X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30292"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30292
 
| Well ID: 37-005-30292
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.013403, -79.671564 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.013403, -79.671564 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 02/25/2010
+
| Spud Date: 2010-02-25
 
|-
 
|-
| Permit Date: 3/23/2009
+
| Permit Date: 2009-03-23
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 86:
 
|-
 
|-
 
| 2008
 
| 2008
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 94: Line 119:
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 103: Line 128:
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 112: Line 137:
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 119: Line 144:
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 137: Line 162:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 146: Line 171:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 155: Line 180:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 169: Line 194:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 174: Line 200:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 42.00 Bbl
 
| style="text-align: right;" | 42.00 Bbl
Line 180: Line 207:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2012-0
+
| 2012
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 123.00 Bbl
 
| style="text-align: right;" | 123.00 Bbl
Line 186: Line 214:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2013-0
+
| 2013
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 10.00 Bbl
+
| style="text-align: right;" | 86.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
| PA0020346
+
| PA0028428
 
|-
 
|-
| 2013-0
+
| 2013
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 86.00 Bbl
+
| style="text-align: right;" | 10.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
| PA0028428
+
| PA0020346
 
|-
 
|-
| 2014-0
+
| 2014
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 35.00 Bbl
 
| style="text-align: right;" | 35.00 Bbl
Line 204: Line 235:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2016-0
+
| 2016
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
Line 210: Line 242:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2017-0
+
| 2017
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.00 Bbl
 
| style="text-align: right;" | 15.00 Bbl
Line 216: Line 249:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2017-0
+
| 2017
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 67.50 Bbl
 
| style="text-align: right;" | 67.50 Bbl
Line 222: Line 256:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2018-0
+
| 2018
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 29.00 Bbl
 
| style="text-align: right;" | 29.00 Bbl
Line 228: Line 263:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2018-0
+
| 2018
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 42.00 Bbl
 
| style="text-align: right;" | 42.00 Bbl
Line 253: Line 289:
 
| 1867311
 
| 1867311
 
| Primary Facility
 
| Primary Facility
| 02/25/2010
+
| 2010-02-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 260: Line 296:
 
| 1868714
 
| 1868714
 
| Primary Facility
 
| Primary Facility
| 03/02/2010
+
| 2010-03-02
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 267: Line 303:
 
| 1883735
 
| 1883735
 
| Primary Facility
 
| Primary Facility
| 05/04/2010
+
| 2010-05-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 274: Line 310:
 
| 1884353
 
| 1884353
 
| Primary Facility
 
| Primary Facility
| 05/07/2010
+
| 2010-05-07
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 281: Line 317:
 
| 1889922
 
| 1889922
 
| Primary Facility
 
| Primary Facility
| 06/03/2010
+
| 2010-06-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 323: Line 359:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 05:19, 20 August 2019

Well Details

Well ID: 37-005-30292
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Perry Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: JOHN W EVANKOVICH 1
License Status: Active
Spud Date: 2010-02-25
Permit Date: 2009-03-23
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.013403
Longitude: -79.671564

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 91.04 365 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 527.18 304 21.00 304 0.00 0
2012 DANNIC ENERGY CORP 681.11 305 197.82 305 0.00 0
2013 DANNIC ENERGY CORP 739.38 304 79.03 304 0.00 0
2014 DANNIC ENERGY CORP 486.00 304 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 401.84 365 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 360.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 382.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 261.43 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 DANNIC ENERGY CORP Produced Fluid (in Barrels) 42.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2012 DANNIC ENERGY CORP Produced Fluid (in Barrels) 123.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2013 DANNIC ENERGY CORP Produced Fluid (in Barrels) 86.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2013 DANNIC ENERGY CORP Produced Fluid (in Barrels) 10.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2014 DANNIC ENERGY CORP Produced Fluid (in Barrels) 35.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid (in Barrels) RWC 802 45.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2017 DANNIC ENERGY CORP Produced Fluid (in Barrels) RWC 802 15.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 DANNIC ENERGY CORP Produced Fluid (in Barrels) RWC 802 67.50 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2018 DANNIC ENERGY CORP Produced Fluid (in Barrels) RWC 802 29.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2018 DANNIC ENERGY CORP Produced Fluid (in Barrels) RWC 802 42.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1867311 Primary Facility 2010-02-25 Drilling/Alteration No Violations Noted drilling - conductor installed/E&S ok/ID&pit ok
1868714 Primary Facility 2010-03-02 Drilling/Alteration No Violations Noted drilling - 7" cemented/E&S ok/ID&pit ok
1883735 Primary Facility 2010-05-04 Drilling/Alteration No Violations Noted drilling/E&S ok/ID&pit ok
1884353 Primary Facility 2010-05-07 Drilling/Alteration No Violations Noted drilling/E&S ok/ID&pit ok
1889922 Primary Facility 2010-06-03 Routine/Complete Inspection No Violations Noted Well drilled, but not equipped. Site ID sign and E&S plan located. The pit is still on-site and appears to be in sound condition. There is currently no evidence of accelerated erosion and sedimentation on the well site or the access road.
2575518 Primary Facility 2017-03-27 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[6]

References