X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20156"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-131-20156
 
| Well ID: 37-131-20156
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.640783, -75.811003 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.640783, -75.811003 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Plugged OG Well
 
| License Status: Plugged OG Well
 
|-
 
|-
| Spud Date: 03/28/2011
+
| Spud Date: 2011-03-28
 
|-
 
|-
| Permit Date: 3/22/2011
+
| Permit Date: 2011-03-22
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 253: Line 278:
 
| 1960667
 
| 1960667
 
| Primary Facility
 
| Primary Facility
| 03/28/2011
+
| 2011-03-28
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 260: Line 285:
 
| 1965039
 
| 1965039
 
| Primary Facility
 
| Primary Facility
| 04/11/2011
+
| 2011-04-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 267: Line 292:
 
| 1965671
 
| 1965671
 
| Primary Facility
 
| Primary Facility
| 04/14/2011
+
| 2011-04-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 274: Line 299:
 
| 1968964
 
| 1968964
 
| Primary Facility
 
| Primary Facility
| 04/28/2011
+
| 2011-04-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 281: Line 306:
 
| 1969661
 
| 1969661
 
| Primary Facility
 
| Primary Facility
| 05/02/2011
+
| 2011-05-02
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 288: Line 313:
 
| 1990412
 
| 1990412
 
| Primary Facility
 
| Primary Facility
| 07/25/2011
+
| 2011-07-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 295: Line 320:
 
| 1996398
 
| 1996398
 
| Primary Facility
 
| Primary Facility
| 08/17/2011
+
| 2011-08-17
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 302: Line 327:
 
| 1997192
 
| 1997192
 
| Primary Facility
 
| Primary Facility
| 08/19/2011
+
| 2011-08-19
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 309: Line 334:
 
| 2026320
 
| 2026320
 
| Primary Facility
 
| Primary Facility
| 12/09/2011
+
| 2011-12-09
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 316: Line 341:
 
| 2029279
 
| 2029279
 
| Primary Facility
 
| Primary Facility
| 12/15/2011
+
| 2011-12-15
 
| Complaint Inspection
 
| Complaint Inspection
 
| Pending
 
| Pending
Line 323: Line 348:
 
| 2029283
 
| 2029283
 
| Primary Facility
 
| Primary Facility
| 12/19/2011
+
| 2011-12-19
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 330: Line 355:
 
| 2029309
 
| 2029309
 
| Primary Facility
 
| Primary Facility
| 12/22/2011
+
| 2011-12-22
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 337: Line 362:
 
| 2029315
 
| 2029315
 
| Primary Facility
 
| Primary Facility
| 12/15/2011
+
| 2011-12-15
 
| Complaint Inspection
 
| Complaint Inspection
 
| Pending
 
| Pending
Line 344: Line 369:
 
| 2051382
 
| 2051382
 
| Primary Facility
 
| Primary Facility
| 03/15/2012
+
| 2012-03-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 351: Line 376:
 
| 2062407
 
| 2062407
 
| Primary Facility
 
| Primary Facility
| 04/12/2012
+
| 2012-04-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 358: Line 383:
 
| 2062431
 
| 2062431
 
| Primary Facility
 
| Primary Facility
| 03/27/2012
+
| 2012-03-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 365: Line 390:
 
| 2064974
 
| 2064974
 
| Primary Facility
 
| Primary Facility
| 04/27/2012
+
| 2012-04-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 372: Line 397:
 
| 2067568
 
| 2067568
 
| Primary Facility
 
| Primary Facility
| 05/14/2012
+
| 2012-05-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 379: Line 404:
 
| 2078711
 
| 2078711
 
| Primary Facility
 
| Primary Facility
| 06/18/2012
+
| 2012-06-18
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 386: Line 411:
 
| 2084516
 
| 2084516
 
| Primary Facility
 
| Primary Facility
| 07/18/2012
+
| 2012-07-18
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 393: Line 418:
 
| 2086703
 
| 2086703
 
| Primary Facility
 
| Primary Facility
| 07/24/2012
+
| 2012-07-24
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 400: Line 425:
 
| 2087775
 
| 2087775
 
| Primary Facility
 
| Primary Facility
| 07/30/2012
+
| 2012-07-30
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 407: Line 432:
 
| 2097253
 
| 2097253
 
| Primary Facility
 
| Primary Facility
| 08/30/2012
+
| 2012-08-30
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 414: Line 439:
 
| 2102755
 
| 2102755
 
| Primary Facility
 
| Primary Facility
| 09/14/2012
+
| 2012-09-14
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 421: Line 446:
 
| 2133525
 
| 2133525
 
| Primary Facility
 
| Primary Facility
| 01/15/2013
+
| 2013-01-15
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 428: Line 453:
 
| 2137296
 
| 2137296
 
| Primary Facility
 
| Primary Facility
| 01/25/2013
+
| 2013-01-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 435: Line 460:
 
| 2137302
 
| 2137302
 
| Primary Facility
 
| Primary Facility
| 01/23/2013
+
| 2013-01-23
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 442: Line 467:
 
| 2141567
 
| 2141567
 
| Primary Facility
 
| Primary Facility
| 01/18/2013
+
| 2013-01-18
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 449: Line 474:
 
| 2143342
 
| 2143342
 
| Primary Facility
 
| Primary Facility
| 02/25/2013
+
| 2013-02-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 456: Line 481:
 
| 2147002
 
| 2147002
 
| Primary Facility
 
| Primary Facility
| 03/11/2013
+
| 2013-03-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 463: Line 488:
 
| 2151160
 
| 2151160
 
| Primary Facility
 
| Primary Facility
| 03/21/2013
+
| 2013-03-21
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 470: Line 495:
 
| 2155760
 
| 2155760
 
| Primary Facility
 
| Primary Facility
| 04/08/2013
+
| 2013-04-08
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 477: Line 502:
 
| 2156005
 
| 2156005
 
| Primary Facility
 
| Primary Facility
| 04/08/2013
+
| 2013-04-08
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 484: Line 509:
 
| 2160652
 
| 2160652
 
| Primary Facility
 
| Primary Facility
| 04/16/2013
+
| 2013-04-16
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 491: Line 516:
 
| 2161808
 
| 2161808
 
| Primary Facility
 
| Primary Facility
| 04/22/2013
+
| 2013-04-22
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 498: Line 523:
 
| 2175531
 
| 2175531
 
| Primary Facility
 
| Primary Facility
| 06/11/2013
+
| 2013-06-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 505: Line 530:
 
| 2199477
 
| 2199477
 
| Primary Facility
 
| Primary Facility
| 08/14/2013
+
| 2013-08-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 512: Line 537:
 
| 2213501
 
| 2213501
 
| Primary Facility
 
| Primary Facility
| 10/01/2013
+
| 2013-10-01
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 519: Line 544:
 
| 2244214
 
| 2244214
 
| Primary Facility
 
| Primary Facility
| 02/07/2013
+
| 2013-02-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 526: Line 551:
 
| 2262545
 
| 2262545
 
| Primary Facility
 
| Primary Facility
| 04/08/2014
+
| 2014-04-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 533: Line 558:
 
| 2262564
 
| 2262564
 
| Primary Facility
 
| Primary Facility
| 04/11/2014
+
| 2014-04-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 540: Line 565:
 
| 2262576
 
| 2262576
 
| Primary Facility
 
| Primary Facility
| 04/09/2014
+
| 2014-04-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 547: Line 572:
 
| 2321162
 
| 2321162
 
| Primary Facility
 
| Primary Facility
| 11/04/2014
+
| 2014-11-04
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 554: Line 579:
 
| 2397825
 
| 2397825
 
| Primary Facility
 
| Primary Facility
| 08/10/2015
+
| 2015-08-10
 
| Plugging(Includes Plugged/Mined Through)
 
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
Line 561: Line 586:
 
| 2415326
 
| 2415326
 
| Primary Facility
 
| Primary Facility
| 10/13/2015
+
| 2015-10-13
 
| Plugging(Includes Plugged/Mined Through)
 
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
Line 639: Line 664:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 16:13, 1 August 2019

Well Details

Well ID: 37-131-20156
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Nicholson Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 149079
Farm/Lease Name: POLOVITCH UNIT 1H
License Status: Plugged OG Well
Spud Date: 2011-03-28
Permit Date: 2011-03-22
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.640783
Longitude: -75.811003

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHIEF OIL & GAS LLC 101,239.00 63 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 399,032.47 366 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 343,569.00 230 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 116,171.00 202 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-S01 Drill Cuttings (in Tons) 1,143.30 Tons LANDFILL 100955
2011-S01 Drill Cuttings (in Tons) 659.38 Tons LANDFILL 301626
2011-S01 Fracing Fluid Waste (in Barrels) 357.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011-S02 Drill Cuttings (in Tons) 1,272.61 Tons LANDFILL 301626
2011-S02 Fracing Fluid Waste (in Barrels) 3,130.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Produced Fluid (in Barrels) 1,722.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 656.30 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 639.40 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2013-S02 Produced Fluid (in Barrels) 455.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 429.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014-S01 Produced Fluid (in Barrels) 292.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 202.50 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 46.47 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Fracturing Fluid Waste (in Barrels) RWC 805 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2018-M06 Spent Lubricant Waste (in Barrels) RWC 809 12.81 Bbl LANDFILL 301358

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1960667 Primary Facility 2011-03-28 Drilling/Alteration No Violations Noted big rig- probably Thurs, still laying plastic, etc,getting ready to spud, have permit on site
1965039 Primary Facility 2011-04-11 Drilling/Alteration No Violations Noted AT 1823' drilling to 1825' then set csg and cement- probably tonight, using Universal
1965671 Primary Facility 2011-04-14 Drilling/Alteration No Violations Noted UDI Rig 58
1968964 Primary Facility 2011-04-28 Routine/Complete Inspection No Violations Noted UDI 58
1969661 Primary Facility 2011-05-02 Drilling/Alteration No Violations Noted 5 1/2" csg set @ 10026' with 1180 sx cement report attached
1990412 Primary Facility 2011-07-25 Routine/Complete Inspection No Violations Noted All 3 annuli have a vent pipe running to a frac tank.
1996398 Primary Facility 2011-08-17 Drilling/Alteration No Violations Noted Comp. Man - Max Lee, Fracing, hoping to get started this afternoon. Planning 5 stages - BJ. Need to get permits on site.
1997192 Primary Facility 2011-08-19 Drilling/Alteration No Violations Noted fracing, on stage 1 of 5 - just finished as I got here.
2026320 Primary Facility 2011-12-09 Complaint Inspection No Violations Noted Well is in production - 1076 psi.
2029279 Primary Facility 2011-12-15 Complaint Inspection Pending On site with Eric Rooney to gather isotopic samples from annuli. Chief O&G reps on site -Rich Adams, Ralph Larson, and Jon Hafer. There are 3 annular vents, but cellar is filled in. Cellar will be dug out to confirm which annulus the vents go to.
2029283 Primary Facility 2011-12-19 Follow-up Inspection Violation(s) Noted On site with Kevin Costello. Met Rich Adams and Jon Hafer, Chief reps. Cellar has been dug up to determine which annuli the vents go to.
2029309 Primary Facility 2011-12-22 Follow-up Inspection Outstanding Violations - No Viols Req'd Onsite to take flow readings on csg annuli. Met w/ Ralph Larsen and Jon Hafer / Cheif Reps. Used the 1/4" plate on our oriface meter.
2029315 Primary Facility 2011-12-15 Complaint Inspection Pending On site w/ Eric Rooney to gather isotopic samples from annuli. Also on site are Rich Adams, Ralph Larson, And Jon Hafer representing Chief Oil. There are 3 annular vents, but cellar is filled in. Will be dug out to confirm annuli.
2051382 Primary Facility 2012-03-15 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Cellar dug out, small amount of water, no bubbles.
2062407 Primary Facility 2012-04-12 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well. Cellar is dug out, small amount of water present, no bubbles.
2062431 Primary Facility 2012-03-27 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing. Cellar dug out, some water, no bubbles, 3 vents from csg annuli.
2064974 Primary Facility 2012-04-27 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Pressure recording devices have been installed on each of 3 annulus vents. Vents are shut in: 1150psi prod
2067568 Primary Facility 2012-05-14 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well. 3 annular vents - shut in with pressure and temp. recording device installed and press guages. Pressures are: 5 1/2" X 9 5/8" = 60 psi
2078711 Primary Facility 2012-06-18 Follow-up Inspection Outstanding Violations - No Viols Req'd Concrete barriers have been placed around well heads. The cellar is dug out w/ water - no bubbles.
2084516 Primary Facility 2012-07-18 Follow-up Inspection Outstanding Violations - No Viols Req'd Cellars are dug out. No water to 1/2" present. No changes since last inspection on 7/9/2012.
2086703 Primary Facility 2012-07-24 Follow-up Inspection Outstanding Violations - No Viols Req'd No change since last insp. Some water in cellar - no bubbles. 3 annular vents - all open, vented.
2087775 Primary Facility 2012-07-30 Follow-up Inspection Outstanding Violations - No Viols Req'd Producing well. Has 3 annular vents, open. Clean water in cellar, no bubbles.
2097253 Primary Facility 2012-08-30 Follow-up Inspection Outstanding Violations - No Viols Req'd On site w/ Kevin Costello(DEP), Ralph Larsen (Chief) & Jon Hafer(Chief consult.) to witness flow tests and pressure tests on annuli. Shut in all 3 annuli(20 x 13 3/8", 13 3/8 x 9 5/8", and 9 5/8 x 5 1/2") for 20 min. All pressures are 0 psi. Did not install orifice meter, flow is zero.
2102755 Primary Facility 2012-09-14 Follow-up Inspection Outstanding Violations - No Viols Req'd Cellar is dug out. Very small amount of water - no bubbles, 3 annular vents. Pressure guage on 9 5/8 x 5 1/2" annulus but all annuli are open, venting to tank. Producing well.
2133525 Primary Facility 2013-01-15 Drilling/Alteration Outstanding Violations - No Viols Req'd Company Man is Max Lee. IPS (was Warrior) coil tbg unit on site. Moved in yesterdeay. Had a problem with a valve when rigging up, held them up. Encountered an obstruction at 15'. Will try to push, or drill out if need, clean out hole before setting CIBP @ 7200'. Plastic containment is down, good. Will prob. finish cleaning out hole and setting plug and filling on Thurs.
2137296 Primary Facility 2013-01-25 Drilling/Alteration Outstanding Violations - No Viols Req'd CDK Wireline is rigging down and moving out. On the 23 rd, log was run w/ the 4H open, producing. Noise increased as logged up the hole. Shut in the 4H and ran noise again from about 4200' to surf w/ same results. Gary from GWB consulting (not on site) suspended logs. The annuli on 1H were shut in prior to logging, he wants them shut in for about 1 month so everything equalizes. Need to call Rich Adams Monday.
2137302 Primary Facility 2013-01-23 Drilling/Alteration Outstanding Violations - No Viols Req'd Here for noise and temp logging. CDK logging. 5 1/2" has 0 psi and is full of fluid.
2141567 Primary Facility 2013-01-18 Drilling/Alteration Outstanding Violations - No Viols Req'd Coil tbg rig has moved off site. No comp man present.
2143342 Primary Facility 2013-02-25 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Pressure guages and recorders on 5 1/2 and 9 5/8" annuli.
2147002 Primary Facility 2013-03-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd 3 vents are all shut in.
2151160 Primary Facility 2013-03-21 Follow-up Inspection Outstanding Violations - No Viols Req'd Conditions on pad same as last inspection.
2155760 Primary Facility 2013-04-08 Follow-up Inspection Outstanding Violations - No Viols Req'd Water in cellar. 3 annuli are still shut w/ pressure recorders & guages on 5 1/2 x 9 5/8" and 9 5/8 x 13 3/8".
2156005 Primary Facility 2013-04-08 Follow-up Inspection Outstanding Violations - No Viols Req'd 3 annuli are still shut in w/ pressure recorders and guages. 5X 9 = 32 psi and 9 x 13 = 9.5 psi
2160652 Primary Facility 2013-04-16 Drilling/Alteration No Violations Noted rigging to log
2161808 Primary Facility 2013-04-22 Follow-up Inspection Outstanding Violations - No Viols Req'd Annular vents are all open. Other wells on pad also have vents open.
2175531 Primary Facility 2013-06-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Prod well. 814 psi 3 annular vents - open.
2199477 Primary Facility 2013-08-14 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Producing well.
2213501 Primary Facility 2013-10-01 Follow-up Inspection Outstanding Violations - No Viols Req'd On sitew w/ Eric Rooney, DEP and Jon Hafer, Chief, to collect isotopic samples from various annuli. Shut in for 17+ hours, since about 4:30PM yesterday.
2244214 Primary Facility 2013-02-07 Routine/Complete Inspection Outstanding Violations - No Viols Req'd No activity.
2262545 Primary Facility 2014-04-08 Drilling/Alteration Outstanding Violations - No Viols Req'd Team rig 211, Comp Man - Chris Roberts, Floyd Roberts
2262564 Primary Facility 2014-04-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd No activity.
2262576 Primary Facility 2014-04-09 Drilling/Alteration Outstanding Violations - No Viols Req'd Comp Man - Floyd Roberts
2321162 Primary Facility 2014-11-04 Follow-up Inspection Outstanding Violations - No Viols Req'd Related to 12/19/2011 Inspection ID # 2029283.
2397825 Primary Facility 2015-08-10 Plugging(Includes Plugged/Mined Through) No Violations Noted
2415326 Primary Facility 2015-10-13 Plugging(Includes Plugged/Mined Through) No Violations Noted At time of inspection, arrived on site at 12:30 p.m., met with company man Floyd Roberts, Team Services LLC rig was running 2" drill pipe. The 9 casing was perforated from 1020'-1030', they attempted to inject into the perforations but pressured up to 1000psi and held for fifteen minutes. They will run a balanced plug from 900'-1130' pull out of the hole and put 500psi on the 9 casing until tomorrow morning, then they will tag cement. Universal is on site to run the cement plug, they will run 80sks of Class A Type 1 cement at 15.4lbs. I took a walk around the location, everything looked OK.
2670034 Primary Facility 2017-12-11 Follow-up Inspection No Violations Noted There was no activity occurring at the site at the time of the inspection. I was accompanied by Jon Sassi (EPS) and consulted with Ken Kennedy (OGI). There were no violations notes pertaining to this well. If you have any questions, please contact me.
2701538 Primary Facility 2018-02-22 Compliance Evaluation In Compliance with Schedule Arrived onsite at 15:15. Onsite to check on progress of re plumbing of all (4) wells annular vents to surface in preparation for long term venting phase as discussed and agreed to in the Depts. meeting with Chief O&G of 2/14/18. All (4) wells, the Polovitch 1H, 1V, 4H and 5H, have had their (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) annular vents plumbed to surface via 2" vents. Vents had been fitted with ball valves and Tees w/ needle valves to access vents for sampling and eventual PBUTs. The Dept. will be meeting Chief O&G Rep., Jon Hafer back at pad tomorrow morning at 09:30 to obtain gas samples off all annuli, where gas is present, for Isotopic analysis. Chief O&G has had all annular spaces and vents purged of fluid and were shut in earlier today in preparation for tomorrows sampling event. (See attached, "As Plugged" Well Bore Schematics for individual wells for plugging details as of 2/14/18). All previous, deteriorated pad liner and debris have been removed from location. Location was fou
2701763 Primary Facility 2018-02-23 Compliance Evaluation In Compliance with Schedule Arrived onsite at 09:00. Upon arrival met up with Chief O&G Rep., Jonathan Hafer and D.E.P. Geologist, Eric Rooney. Onsite to initiate the 1st long term, approx. 90 day, venting period as agreed to in meeting of 2/14/18 with Chief O&G. All (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) were re-plumbed to surface and shut-in yesterday in preparation for todays sampling. Mr. Hafer explained that he would be taking gas samples off all the wells annular vents to send off for analysis. Following Mr. Hafers collection of annuli samples, I performed gas screenings at all (4) wells annuli using a ALTAIR 5X gas meter calibrated on 2/5/18. Gas was detected at the following wells annuli:

1H: (13 x 9) = 100% LEL, 100% CH4, 4H: (13 x 9) = 100 % LEL, 30 % CH4, 5H: (13 x 9) = 100 % LEL, 8 % CH4, Following sample collection and gas screenings, all (4) wells annuli were opened to vent to atmosphere. This long term venting period will extend for ~ 90 days. Operator will then be performing

2775957 Primary Facility 2018-08-31 Compliance Evaluation In Compliance with Schedule Arrived onsite at 11:00. Upon arrival met with Chief O&G Rep., Jonathan Hafer to conclude the 7 day PBUTs being performed on all (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB). This is the 2nd PBUT being performed after (2) full 90 day, long term venting periods. Pre-shut in test gas screenings were performed at all wells annular vents on 8/24/18 by Mr. Hafer using a Rae Systems Multi-Rae gas meter, calibrated that morning. The only annuli where gas was detected are listed below:

1H: (13x9) = 3.1% CH4, 51% LEL 1V: (9/WB) = 1.6% CH4, 36% LEL 4H: (13x9) = 1.9% CH4, 70% LEL 5H: (13x9) = 6.6% CH4, 100% LEL

Today, the ending 7 day PBUT results were: 1H: (20x13)= 0.40 psi, (13x9)= 12.95 psi, (9/WB)= 0.44 psi. 1V: (20x13)= -0.10 psi, (13x9)= -2.0 psi, (9/WB)= 0.45 psi. 4H: (20x13)= 0.10 psi, (13x9)= 11.10 psi, (9/WB)= 0.70 psi. 5H: (20x13)= 0.65 psi, (13x9)= 5.2 psi, (9/WB)= 0.75psi. - Mr. Hafer explained that he would be collecting samples off all the wells annular vents to sen

For data sources see[6]

References