If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 361: | Line 361: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-015-21237 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.666425,"lon":-76.709769,"icon":""}]} |
County: Bradford | |
Municipality: Leroy Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 147742 | |
Farm/Lease Name: ATGAS 2H | |
First Permit Date: 2010-09-30 | |
Last Permit Date: 2010-09-30 | |
Spud Date: 2010-12-22 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 6 | |
Latitude: 41.666425 | |
Longitude: -76.709769 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1921811 | 2010-10-20 | No Violations Noted | ||
1968615 | 2011-04-23 | Outstanding Violations - No Viols Req'd | ||
1968658 | 2011-04-21 | Outstanding Violations - No Viols Req'd | Joe Jones on site to relieve Belo. Rig is in place but plan has not yet been discussed with Boots and Coots. Plan is to meet with B&C at 10AM to dicuss plan of junk shots. Expecting first junk shot to hit between 2 and 3PM. Well diminished flow. Pressure reduced. Currently showing gas - B & C very optomistic of junk shots. After junk shots, plan on doing dynamic fluid kiil at surface. Currently installing 2' manifold for junk shots. Will use 17-18# mud to seal off. | |
1968659 | 2011-04-22 | Outstanding Violations - No Viols Req'd | Well stabilized and currently shut in. 0% LEL at wellhead. Next sch briefing at 7AM Sat. Crews preparing for major rain event. Lining location and restructing berms to contain and fluids. | |
1968660 | 2011-04-24 | Outstanding Violations - No Viols Req'd | Pressure testing of lines and valves done with water as mud is too thick and contains debris. coil rig pushed 45' of tubing to ensure seal couold withstand procedure. 4' manifold is going to used for circulating mud. 2' manifold will be in place in case junk shot is needed. Collar/diverter attached in case emergency flow occurs to divert fluids away from wellhead. Circulation procedure will be a closed loop system. | |
1968661 | 2011-04-25 | Outstanding Violations - No Viols Req'd | 17:22 - Coil tubing out, Plan to take head off.
17:40 - Plan is to use 250K crane to remove old well head. Will use smaller crane for new well head. 17:53 - Old well head removed. 18:05 - New wellhead installed 18:24 - Well capped and under control. Bolts being tightened in cellar, however still suspended by cran 20:00 - Pressure on annuli 0psi. Lel = 0% throughtout night. |
|
1968825 | 2011-04-25 | Outstanding Violations - No Viols Req'd | no activity midnight till end of shift 08:00 pressure 1450 # lel 4 | |
1968938 | 2011-04-22 | Violation(s) Noted | 609731 | |
1968938 | 2011-04-22 | Violation(s) Noted | 609731 | |
1968938 | 2011-04-22 | Violation(s) Noted | 609732 | |
1968938 | 2011-04-22 | Violation(s) Noted | 609732 | |
1968938 | 2011-04-22 | Violation(s) Noted | 609733 | |
1968938 | 2011-04-22 | Violation(s) Noted | 609733 | |
1968983 | 2011-04-24 | Outstanding Violations - No Viols Req'd | ||
1969089 | 2011-04-23 | Outstanding Violations - No Viols Req'd | Provided onsite oversight for well control / blowout Emergency. Arrived at command Center about 0800 hrs. 4/23/11 to relieve Bob Young, received briefing. 0900 CHK Rep. Rick Hall escorted Bob & I to well pad for inspection. E&S controls and runoff controls were in place and appeared to be operating adequately. Wellhead flange diverter was in the process of fabrication. The wellhead was secured and no fluid discharge from the compromised flange was evident. Met Belo Kellum (CHK) and discussed well status and current planning. Installation of 4 deadman anchors was in process. The coiled tubing unit was not on location. 0945 Kevin Patterson reported 0 % LEL at the wellhead. 1119 Belo Kellum provided a briefing update. Wellhead pressure = 1,000 psi and stable. | |
1969255 | 2011-04-20 | Outstanding Violations - No Viols Req'd | ||
1969258 | 2011-04-21 | Outstanding Violations - No Viols Req'd | ||
1969261 | 2011-04-22 | Outstanding Violations - No Viols Req'd | ||
1969263 | 2011-04-24 | Outstanding Violations - No Viols Req'd | ||
1969265 | 2011-04-25 | Outstanding Violations - No Viols Req'd | ||
1969267 | 2011-04-26 | Outstanding Violations - No Viols Req'd | ||
1969427 | 2011-04-20 | Outstanding Violations - No Viols Req'd | ||
1969442 | 2011-04-21 | Outstanding Violations - No Viols Req'd | ||
1969443 | 2011-04-22 | Outstanding Violations - No Viols Req'd | ||
1969445 | 2011-04-23 | Outstanding Violations - No Viols Req'd | ||
1974257 | 2011-05-19 | No Violations Noted | ||
2060161 | 2012-04-11 | No Violations Noted | ||
2083540 | 2012-07-16 | Viol(s) Noted & Immediately Corrected | 644012 | |
2083540 | 2012-07-16 | Viol(s) Noted & Immediately Corrected | 644013 | |
2083540 | 2012-07-16 | Viol(s) Noted & Immediately Corrected | 644014 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 440.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-2 | PRODUCED FLUID | 2194.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2011-1 | DRILLING FLUID WASTE | 2039.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | PA |