Line 4: | Line 4: | ||
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.489791, -79.578666 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.489791, -79.578666 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Westmoreland County, Pennsylvania|Westmoreland]] |
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]] |
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[CNX GAS CO LLC|CNX GAS CO LLC]] |
|- | |- | ||
| Farm/Lease Name: HUTCHINSON 4D | | Farm/Lease Name: HUTCHINSON 4D |
Well ID: 129-28386 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.489791,"lon":-79.578666,"icon":""}]} |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Farm/Lease Name: HUTCHINSON 4D | |
First Permit Date: 2010-07-15 | |
Last Permit Date: 2010-07-15 | |
Spud Date: 2010-08-09 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.489791 | |
Longitude: -79.578666 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1926216 | 2010-11-05 | No Violations Noted | MARCELLUS - driling @ 1151ft/E&S ok/ID&pit ok | |
1930324 | 2010-11-10 | No Violations Noted | Decker Drilling rigging down and preparing to skid to Hutchinson 4J at time of inspection. Pits lined and freeboards maintained. No E/S control issues at site. Information per drillers log and cement tickets: 220' of 81.3 lb/ft 20" casing set in 24" hole and cemented with 250 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 17:30 11-03-10. 1111' of 54.5 lb/ft 13 3/8" casing set in 17 1/2" hole and cemented with 540 sacks of "A" containing 1% CACL2 & 1/4# flake (yield=1.18 cu ft/sk); tailed by 300 sacks of "A" containing 2% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 23:30 11-05-10. 2111' of 36 lb/ft 9 5/8" casing set in 12 3/8" hole and cemented with 290 sacks of Appalite 65/35 + 6% gel containing 2% CACL2 & 1/4# flake (yield=1.69 cu ft/sk); tailed by 300 sacks of "A" containing 2% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 06:02 11-08-10. | |
1944077 | 2011-01-19 | No Violations Noted | Moving in equipment in preparation for drilling lateral with Nabors rig M07 at time of inspection. Putting down containment liner and setting matting boards.
Met with Operator reps Tom Andreassi and Pete Nickel at site. Pits lined and freeboards maintained. No E/S control issues at site. Inspection conducted w/ OGI D. Catalano. |
|
1948430 | 2011-02-04 | No Violations Noted | Nabors Drilling rig M07 drilling-building curve at 7400' MD (8 3/4" hole) at time of inspection.
Closed loop system with Halliburton-Baroid 12.8 lb/gal synthetic mud being utilized. Pits lined and freeboards maintained. No E/S control issues at site. |
|
2125992 | 2012-12-27 | No Violations Noted | Well operating and properly identified.
Well equipped with production unit (separator, heater, meter). Well located on well pad containing (10) ten wells, (10) ten production units, and (10) ten produced fluids tanks. Well pad site reclaimed and vegetated. |
|
2067992 | 2012-05-15 | No Violations Noted | Site inspection the result of a reported brine water spill. The Operator notified the Department in compliance with policy. The Department notes that the spill was onto secondary containment surrounding the brine tank battery. The Operator indicated that the spill amount was less than 10 gallons. At the time of inspection the spill was cleaned up and was loaded into a lined lock top roll off dumpster. | |
2092869 | 2012-08-20 | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks located onsite appear to be in sound condition. At the time of inspection the site had been regraded, seeded, and mulched. The vegetation is growing nicely at this time but does not meet the 70% uniform vegetative criteria needed to complete restoration. During the inspection the department notes that the erosion and sedimentation plan was onsite and all BMPs were still installed as outline in the E&S plan. All BMPs appear to be in sound condition and functioning properly. No accelerated erosion or sedimentation observed in relation to the well pad or access road at the time of inspection. The department suggest the operator continue to monitor the site after significant precipitation events and weekly to ensure the integrity of the site is maintained. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 277959.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 461678.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 305867.0 | 74.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 76.51 | Bbl | INJECTION DISPOSAL WELL | 34-013-20609 | BUCKEYE UIC BARNESVILLE #1 (SWIW#2) - CNX GAS CO | BARNESVILLE | OH |
2012-2 | PRODUCED FLUID | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY - BLOSSBURG | BLOSSBURG | PA |
2012-2 | PRODUCED FLUID | 112.88 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2012-2 | PRODUCED FLUID | 247.26 | Bbl | INJECTION DISPOSAL WELL | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2012-2 | PRODUCED FLUID | 835.81 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2011-1 | DRILLING FLUID WASTE | 711.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-1 | FLOWBACK FRACTURING SAND | 17.12 | Tons | LANDFILL | 06-08438 | APEX SANITARY LANDFILL | AMSTERDAM | OH |
2012-1 | PRODUCED FLUID | 316.08 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2012-1 | PRODUCED FLUID | 343.98 | Bbl | INJECTION DISPOSAL WELL | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2012-1 | FRACING FLUID WASTE | 5313.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |