X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0615160103000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0615160103000
 
| Well ID: 0615160103000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.241489, -116.267119 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.241489, -116.267119 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/03-01-061-16W5/0
 
| Location: 00/03-01-061-16W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/03-01-061-16 W5/00
 
| Location Alias 2: 00/03-01-061-16 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 061
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 16
 +
|-
 +
| Section: 01
 
|-
 
|-
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
Line 17: Line 27:
 
| Well Name: TIDEWATER WIND 3-1-61-16
 
| Well Name: TIDEWATER WIND 3-1-61-16
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Tidewater Midstream and Infrastructure Ltd.]]
 
|-
 
|-
 
| License Number: 0030873
 
| License Number: 0030873
Line 29: Line 39:
 
| Final Drill Date: 1966-09-28
 
| Final Drill Date: 1966-09-28
 
|-
 
|-
| Well Total Depth: 2567.9 m
+
| Well Total Depth: 2567.90 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.241489
 
| Surface Hole Latitude: 54.241489
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1966-08-25
 +
| Obtained License
 +
|-
 +
| 1966-09-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1966-09-28
 +
| Finished Drilling
 +
|-
 +
| 1966-09-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1966-09-29
 +
| Production Casing Operation Performed
 +
|-
 +
| 1966-10-06
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1966-10-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1966-10-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1966-10-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1966-12-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1966-12-15
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1967-02-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1967-02-01
 +
| Well Mode changed to Testing
 +
|-
 +
| 1974-11-01
 +
| Well Began Production
 +
|-
 +
| 1974-11-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1974-11-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1974-11-06
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1974-11-06
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1975-10-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-10-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1975-10-22
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 2000-07-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-07-05
 +
| Plug Back Performed
 +
|-
 +
| 2000-07-05
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2000-07-05
 +
| Well Log Performed
 +
|-
 +
| 2000-07-05
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2000-07-08
 +
| Well Log Performed
 +
|-
 +
| 2000-07-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-07-10
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2000-07-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-07-10
 +
| Plug Back Performed
 +
|-
 +
| 2000-07-10
 +
| Well Log Performed
 +
|-
 +
| 2000-07-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-07-14
 +
| Well Log Performed
 +
|-
 +
| 2000-07-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-07-18
 +
| Well Log Performed
 +
|-
 +
| 2000-07-19
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-07-19
 +
| Plug Back Performed
 +
|-
 +
| 2000-07-19
 +
| Well Log Performed
 +
|-
 +
| 2002-03-23
 +
| Well Log Performed
 +
|-
 +
| 2002-03-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-25
 +
| Well Log Performed
 +
|-
 +
| 2002-03-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-03-26
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2002-03-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-27
 +
| Well Log Performed
 +
|-
 +
| 2002-03-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-03-28
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2002-06-08
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 73: Line 245:
 
|-
 
|-
 
| 1966-10-06
 
| 1966-10-06
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2521
+
| style="text-align: right;" | 2521.00
| style="text-align: right;" | 2521.6
+
| style="text-align: right;" | 2521.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-10-06
 
| 1966-10-06
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2522.2
+
| style="text-align: right;" | 2522.20
| style="text-align: right;" | 2522.8
+
| style="text-align: right;" | 2522.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-10-06
 
| 1966-10-06
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2523.4
+
| style="text-align: right;" | 2523.40
| style="text-align: right;" | 2523.7
+
| style="text-align: right;" | 2523.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-10-06
 
| 1966-10-06
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 2525
+
| style="text-align: right;" | 2525.00
| style="text-align: right;" | 2525.3
+
| style="text-align: right;" | 2525.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-10-12
 
| 1966-10-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2521
+
| style="text-align: right;" | 2521.00
| style="text-align: right;" | 2521.9
+
| style="text-align: right;" | 2521.90
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1966-10-12
 
| 1966-10-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2525
+
| style="text-align: right;" | 2525.00
| style="text-align: right;" | 2526.2
+
| style="text-align: right;" | 2526.20
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1966-10-14
 
| 1966-10-14
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2521
+
| style="text-align: right;" | 2521.00
| style="text-align: right;" | 2526.2
+
| style="text-align: right;" | 2526.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-10-20
 
| 1966-10-20
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2521
+
| style="text-align: right;" | 2521.00
| style="text-align: right;" | 2526.2
+
| style="text-align: right;" | 2526.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-12-12
 
| 1966-12-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2527.4
+
| style="text-align: right;" | 2527.40
| style="text-align: right;" | 2533.8
+
| style="text-align: right;" | 2533.80
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1966-12-15
 
| 1966-12-15
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2521
+
| style="text-align: right;" | 2521.00
| style="text-align: right;" | 2533.8
+
| style="text-align: right;" | 2533.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1975-10-21
 
| 1975-10-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1451.2
+
| style="text-align: right;" | 1451.20
| style="text-align: right;" | 1452.4
+
| style="text-align: right;" | 1452.40
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1975-10-21
 
| 1975-10-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1453.6
+
| style="text-align: right;" | 1453.60
| style="text-align: right;" | 1455.7
+
| style="text-align: right;" | 1455.70
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1975-10-22
 
| 1975-10-22
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 1451.2
+
| style="text-align: right;" | 1451.20
| style="text-align: right;" | 1455.7
+
| style="text-align: right;" | 1455.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1975-10-22
 
| 1975-10-22
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1451.2
+
| style="text-align: right;" | 1451.20
| style="text-align: right;" | 1455.7
+
| style="text-align: right;" | 1455.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-07-05
 
| 2000-07-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2482
+
| style="text-align: right;" | 2482.00
| style="text-align: right;" | 2490
+
| style="text-align: right;" | 2490.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-07-10
 
| 2000-07-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1435
+
| style="text-align: right;" | 1435.00
| style="text-align: right;" | 1443
+
| style="text-align: right;" | 1443.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-07-10
 
| 2000-07-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 870
+
| style="text-align: right;" | 870.00
| style="text-align: right;" | 871
+
| style="text-align: right;" | 871.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2000-07-10
 
| 2000-07-10
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 870
+
| style="text-align: right;" | 870.00
| style="text-align: right;" | 871
+
| style="text-align: right;" | 871.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000-07-14
 
| 2000-07-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 823.1
+
| style="text-align: right;" | 823.10
| style="text-align: right;" | 832.1
+
| style="text-align: right;" | 832.10
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2000-07-18
 
| 2000-07-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 777
+
| style="text-align: right;" | 777.00
| style="text-align: right;" | 788
+
| style="text-align: right;" | 788.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2000-07-19
 
| 2000-07-19
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 764
+
| style="text-align: right;" | 764.00
| style="text-align: right;" | 772
+
| style="text-align: right;" | 772.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-25
 
| 2002-03-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 468
+
| style="text-align: right;" | 468.00
| style="text-align: right;" | 469
+
| style="text-align: right;" | 469.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2002-03-26
 
| 2002-03-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 468
+
| style="text-align: right;" | 468.00
| style="text-align: right;" | 469
+
| style="text-align: right;" | 469.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-26
 
| 2002-03-26
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 449
+
| style="text-align: right;" | 449.00
| style="text-align: right;" | 458
+
| style="text-align: right;" | 458.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-27
 
| 2002-03-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 306
+
| style="text-align: right;" | 306.00
| style="text-align: right;" | 307
+
| style="text-align: right;" | 307.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2002-03-28
 
| 2002-03-28
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 306
+
| style="text-align: right;" | 306.00
| style="text-align: right;" | 307
+
| style="text-align: right;" | 307.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-03-28
 
| 2002-03-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 291
+
| style="text-align: right;" | 291.00
| style="text-align: right;" | 300
+
| style="text-align: right;" | 300.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 238: Line 410:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 271: Line 457:
 
| 1967
 
| 1967
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 450.8
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 277: Line 463:
 
| 1974
 
| 1974
 
| style="text-align: right;" | 101
 
| style="text-align: right;" | 101
| style="text-align: right;" | 50.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 38.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 285: Line 471:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 10:00, 13 July 2020

Well Details

Well ID: 0615160103000
Loading map...
Location: 00/03-01-061-16W5/0
Location Alias: 00/03-01-61-16 W5M
Location Alias 2: 00/03-01-061-16 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 16
Section: 01
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 3-1-61-16
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0030873
License Date: 1966-08-25
License Status: Abandoned
Spud Date: 1966-09-03
Final Drill Date: 1966-09-28
Well Total Depth: 2567.90 m
Surface Hole Latitude: 54.241489
Surface Hole Longitude: -116.267119

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-25 Obtained License
1966-09-11 Drill Stem Test Performed
1966-09-28 Finished Drilling
1966-09-28 Well Mode changed to Drilled and Cased
1966-09-29 Production Casing Operation Performed
1966-10-06 Perforation Treatment Performed - Selective Jet Perforations
1966-10-12 Perforation Treatment Performed - Jet Perforation
1966-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-12-12 Perforation Treatment Performed - Jet Perforation
1966-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-01 Well Fluid changed to Gas
1967-02-01 Well Mode changed to Testing
1974-11-01 Well Began Production
1974-11-01 Well Fluid changed to Gas
1974-11-01 Well Mode changed to Flowing
1974-11-06 Well Fluid changed to Gas
1974-11-06 Well Mode changed to Suspended
1975-10-21 Perforation Treatment Performed - Jet Perforation
1975-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-22 Perforation Treatment Performed - Acid Wash - No Pressure
2000-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-05 Plug Back Performed
2000-07-05 Well Fluid changed to Gas
2000-07-05 Well Log Performed
2000-07-05 Well Mode changed to Abandoned Zone
2000-07-08 Well Log Performed
2000-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-10 Perforation Treatment Performed - Cement Squeeze
2000-07-10 Perforation Treatment Performed - Jet Perforation
2000-07-10 Plug Back Performed
2000-07-10 Well Log Performed
2000-07-14 Perforation Treatment Performed - Jet Perforation
2000-07-14 Well Log Performed
2000-07-18 Perforation Treatment Performed - Jet Perforation
2000-07-18 Well Log Performed
2000-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-19 Plug Back Performed
2000-07-19 Well Log Performed
2002-03-23 Well Log Performed
2002-03-25 Perforation Treatment Performed - Jet Perforation
2002-03-25 Well Log Performed
2002-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-26 Perforation Treatment Performed - Remedial Casing
2002-03-27 Perforation Treatment Performed - Jet Perforation
2002-03-27 Well Log Performed
2002-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-28 Perforation Treatment Performed - Remedial Casing
2002-06-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-06 Selective Jet Perforations 2521.00 2521.60 0
1966-10-06 Selective Jet Perforations 2522.20 2522.80 0
1966-10-06 Selective Jet Perforations 2523.40 2523.70 0
1966-10-06 Selective Jet Perforations 2525.00 2525.30 0
1966-10-12 Perforation 2521.00 2521.90 7
1966-10-12 Perforation 2525.00 2526.20 7
1966-10-14 Acid Treatment 2521.00 2526.20 0
1966-10-20 Acid Treatment 2521.00 2526.20 0
1966-12-12 Perforation 2527.40 2533.80 7
1966-12-15 Acid Treatment 2521.00 2533.80 0
1975-10-21 Perforation 1451.20 1452.40 7
1975-10-21 Perforation 1453.60 1455.70 7
1975-10-22 Acid Wash 1451.20 1455.70 0
1975-10-22 Acid Treatment 1451.20 1455.70 0
2000-07-05 Packing Device Capped w/Cement 2482.00 2490.00 0
2000-07-10 Packing Device Capped w/Cement 1435.00 1443.00 0
2000-07-10 Perforation 870.00 871.00 20
2000-07-10 Cement Squeeze 870.00 871.00 0
2000-07-14 Perforation 823.10 832.10 20
2000-07-18 Perforation 777.00 788.00 20
2000-07-19 Packing Device Capped w/Cement 764.00 772.00 0
2002-03-25 Perforation 468.00 469.00 14
2002-03-26 Remedial Casing Cementing 468.00 469.00 0
2002-03-26 Packing Device Capped w/Cement 449.00 458.00 0
2002-03-27 Perforation 306.00 307.00 14
2002-03-28 Remedial Casing Cementing 306.00 307.00 0
2002-03-28 Packing Device Capped w/Cement 291.00 300.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1974 101 0.0 0.0 0.0

For data sources see[5]

References