X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0494010516000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0494010516000
 
| Well ID: 0494010516000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.20439500000003363, -110.1044109999999705 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.204395, -110.104411 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-05-049-01W4/0
 
| Location: 00/16-05-049-01W4/0
 +
|-
 +
| Location Alias: 00/16-05-49-01 W4M
 +
|-
 +
| Location Alias 2: 00/16-05-049-01 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 049
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 01
 +
|-
 +
| Section: 05
 +
|-
 +
| County/Municipality: [[County of Vermilion River,_Alberta|County of Vermilion River]]
 
|-
 
|-
 
| Well Name: CREW LLOYD 16-5-49-1
 
| Well Name: CREW LLOYD 16-5-49-1
 +
|-
 +
| Operator Name: [[Crew Energy Inc.]]
 +
|-
 +
| License Number: 0270311
 
|-
 
|-
 
| License Date: 2002-05-27
 
| License Date: 2002-05-27
 
|-
 
|-
| Final Drilling Date: 2002-06-12
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 2002-06-10
 +
|-
 +
| Final Drill Date: 2002-06-12
 +
|-
 +
| Well Total Depth: 670.00 m
 +
|-
 +
| Surface Hole Latitude: 53.204395
 +
|-
 +
| Surface Hole Longitude: -110.104411
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2002-05-27
 +
| Obtained License
 +
|-
 +
| 2002-06-11
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2002-06-12
 +
| Finished Drilling
 +
|-
 +
| 2002-06-12
 +
| Well Log Performed
 +
|-
 +
| 2002-06-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 2002-06-14
 +
| Production Casing Operation Performed
 +
|-
 +
| 2002-06-14
 +
| Rig Released
 +
|-
 +
| 2002-06-14
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2002-06-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-06-25
 +
| Well Began Production
 +
|-
 +
| 2002-06-25
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2002-06-25
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2003-08-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2003-08-01
 +
| Well Mode changed to Suspended
 
|-
 
|-
| Total Depth: 670.0m
+
| 2003-10-02
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2003-10-02
 +
| Well Log Performed
 
|-
 
|-
| Status: Abandoned Zone
+
| 2003-10-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Well Type: Not Applicable
+
| 2003-10-03
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Configuration: Vertical
+
| 2003-10-03
 +
| Plug Back Performed
 
|-
 
|-
| Latitude: 53.20439500000003363
+
| 2003-10-03
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2003-10-03
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2006-03-03
 +
| Perforation Treatment Performed - Bridge Plug No Cement Required
 +
|-
 +
| 2006-03-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Longitude: -110.1044109999999705
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2002-06-25
 +
| Perforation
 +
| style="text-align: right;" | 642.00
 +
| style="text-align: right;" | 644.00
 +
| style="text-align: right;" | 26
 +
|-
 +
| 2002-06-25
 +
| Perforation
 +
| style="text-align: right;" | 646.00
 +
| style="text-align: right;" | 649.00
 +
| style="text-align: right;" | 26
 +
|-
 +
| 2003-10-02
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 629.00
 +
| style="text-align: right;" | 637.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-10-03
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 619.00
 +
| style="text-align: right;" | 627.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-10-03
 +
| Perforation
 +
| style="text-align: right;" | 607.00
 +
| style="text-align: right;" | 608.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-03-03
 +
| Bridge Plug, No Cement
 +
| style="text-align: right;" | 602.00
 +
| style="text-align: right;" | 605.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-03-03
 +
| Perforation
 +
| style="text-align: right;" | 594.50
 +
| style="text-align: right;" | 598.00
 +
| style="text-align: right;" | 17
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2002
 +
| style="text-align: right;" | 432
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2017-10-19
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 05:53, 11 July 2020

Well Details

Well ID: 0494010516000
Loading map...
Location: 00/16-05-049-01W4/0
Location Alias: 00/16-05-49-01 W4M
Location Alias 2: 00/16-05-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 05
County/Municipality: County of Vermilion River
Well Name: CREW LLOYD 16-5-49-1
Operator Name: Crew Energy Inc.
License Number: 0270311
License Date: 2002-05-27
License Status: Suspension
Spud Date: 2002-06-10
Final Drill Date: 2002-06-12
Well Total Depth: 670.00 m
Surface Hole Latitude: 53.204395
Surface Hole Longitude: -110.104411

For data sources see[1][2]

Well History

Date Event
2002-05-27 Obtained License
2002-06-11 Surface Casing Operation Performed
2002-06-12 Finished Drilling
2002-06-12 Well Log Performed
2002-06-13 Drill Stem Test Performed
2002-06-14 Production Casing Operation Performed
2002-06-14 Rig Released
2002-06-14 Well Mode changed to Drilled and Cased
2002-06-25 Perforation Treatment Performed - Jet Perforation
2002-06-25 Well Began Production
2002-06-25 Well Fluid changed to Crude Oil
2002-06-25 Well Mode changed to Pumping
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Suspended
2003-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-02 Well Log Performed
2003-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-03 Perforation Treatment Performed - Jet Perforation
2003-10-03 Plug Back Performed
2003-10-03 Well Fluid changed to Crude Oil
2003-10-03 Well Mode changed to Abandoned Zone
2006-03-03 Perforation Treatment Performed - Bridge Plug No Cement Required
2006-03-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-25 Perforation 642.00 644.00 26
2002-06-25 Perforation 646.00 649.00 26
2003-10-02 Packing Device Capped w/Cement 629.00 637.00 0
2003-10-03 Packing Device Capped w/Cement 619.00 627.00 0
2003-10-03 Perforation 607.00 608.00 17
2006-03-03 Bridge Plug, No Cement 602.00 605.00 0
2006-03-03 Perforation 594.50 598.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 432 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References