If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0514260502002 | | Well ID: 0514260502002 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 53.368777, -113.796639 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/02-05-051-26W4/2 | | Location: 00/02-05-051-26W4/2 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/02-05-051-26 W4/02 | | Location Alias 2: 00/02-05-051-26 W4/02 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 051 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 26 | ||
+ | |- | ||
+ | | Section: 05 | ||
|- | |- | ||
| County/Municipality: [[Parkland County,_Alberta|Parkland County]] | | County/Municipality: [[Parkland County,_Alberta|Parkland County]] | ||
Line 17: | Line 27: | ||
| Well Name: MEC LEDUC-WB 2-5-51-26 | | Well Name: MEC LEDUC-WB 2-5-51-26 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[NEP Canada ULC]] |
|- | |- | ||
| License Number: 0000724 | | License Number: 0000724 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1949-11-24 | | Final Drill Date: 1949-11-24 | ||
|- | |- | ||
− | | Well Total Depth: 1617. | + | | Well Total Depth: 1617.30 m |
|- | |- | ||
| Surface Hole Latitude: 53.368777 | | Surface Hole Latitude: 53.368777 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1949-10-08 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1949-11-12 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1949-11-13 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1949-11-16 | ||
+ | | Liner Casing Operation Performed | ||
+ | |- | ||
+ | | 1949-11-24 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1949-11-24 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1949-11-24 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1952-11-15 | ||
+ | | Perforation Treatment Performed - Bullet Perforation | ||
+ | |- | ||
+ | | 1952-11-15 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1952-11-17 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1952-11-20 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1952-12-01 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1952-12-20 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1952-12-20 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1952-12-20 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1954-09-09 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1954-09-09 | ||
+ | | Well Mode changed to Pumping | ||
+ | |- | ||
+ | | 1955-06-15 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1955-06-15 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1960-06-29 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1960-06-29 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 1972-11-06 | ||
+ | | Perforation Treatment Performed - Acid Wash - No Pressure | ||
+ | |- | ||
+ | | 1972-11-07 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1972-11-09 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1972-11-15 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1972-11-17 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1972-11-23 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1972-11-23 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1972-11-23 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | | 1983-08-12 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 1983-08-16 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1983-08-17 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1996-03-20 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1996-03-21 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1996-03-21 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1996-03-21 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1996-03-22 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1996-05-29 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | | 2014-09-11 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2014-09-15 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2014-09-15 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2014-09-15 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2014-09-15 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-16 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2014-09-16 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-18 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2014-09-18 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2014-09-19 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2014-09-19 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2014-09-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 270: | ||
| 1949-11-24 | | 1949-11-24 | ||
| Open Hole/Barefoot Completion | | Open Hole/Barefoot Completion | ||
− | | style="text-align: right;" | 1615. | + | | style="text-align: right;" | 1615.70 |
− | | style="text-align: right;" | 1617. | + | | style="text-align: right;" | 1617.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1952-11-15 | | 1952-11-15 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1952-11-15 | | 1952-11-15 | ||
| Bullet Perforation | | Bullet Perforation | ||
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1952-11-17 | | 1952-11-17 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1952-11-20 | | 1952-11-20 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1952-12-01 | | 1952-12-01 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1972-11-06 | | 1972-11-06 | ||
− | | Acid Wash | + | | Acid Wash |
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1972-11-07 | | 1972-11-07 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1972-11-09 | | 1972-11-09 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1972-11-15 | | 1972-11-15 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1972-11-17 | | 1972-11-17 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1972-11-23 | | 1972-11-23 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1517. | + | | style="text-align: right;" | 1517.60 |
− | | style="text-align: right;" | 1531. | + | | style="text-align: right;" | 1531.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1983-08-12 | | 1983-08-12 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 1612. | + | | style="text-align: right;" | 1612.40 |
− | | style="text-align: right;" | 1617. | + | | style="text-align: right;" | 1617.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1983-08-16 | | 1983-08-16 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1611. | + | | style="text-align: right;" | 1611.80 |
− | | style="text-align: right;" | 1612 | + | | style="text-align: right;" | 1612.00 |
| style="text-align: right;" | 10 | | style="text-align: right;" | 10 | ||
|- | |- | ||
| 1983-08-17 | | 1983-08-17 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1611. | + | | style="text-align: right;" | 1611.80 |
− | | style="text-align: right;" | 1612 | + | | style="text-align: right;" | 1612.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1996-03-20 | | 1996-03-20 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1611. | + | | style="text-align: right;" | 1611.80 |
− | | style="text-align: right;" | 1612 | + | | style="text-align: right;" | 1612.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1996-03-21 | | 1996-03-21 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1554 | + | | style="text-align: right;" | 1554.00 |
− | | style="text-align: right;" | 1562 | + | | style="text-align: right;" | 1562.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1996-03-21 | | 1996-03-21 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1230 | + | | style="text-align: right;" | 1230.00 |
− | | style="text-align: right;" | 1238 | + | | style="text-align: right;" | 1238.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1996-03-21 | | 1996-03-21 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 160 | + | | style="text-align: right;" | 160.00 |
− | | style="text-align: right;" | 161 | + | | style="text-align: right;" | 161.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1996-03-21 | | 1996-03-21 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 115 | + | | style="text-align: right;" | 115.00 |
− | | style="text-align: right;" | 165 | + | | style="text-align: right;" | 165.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-12 | | 2014-09-12 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 1587 | + | | style="text-align: right;" | 1587.00 |
− | | style="text-align: right;" | 1595 | + | | style="text-align: right;" | 1595.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-12 | | 2014-09-12 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1549 | + | | style="text-align: right;" | 1549.00 |
− | | style="text-align: right;" | 1557 | + | | style="text-align: right;" | 1557.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-12 | | 2014-09-12 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1502 | + | | style="text-align: right;" | 1502.00 |
− | | style="text-align: right;" | 1510 | + | | style="text-align: right;" | 1510.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-13 | | 2014-09-13 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1069 | + | | style="text-align: right;" | 1069.00 |
− | | style="text-align: right;" | 1070 | + | | style="text-align: right;" | 1070.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-14 | | 2014-09-14 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 1040. | + | | style="text-align: right;" | 1040.50 |
− | | style="text-align: right;" | 1098. | + | | style="text-align: right;" | 1098.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-15 | | 2014-09-15 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 546 | + | | style="text-align: right;" | 546.00 |
− | | style="text-align: right;" | 547 | + | | style="text-align: right;" | 547.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-15 | | 2014-09-15 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 546 | + | | style="text-align: right;" | 546.00 |
− | | style="text-align: right;" | 547 | + | | style="text-align: right;" | 547.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-15 | | 2014-09-15 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 529 | + | | style="text-align: right;" | 529.00 |
− | | style="text-align: right;" | 540. | + | | style="text-align: right;" | 540.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-16 | | 2014-09-16 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 330 | + | | style="text-align: right;" | 330.00 |
− | | style="text-align: right;" | 331 | + | | style="text-align: right;" | 331.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-18 | | 2014-09-18 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 330 | + | | style="text-align: right;" | 330.00 |
− | | style="text-align: right;" | 331 | + | | style="text-align: right;" | 331.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-18 | | 2014-09-18 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 312 | + | | style="text-align: right;" | 312.00 |
− | | style="text-align: right;" | 324. | + | | style="text-align: right;" | 324.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-19 | | 2014-09-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 160 | + | | style="text-align: right;" | 160.00 |
− | | style="text-align: right;" | 161 | + | | style="text-align: right;" | 161.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 2014-09-19 | | 2014-09-19 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 160 | + | | style="text-align: right;" | 160.00 |
− | | style="text-align: right;" | 161 | + | | style="text-align: right;" | 161.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-19 | | 2014-09-19 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 144. | + | | style="text-align: right;" | 144.50 |
− | | style="text-align: right;" | 155. | + | | style="text-align: right;" | 155.20 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 280: | Line 476: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Trade Name |
− | + | !scope="col" | Supplier | |
− | !scope="col | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 313: | Line 523: | ||
| 1961 | | 1961 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
|} | |} | ||
Line 321: | Line 531: | ||
| title = Well Production Data - All Alberta | | title = Well Production Data - All Alberta | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
== Occurences == | == Occurences == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 332: | Line 542: | ||
|- | |- | ||
| 2014-09-20 | | 2014-09-20 | ||
− | | No Incident | + | | No Incident Encountered |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
|- | |- | ||
|} | |} | ||
Line 340: | Line 550: | ||
| title = General Well Data File - Tour-Occurence Data | | title = General Well Data File - Tour-Occurence Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Alberta]][[Category:Wells]] | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0514260502002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.368777,"lon":-113.796639,"icon":""}]} |
Location: 00/02-05-051-26W4/2 | |
Location Alias: 00/02-05-51-26 W4M | |
Location Alias 2: 00/02-05-051-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 05 | |
County/Municipality: Parkland County | |
Well Name: MEC LEDUC-WB 2-5-51-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0000724 | |
License Date: 1949-10-08 | |
License Status: Suspension | |
Spud Date: 1949-10-20 | |
Final Drill Date: 1949-11-24 | |
Well Total Depth: 1617.30 m | |
Surface Hole Latitude: 53.368777 | |
Surface Hole Longitude: -113.796639 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-10-08 | Obtained License |
1949-11-12 | Drill Stem Test Performed |
1949-11-13 | Drill Stem Test Performed |
1949-11-16 | Liner Casing Operation Performed |
1949-11-24 | Finished Drilling |
1949-11-24 | Perforation Treatment Performed - Open-Hole Completion |
1949-11-24 | Well Mode changed to Drilled and Cased |
1952-11-15 | Perforation Treatment Performed - Bullet Perforation |
1952-11-15 | Perforation Treatment Performed - Jet Perforation |
1952-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-12-20 | Well Began Production |
1952-12-20 | Well Fluid changed to Crude Oil |
1952-12-20 | Well Mode changed to Flowing |
1954-09-09 | Well Fluid changed to Crude Oil |
1954-09-09 | Well Mode changed to Pumping |
1955-06-15 | Well Fluid changed to Crude Oil |
1955-06-15 | Well Mode changed to Flowing |
1960-06-29 | Well Fluid changed to Crude Oil |
1960-06-29 | Well Mode changed to Suspended |
1972-11-06 | Perforation Treatment Performed - Acid Wash - No Pressure |
1972-11-07 | Perforation Treatment Performed - Cement Squeeze |
1972-11-09 | Perforation Treatment Performed - Cement Squeeze |
1972-11-15 | Perforation Treatment Performed - Cement Squeeze |
1972-11-17 | Perforation Treatment Performed - Cement Squeeze |
1972-11-23 | Perforation Treatment Performed - Cement Squeeze |
1972-11-23 | Well Fluid changed to Crude Oil |
1972-11-23 | Well Mode changed to Abandoned Zone |
1983-08-12 | Perforation Treatment Performed - Cement Plug |
1983-08-16 | Perforation Treatment Performed - Jet Perforation |
1983-08-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-03-20 | Perforation Treatment Performed - Cement Squeeze |
1996-03-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-03-21 | Perforation Treatment Performed - Jet Perforation |
1996-03-21 | Plug Back Performed |
1996-03-22 | Well Log Performed |
1996-05-29 | Well Abandoned |
2014-09-11 | Well Log Performed |
2014-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-09-12 | Perforation Treatment Performed - Cement Plug |
2014-09-12 | Plug Back Performed |
2014-09-12 | Well Log Performed |
2014-09-13 | Perforation Treatment Performed - Jet Perforation |
2014-09-13 | Well Log Performed |
2014-09-14 | Perforation Treatment Performed - Cement Plug |
2014-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-09-15 | Perforation Treatment Performed - Cement Squeeze |
2014-09-15 | Perforation Treatment Performed - Jet Perforation |
2014-09-15 | Well Log Performed |
2014-09-16 | Perforation Treatment Performed - Jet Perforation |
2014-09-16 | Well Log Performed |
2014-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-09-18 | Perforation Treatment Performed - Cement Squeeze |
2014-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-09-19 | Perforation Treatment Performed - Cement Squeeze |
2014-09-19 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-11-24 | Open Hole/Barefoot Completion | 1615.70 | 1617.30 | 0 |
1952-11-15 | Perforation | 1517.60 | 1531.30 | 13 |
1952-11-15 | Bullet Perforation | 1517.60 | 1531.30 | 13 |
1952-11-17 | Acid Treatment | 1517.60 | 1531.30 | 0 |
1952-11-20 | Acid Treatment | 1517.60 | 1531.30 | 0 |
1952-12-01 | Acid Treatment | 1517.60 | 1531.30 | 0 |
1972-11-06 | Acid Wash | 1517.60 | 1531.30 | 0 |
1972-11-07 | Cement Squeeze | 1517.60 | 1531.30 | 0 |
1972-11-09 | Cement Squeeze | 1517.60 | 1531.30 | 0 |
1972-11-15 | Cement Squeeze | 1517.60 | 1531.30 | 0 |
1972-11-17 | Cement Squeeze | 1517.60 | 1531.30 | 0 |
1972-11-23 | Cement Squeeze | 1517.60 | 1531.30 | 0 |
1983-08-12 | Cement Plug | 1612.40 | 1617.30 | 0 |
1983-08-16 | Perforation | 1611.80 | 1612.00 | 10 |
1983-08-17 | Acid Treatment | 1611.80 | 1612.00 | 0 |
1996-03-20 | Cement Squeeze | 1611.80 | 1612.00 | 0 |
1996-03-21 | Packing Device Capped w/Cement | 1554.00 | 1562.00 | 0 |
1996-03-21 | Packing Device Capped w/Cement | 1230.00 | 1238.00 | 0 |
1996-03-21 | Perforation | 160.00 | 161.00 | 13 |
1996-03-21 | Packing Device Capped w/Cement | 115.00 | 165.00 | 0 |
2014-09-12 | Cement Plug | 1587.00 | 1595.00 | 0 |
2014-09-12 | Packing Device Capped w/Cement | 1549.00 | 1557.00 | 0 |
2014-09-12 | Packing Device Capped w/Cement | 1502.00 | 1510.00 | 0 |
2014-09-13 | Perforation | 1069.00 | 1070.00 | 17 |
2014-09-14 | Cement Plug | 1040.50 | 1098.50 | 0 |
2014-09-15 | Perforation | 546.00 | 547.00 | 17 |
2014-09-15 | Cement Squeeze | 546.00 | 547.00 | 0 |
2014-09-15 | Packing Device Capped w/Cement | 529.00 | 540.30 | 0 |
2014-09-16 | Perforation | 330.00 | 331.00 | 17 |
2014-09-18 | Cement Squeeze | 330.00 | 331.00 | 0 |
2014-09-18 | Packing Device Capped w/Cement | 312.00 | 324.50 | 0 |
2014-09-19 | Perforation | 160.00 | 161.00 | 13 |
2014-09-19 | Cement Squeeze | 160.00 | 161.00 | 0 |
2014-09-19 | Packing Device Capped w/Cement | 144.50 | 155.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-09-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]