300.00 308.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 6159 0.0 0.0 0.0
1996 5867 0.0 0.0 0.0
1997 975 0.0 0.0 0.0
1998 557 0.0 0.0 0.0
1999 507 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-15 No Incident Encountered 0.00 0.00
2017-07-27 No Incident Encountered 0.00 0.00
2017-07-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References