If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0444222303004 | | Well ID: 0444222303004 | ||
− | | style="height=100%; align=center" rowspan="14" | {{#display_map: 52. | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 52.800877, -113.090069 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/03-23-044-22W4/4 | | Location: 00/03-23-044-22W4/4 | ||
+ | |- | ||
+ | | Location Alias: 00/03-23-44-22 W4M | ||
+ | |- | ||
+ | | Location Alias 2: 00/03-23-044-22 W4/04 | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | County/Municipality: [[County of Wetaskiwin No. 10,_Alberta|County of Wetaskiwin No. 10]] | ||
|- | |- | ||
| Well Name: CNRL MALMO 3-23-44-22 | | Well Name: CNRL MALMO 3-23-44-22 | ||
+ | |- | ||
+ | | Operator Name: | ||
+ | |- | ||
+ | | License Number: 0005453 | ||
|- | |- | ||
| License Date: 1952-10-08 | | License Date: 1952-10-08 | ||
|- | |- | ||
− | | Final Drilling Date: 1952-11- | + | | License Status: Abandoned |
+ | |- | ||
+ | | Spud Date: 1952-10-24 | ||
+ | |- | ||
+ | | Final Drill Date: 1952-11-28 | ||
+ | |- | ||
+ | | Well Total Depth: 1611.5 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 52.800877 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -113.090069 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1952-12-01 | ||
+ | | Selective Bullet Perforation | ||
+ | | style="text-align: right;" | 1432.6 | ||
+ | | style="text-align: right;" | 1434.7 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1952-12-14 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1607.8 | ||
+ | | style="text-align: right;" | 1611.5 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1952-12-14 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1432.6 | ||
+ | | style="text-align: right;" | 1434.7 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1952-12-14 | ||
+ | | Bullet Perforation | ||
+ | | style="text-align: right;" | 1432.6 | ||
+ | | style="text-align: right;" | 1434.7 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1963-10-06 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1607.8 | ||
+ | | style="text-align: right;" | 1611.5 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1963-10-07 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1432.6 | ||
+ | | style="text-align: right;" | 1434.7 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1963-10-07 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1601.7 | ||
+ | | style="text-align: right;" | 1603.2 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1964-01-25 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1601.7 | ||
+ | | style="text-align: right;" | 1603.2 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1989-11-09 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1579 | ||
+ | | style="text-align: right;" | 1587 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1989-11-10 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1521 | ||
+ | | style="text-align: right;" | 1525 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1989-11-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1535 | ||
+ | | style="text-align: right;" | 1537 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1990-05-07 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1530 | ||
+ | | style="text-align: right;" | 1532 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1990-09-26 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1514.5 | ||
+ | | style="text-align: right;" | 1516 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1990-09-26 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1517.5 | ||
+ | | style="text-align: right;" | 1519 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1993-10-21 |
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1502 | ||
+ | | style="text-align: right;" | 1510 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1993-10-26 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1428 | ||
+ | | style="text-align: right;" | 1430 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 2006-06-02 |
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1412 | ||
+ | | style="text-align: right;" | 1420 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2006-06-02 |
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 1150.6 | ||
+ | | style="text-align: right;" | 1200 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2006-06-03 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 394 | ||
+ | | style="text-align: right;" | 397 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
+ | | 2006-06-03 | ||
+ | | Remedial Casing Cementing | ||
+ | | style="text-align: right;" | 394 | ||
+ | | style="text-align: right;" | 397 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2006-06-03 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 371 | ||
+ | | style="text-align: right;" | 386 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" | End Date | ||
+ | !scope="col" | Chemical Name | ||
+ | !scope="col" style="text-align: right;" | CAS Number | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" style="text-align: right;" | Job Percentage | ||
+ | !scope="col" | Supplier | ||
+ | |}--> | ||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 1993 | ||
+ | | style="text-align: right;" | 1145 | ||
+ | | style="text-align: right;" | 27.4 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 340.1 | ||
+ | |- | ||
+ | | 1994 | ||
+ | | style="text-align: right;" | 6533 | ||
+ | | style="text-align: right;" | 108.9 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 4562.3 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Well Production Data - All Alberta |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2018-04-24 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2018-05-14 }}</ref> |
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0444222303004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.800877,"lon":-113.090069,"icon":""}]} |
Location: 00/03-23-044-22W4/4 | |
Location Alias: 00/03-23-44-22 W4M | |
Location Alias 2: 00/03-23-044-22 W4/04 | |
Province: Alberta | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: CNRL MALMO 3-23-44-22 | |
Operator Name: | |
License Number: 0005453 | |
License Date: 1952-10-08 | |
License Status: Abandoned | |
Spud Date: 1952-10-24 | |
Final Drill Date: 1952-11-28 | |
Well Total Depth: 1611.5 m | |
Surface Hole Latitude: 52.800877 | |
Surface Hole Longitude: -113.090069 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-12-01 | Selective Bullet Perforation | 1432.6 | 1434.7 | 0 |
1952-12-14 | Open Hole/Barefoot Completion | 1607.8 | 1611.5 | 0 |
1952-12-14 | Perforation | 1432.6 | 1434.7 | 7 |
1952-12-14 | Bullet Perforation | 1432.6 | 1434.7 | 13 |
1963-10-06 | Cement Squeeze | 1607.8 | 1611.5 | 0 |
1963-10-07 | Cement Squeeze | 1432.6 | 1434.7 | 0 |
1963-10-07 | Perforation | 1601.7 | 1603.2 | 7 |
1964-01-25 | Acid Treatment | 1601.7 | 1603.2 | 0 |
1989-11-09 | Packing Device Capped w/Cement | 1579 | 1587 | 0 |
1989-11-10 | Perforation | 1521 | 1525 | 13 |
1989-11-27 | Perforation | 1535 | 1537 | 13 |
1990-05-07 | Packing Device Capped w/Cement | 1530 | 1532 | 0 |
1990-09-26 | Perforation | 1514.5 | 1516 | 13 |
1990-09-26 | Perforation | 1517.5 | 1519 | 13 |
1993-10-21 | Packing Device Capped w/Cement | 1502 | 1510 | 0 |
1993-10-26 | Perforation | 1428 | 1430 | 13 |
2006-06-02 | Packing Device Capped w/Cement | 1412 | 1420 | 0 |
2006-06-02 | Cement Plug | 1150.6 | 1200 | 0 |
2006-06-03 | Perforation | 394 | 397 | 13 |
2006-06-03 | Remedial Casing Cementing | 394 | 397 | 0 |
2006-06-03 | Packing Device Capped w/Cement | 371 | 386 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 1145 | 27.4 | 0.0 | 340.1 |
1994 | 6533 | 108.9 | 0.0 | 4562.3 |
For data sources see[4]