If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2012-11-29 |
|- | |- | ||
| Spud Date: 2012-11-29 | | Spud Date: 2012-11-29 |
Well ID: 34-121-24385 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.723994113,"lon":-81.5383347,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Olive Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: SCHLEAPPI | |
License Status: Producing | |
License Date: 2012-11-29 | |
Spud Date: 2012-11-29 | |
Spud Drilling Contractor: FMS DRILLING | |
Final Drill Date: 2012-12-06 | |
Well Total Depth: 3983 ft | |
Configuration: Vertical | |
Latitude: 39.723994113 | |
Longitude: -81.53833470 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-10-23 | Proposed Formations:DEVONIAN SHALE, Issued Date:10/23/2012, Expired Date:10/23/2014 12:00:00 PM, Drilling unit acres:39.25, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2012-11-29 | Proposed Formations:DEVONIAN SHALE, Issued Date:11/29/2012, Expired Date:11/29/2014 12:00:00 PM, Drilling unit acres:39.25, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-12-06 | |
Completion Report Received | 2013-10-17 | |
Record Last Modified | 2014-07-30 | |
Construction Permit Expires | 2014-11-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-10-28 | 3032 | 3865 | 107 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-06-12 | H2O | 8 | 6983 Bbl | 80000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | NORTHWOOD ENERGY CORP | 0 | 0 | 0 |
2013 | NORTHWOOD ENERGY CORP | 313 | 149 | 98 |
2014 | NORTHWOOD ENERGY CORP | 1230 | 1244 | 365 |
2015 | NORTHWOOD ENERGY CORP | 4292 | 1058 | 365 |
2016 | NORTHWOOD ENERGY CORP | 3882 | 225 | 365 |
2017 | NORTHWOOD ENERGY CORP | 1806 | 170 | 365 |
2018 | NORTHWOOD ENERGY CORP | 1293 | 61 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | NORTHWOOD ENERGY CORP | Brine | 0 | 0 |
2013 | NORTHWOOD ENERGY CORP | Brine | 695 | 98 |
2014 | NORTHWOOD ENERGY CORP | Brine | 10 | 365 |
2015 | NORTHWOOD ENERGY CORP | Brine | 592 | 365 |
2016 | NORTHWOOD ENERGY CORP | Brine | 322 | 365 |
2017 | NORTHWOOD ENERGY CORP | Brine | 80 | 365 |
2018 | NORTHWOOD ENERGY CORP | Brine | 46 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0779317868 | 2012-11-29 | Drill / Deepen / Reopen | No Violations | I stopped at the location today to see if the drilling contractor has started to move equipment on site. The new drilling permit has not been issued yet. I called Steve Opritza to see if the new permit has been issued yet. |
0917955035 | 2015-09-24 | Preliminary Restoration | No Violations | I am accompanied on my inspection today by Inspector Sefcik, our inspection finds the well is equipped with a pumping unit. The tank battery is comprised of one 210 barrel tank, one 100 barrel tank and a horizontal separator. The well site meets the preliminary restoration requirements of 1509:072(A). |
1674737183 | 2016-06-06 | Production Wells | No Violations | My inspection today finds the well is equipped with a pumping unit. The tank battery consists of one 210 barrel tank, one 100 barrel tank, and a production unit. A domestic gas meter is set at the production unit. The production equipment is located in an earthen dike. |
For data sources see[9]