X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0504262108022"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0504262108022
 
| Well ID: 0504262108022
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.32886400000001004, -113.73563699999999699 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.328864, -113.735637 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/08-21-050-26W4/2
 
| Location: 02/08-21-050-26W4/2
 +
|-
 +
| Location Alias: 02/08-21-50-26 W4M
 +
|-
 +
| Location Alias 2: 02/08-21-050-26 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 050
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 21
 +
|-
 +
| County/Municipality: [[Leduc County,_Alberta|Leduc County]]
 
|-
 
|-
 
| Well Name: MEC LEDUC-WB 8-21-50-26
 
| Well Name: MEC LEDUC-WB 8-21-50-26
 +
|-
 +
| Operator Name: [[NEP Canada ULC]]
 +
|-
 +
| License Number: B0002649
 
|-
 
|-
 
| License Date: 1949-02-19
 
| License Date: 1949-02-19
 
|-
 
|-
| Final Drilling Date: 1949-03-28
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1949-02-28
 +
|-
 +
| Final Drill Date: 1949-03-28
 +
|-
 +
| Well Total Depth: 1649.00 m
 +
|-
 +
| Surface Hole Latitude: 53.328864
 +
|-
 +
| Surface Hole Longitude: -113.735637
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1949-02-19
 +
| Obtained License
 +
|-
 +
| 1949-03-28
 +
| Finished Drilling
 +
|-
 +
| 1949-04-01
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1949-04-05
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1949-04-05
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1949-04-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1949-04-11
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1949-04-14
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1949-04-15
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1949-09-17
 +
| Perforation Treatment Performed - Selective Bullet Perforations
 +
|-
 +
| 1949-09-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1949-09-26
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1949-10-05
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1949-10-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1960-08-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1960-08-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1960-09-15
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1962-03-23
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-03-26
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-03-29
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-03-29
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1964-04-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1964-04-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-04-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1974-06-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1974-06-25
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1974-06-25
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1974-06-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1974-07-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1974-07-03
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1976-08-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1976-08-05
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1976-10-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1976-10-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1976-12-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1985-12-09
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1985-12-09
 +
| Plug Back Performed
 +
|-
 +
| 1986-12-02
 +
| Well Log Performed
 +
|-
 +
| 1986-12-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-12-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1998-02-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1998-02-01
 +
| Plug Back Performed
 +
|-
 +
| 1998-02-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-02-02
 +
| Well Log Performed
 +
|-
 +
| 1998-02-10
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-11-07
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2000-11-07
 +
| Plug Back Performed
 +
|-
 +
| 2000-11-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-11-20
 +
| Well Began Production
 +
|-
 +
| 2000-11-20
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2000-11-20
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2007-12-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2007-12-01
 +
| Well Mode changed to Suspended
 
|-
 
|-
| Total Depth: 1649.0m
+
| 2019-09-16
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Gas
+
| 2019-09-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Status: Suspended
+
| 2019-09-17
 +
| Plug Back Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 2019-09-17
 +
| Well Fluid changed to Gas
 
|-
 
|-
| Configuration: Horizontal
+
| 2019-09-17
 +
| Well Log Performed
 
|-
 
|-
| Latitude: 53.32886400000001004
+
| 2019-09-17
 +
| Well Mode changed to Abandoned Zone
 
|-
 
|-
| Longitude: -113.73563699999999699
+
| 2019-09-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
 +
| 2019-09-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2019-09-18
 +
| Plug Back Performed
 +
|-
 +
| 2019-09-18
 +
| Well Log Performed
 +
|-
 +
| 2019-09-19
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-09-19
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2019-09-19
 +
| Plug Back Performed
 +
|-
 +
| 2019-10-24
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1949-04-05
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1631.00
 +
| style="text-align: right;" | 1632.50
 +
| style="text-align: right;" | 20
 +
|-
 +
| 1949-04-05
 +
| Acid Treatment
 +
| style="text-align: right;" | 1631.00
 +
| style="text-align: right;" | 1632.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1949-04-06
 +
| Acid Treatment
 +
| style="text-align: right;" | 1631.00
 +
| style="text-align: right;" | 1632.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1949-04-11
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1631.60
 +
| style="text-align: right;" | 1633.10
 +
| style="text-align: right;" | 30
 +
|-
 +
| 1949-04-14
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1631.30
 +
| style="text-align: right;" | 1632.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1949-04-15
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1631.30
 +
| style="text-align: right;" | 1632.80
 +
| style="text-align: right;" | 26
 +
|-
 +
| 1949-09-17
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1949-09-17
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1949-09-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1949-09-26
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1631.30
 +
| style="text-align: right;" | 1632.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1949-10-05
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1630.70
 +
| style="text-align: right;" | 1632.20
 +
| style="text-align: right;" | 20
 +
|-
 +
| 1949-10-11
 +
| Acid Treatment
 +
| style="text-align: right;" | 1630.70
 +
| style="text-align: right;" | 1632.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1960-08-23
 +
| Perforation
 +
| style="text-align: right;" | 1300.90
 +
| style="text-align: right;" | 1311.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1960-08-23
 +
| Perforation
 +
| style="text-align: right;" | 1285.60
 +
| style="text-align: right;" | 1300.90
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1960-08-24
 +
| Acid Treatment
 +
| style="text-align: right;" | 1285.60
 +
| style="text-align: right;" | 1311.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-03-23
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1285.60
 +
| style="text-align: right;" | 1311.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-03-26
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1285.60
 +
| style="text-align: right;" | 1311.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-03-29
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1285.60
 +
| style="text-align: right;" | 1311.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-04-21
 +
| Perforation
 +
| style="text-align: right;" | 1633.10
 +
| style="text-align: right;" | 1633.40
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1964-04-22
 +
| Acid Treatment
 +
| style="text-align: right;" | 1633.10
 +
| style="text-align: right;" | 1633.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-04-23
 +
| Acid Treatment
 +
| style="text-align: right;" | 1633.10
 +
| style="text-align: right;" | 1633.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-06-21
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 1633.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-06-25
 +
| Acid Treatment
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 1633.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-06-25
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 1633.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-06-27
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1629.20
 +
| style="text-align: right;" | 1633.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-07-02
 +
| Perforation
 +
| style="text-align: right;" | 1631.60
 +
| style="text-align: right;" | 1631.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1974-07-03
 +
| Acid Wash
 +
| style="text-align: right;" | 1631.60
 +
| style="text-align: right;" | 1631.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1976-08-05
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1631.60
 +
| style="text-align: right;" | 1631.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1976-08-05
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1634.60
 +
| style="text-align: right;" | 1649.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1976-10-26
 +
| Perforation
 +
| style="text-align: right;" | 1628.50
 +
| style="text-align: right;" | 1629.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1976-10-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 1628.50
 +
| style="text-align: right;" | 1629.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1976-12-17
 +
| Acid Treatment
 +
| style="text-align: right;" | 1628.50
 +
| style="text-align: right;" | 1629.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-12-09
 +
| Cement Plug
 +
| style="text-align: right;" | 1503.00
 +
| style="text-align: right;" | 1631.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1986-12-03
 +
| Perforation
 +
| style="text-align: right;" | 1526.00
 +
| style="text-align: right;" | 1529.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-03
 +
| Perforation
 +
| style="text-align: right;" | 1535.50
 +
| style="text-align: right;" | 1537.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-03
 +
| Perforation
 +
| style="text-align: right;" | 1538.50
 +
| style="text-align: right;" | 1541.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-04
 +
| Acid Treatment
 +
| style="text-align: right;" | 1526.00
 +
| style="text-align: right;" | 1538.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-02-01
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1510.00
 +
| style="text-align: right;" | 1518.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-02-02
 +
| Perforation
 +
| style="text-align: right;" | 1178.00
 +
| style="text-align: right;" | 1188.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1998-02-10
 +
| Fracture
 +
| style="text-align: right;" | 1178.00
 +
| style="text-align: right;" | 1188.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-11-07
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1124.10
 +
| style="text-align: right;" | 1510.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-11-10
 +
| Perforation
 +
| style="text-align: right;" | 1299.90
 +
| style="text-align: right;" | 1304.90
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2019-09-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1272.00
 +
| style="text-align: right;" | 1280.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1165.00
 +
| style="text-align: right;" | 1173.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 580.00
 +
| style="text-align: right;" | 588.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-18
 +
| Perforation
 +
| style="text-align: right;" | 353.00
 +
| style="text-align: right;" | 354.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2019-09-19
 +
| Cement Squeeze
 +
| style="text-align: right;" | 353.00
 +
| style="text-align: right;" | 354.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-19
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 342.00
 +
| style="text-align: right;" | 350.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2000
 +
| style="text-align: right;" | 1002
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2001
 +
| style="text-align: right;" | 8222
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2002
 +
| style="text-align: right;" | 8303
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2003
 +
| style="text-align: right;" | 928
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2019-09-17
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 13:19, 12 July 2020

Well Details

Well ID: 0504262108022
Loading map...
Location: 02/08-21-050-26W4/2
Location Alias: 02/08-21-50-26 W4M
Location Alias 2: 02/08-21-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 21
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 8-21-50-26
Operator Name: NEP Canada ULC
License Number: B0002649
License Date: 1949-02-19
License Status: Abandoned
Spud Date: 1949-02-28
Final Drill Date: 1949-03-28
Well Total Depth: 1649.00 m
Surface Hole Latitude: 53.328864
Surface Hole Longitude: -113.735637

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-02-19 Obtained License
1949-03-28 Finished Drilling
1949-04-01 Liner Casing Operation Performed
1949-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-04-05 Perforation Treatment Performed - Bullet Perforation
1949-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-04-11 Perforation Treatment Performed - Bullet Perforation
1949-04-14 Perforation Treatment Performed - Bullet Perforation
1949-04-15 Perforation Treatment Performed - Bullet Perforation
1949-09-17 Perforation Treatment Performed - Selective Bullet Perforations
1949-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-09-26 Perforation Treatment Performed - Bullet Perforation
1949-10-05 Perforation Treatment Performed - Bullet Perforation
1949-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-23 Perforation Treatment Performed - Jet Perforation
1960-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-15 Well Mode changed to Drilled and Cased
1962-03-23 Perforation Treatment Performed - Cement Squeeze
1962-03-26 Perforation Treatment Performed - Cement Squeeze
1962-03-29 Perforation Treatment Performed - Cement Squeeze
1962-03-29 Well Mode changed to Abandoned Zone
1964-04-21 Perforation Treatment Performed - Jet Perforation
1964-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-21 Perforation Treatment Performed - Cement Squeeze
1974-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-25 Perforation Treatment Performed - Cement Squeeze
1974-06-27 Perforation Treatment Performed - Cement Squeeze
1974-07-02 Perforation Treatment Performed - Jet Perforation
1974-07-03 Perforation Treatment Performed - Acid Wash - No Pressure
1976-08-05 Perforation Treatment Performed - Cement Squeeze
1976-08-05 Perforation Treatment Performed - Open-Hole Completion
1976-10-26 Perforation Treatment Performed - Jet Perforation
1976-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-09 Perforation Treatment Performed - Cement Plug
1985-12-09 Plug Back Performed
1986-12-02 Well Log Performed
1986-12-03 Perforation Treatment Performed - Jet Perforation
1986-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-01 Plug Back Performed
1998-02-02 Perforation Treatment Performed - Jet Perforation
1998-02-02 Well Log Performed
1998-02-10 Perforation Treatment Performed - Fractured
2000-11-07 Perforation Treatment Performed - Cement Squeeze
2000-11-07 Plug Back Performed
2000-11-10 Perforation Treatment Performed - Jet Perforation
2000-11-20 Well Began Production
2000-11-20 Well Fluid changed to Gas
2000-11-20 Well Mode changed to Flowing
2007-12-01 Well Fluid changed to Gas
2007-12-01 Well Mode changed to Suspended
2019-09-16 Well Log Performed
2019-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-17 Plug Back Performed
2019-09-17 Well Fluid changed to Gas
2019-09-17 Well Log Performed
2019-09-17 Well Mode changed to Abandoned Zone
2019-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-18 Perforation Treatment Performed - Jet Perforation
2019-09-18 Plug Back Performed
2019-09-18 Well Log Performed
2019-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-19 Perforation Treatment Performed - Cement Squeeze
2019-09-19 Plug Back Performed
2019-10-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-04-05 Bullet Perforation 1631.00 1632.50 20
1949-04-05 Acid Treatment 1631.00 1632.50 0
1949-04-06 Acid Treatment 1631.00 1632.50 0
1949-04-11 Bullet Perforation 1631.60 1633.10 30
1949-04-14 Bullet Perforation 1631.30 1632.80 7
1949-04-15 Bullet Perforation 1631.30 1632.80 26
1949-09-17 Selective Bullet Perforations 1629.20 1629.20 0
1949-09-17 Selective Bullet Perforations 1629.20 1629.20 0
1949-09-21 Acid Treatment 1629.20 1629.20 0
1949-09-26 Bullet Perforation 1631.30 1632.80 0
1949-10-05 Bullet Perforation 1630.70 1632.20 20
1949-10-11 Acid Treatment 1630.70 1632.20 0
1960-08-23 Perforation 1300.90 1311.90 7
1960-08-23 Perforation 1285.60 1300.90 3
1960-08-24 Acid Treatment 1285.60 1311.90 0
1962-03-23 Cement Squeeze 1285.60 1311.90 0
1962-03-26 Cement Squeeze 1285.60 1311.90 0
1962-03-29 Cement Squeeze 1285.60 1311.90 0
1964-04-21 Perforation 1633.10 1633.40 16
1964-04-22 Acid Treatment 1633.10 1633.40 0
1964-04-23 Acid Treatment 1633.10 1633.40 0
1974-06-21 Cement Squeeze 1629.20 1633.40 0
1974-06-25 Acid Treatment 1629.20 1633.40 0
1974-06-25 Cement Squeeze 1629.20 1633.40 0
1974-06-27 Cement Squeeze 1629.20 1633.40 0
1974-07-02 Perforation 1631.60 1631.90 7
1974-07-03 Acid Wash 1631.60 1631.90 0
1976-08-05 Cement Squeeze 1631.60 1631.90 0
1976-08-05 Open Hole/Barefoot Completion 1634.60 1649.00 0
1976-10-26 Perforation 1628.50 1629.80 7
1976-10-28 Acid Treatment 1628.50 1629.80 0
1976-12-17 Acid Treatment 1628.50 1629.80 0
1985-12-09 Cement Plug 1503.00 1631.00 0
1986-12-03 Perforation 1526.00 1529.00 13
1986-12-03 Perforation 1535.50 1537.50 13
1986-12-03 Perforation 1538.50 1541.50 13
1986-12-04 Acid Treatment 1526.00 1538.50 0
1998-02-01 Packing Device Capped w/Cement 1510.00 1518.00 0
1998-02-02 Perforation 1178.00 1188.00 14
1998-02-10 Fracture 1178.00 1188.00 0
2000-11-07 Cement Squeeze 1124.10 1510.00 0
2000-11-10 Perforation 1299.90 1304.90 17
2019-09-17 Packing Device Capped w/Cement 1272.00 1280.00 0
2019-09-18 Packing Device Capped w/Cement 1165.00 1173.00 0
2019-09-18 Packing Device Capped w/Cement 580.00 588.00 0
2019-09-18 Perforation 353.00 354.00 13
2019-09-19 Cement Squeeze 353.00 354.00 0
2019-09-19 Packing Device Capped w/Cement 342.00 350.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1002 0.0 0.0 0.0
2001 8222 0.0 0.0 0.0
2002 8303 0.0 0.0 0.0
2003 928 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References