X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-123-43441"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-123-43441
 
| Well ID: 37-123-43441
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.887061, -79.398907 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.887061, -79.398907 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: WRIGHT 1
 
| Farm/Lease Name: WRIGHT 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2003-08-03
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2003-07-30
 
| Permit Date: 2003-07-30
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.887061
 
| Latitude: 41.887061
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2003-07-30
 +
| New Permit Application
 +
|-
 +
| 2003-08-03
 +
| Performed Spud Operation
 +
|-
 +
| 2003-08-09
 +
| Drilling Completion
 +
|-
 +
| 2003-08-14
 +
| Perforation
 +
|-
 +
| 2003-12-09
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2003
 
| 2003
 
| [[BELDEN & BLAKE CORP]]
 
| [[BELDEN & BLAKE CORP]]
| style="text-align: right;" | 868.00
+
| style="text-align: right;" | 868
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 137:
 
| 2004
 
| 2004
 
| [[BELDEN & BLAKE CORP]]
 
| [[BELDEN & BLAKE CORP]]
| style="text-align: right;" | 9,669.00
+
| style="text-align: right;" | 9669
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 146:
 
| 2005
 
| 2005
 
| [[BELDEN & BLAKE CORP]]
 
| [[BELDEN & BLAKE CORP]]
| style="text-align: right;" | 3,428.00
+
| style="text-align: right;" | 3428
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
| style="text-align: right;" | 0.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 114: Line 155:
 
| 2006
 
| 2006
 
| [[BELDEN & BLAKE CORP]]
 
| [[BELDEN & BLAKE CORP]]
| style="text-align: right;" | 2,106.00
+
| style="text-align: right;" | 2106.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 132: Line 173:
 
| 2008
 
| 2008
 
| [[BELDEN & BLAKE CORP]]
 
| [[BELDEN & BLAKE CORP]]
| style="text-align: right;" | 1,700.00
+
| style="text-align: right;" | 1700.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 223: Line 264:
 
| [[ENERVEST OPR LLC]]
 
| [[ENERVEST OPR LLC]]
 
| style="text-align: right;" | 611.00
 
| style="text-align: right;" | 611.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[ENERVEST OPR LLC]]
 +
| style="text-align: right;" | 500.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 296: Line 346:
 
| 2007
 
| 2007
 
| [[BELDEN & BLAKE CORP]]
 
| [[BELDEN & BLAKE CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 76.00 Bbl
 
| style="text-align: right;" | 76.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 310: Line 360:
 
| 2009
 
| 2009
 
| [[BELDEN & BLAKE CORP]]
 
| [[BELDEN & BLAKE CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 83.00 Bbl
 
| style="text-align: right;" | 83.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 317: Line 367:
 
| 2011
 
| 2011
 
| [[BELDEN & BLAKE CORP]]
 
| [[BELDEN & BLAKE CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 76.00 Bbl
 
| style="text-align: right;" | 76.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 324: Line 374:
 
| 2013
 
| 2013
 
| [[ENERVEST OPR LLC]]
 
| [[ENERVEST OPR LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 83.00 Bbl
 
| style="text-align: right;" | 83.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 331: Line 381:
 
| 2016
 
| 2016
 
| [[ENERVEST OPR LLC]]
 
| [[ENERVEST OPR LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 46.67 Bbl
+
| style="text-align: right;" | 43.33 Bbl
| Road Spreading
+
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[ENERVEST OPR LLC]]
 
| [[ENERVEST OPR LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 43.33 Bbl
+
| style="text-align: right;" | 46.67 Bbl
| STORAGE PENDING DISPOSAL OR REUSE
+
| Road Spreading
 
|  
 
|  
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[ENERVEST OPR LLC]]
 
| [[ENERVEST OPR LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 40.83 Bbl
 
| style="text-align: right;" | 40.83 Bbl
 
| Road Spreading
 
| Road Spreading
Line 352: Line 402:
 
| 2018
 
| 2018
 
| [[ENERVEST OPR LLC]]
 
| [[ENERVEST OPR LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 41.67 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2018
 +
| [[ENERVEST OPR LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 40.42 Bbl
 
| style="text-align: right;" | 40.42 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 
|-
 
|-
| 2018
+
| 2019
 
| [[ENERVEST OPR LLC]]
 
| [[ENERVEST OPR LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 41.67 Bbl
+
| style="text-align: right;" | 50.00 Bbl
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| INJECTION DISPOSAL WELL
| PA0101508
+
| PAS2D215BWAR
 
|-
 
|-
 
|}
 
|}

Latest revision as of 17:55, 14 May 2020

Well Details

Well ID: 37-123-43441
Loading map...
Country: United States
State: Pennsylvania
County: Warren
Municipality: Pittsfield Township
Operator Name: ENERVEST OPR LLC
Well Pad ID:
Farm/Lease Name: WRIGHT 1
License Status: ACTIVE
Spud Date:
Permit Date: 2003-07-30
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.887061
Longitude: -79.398907

For data sources see[1][2][3]

Well History

Date Event
2003-07-30 New Permit Application
2003-08-03 Performed Spud Operation
2003-08-09 Drilling Completion
2003-08-14 Perforation
2003-12-09 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2003 BELDEN & BLAKE CORP 868 365 0.00 0 0.00 0
2004 BELDEN & BLAKE CORP 9669 366 0.00 0 0.00 0
2005 BELDEN & BLAKE CORP 3428 365 0 365 0.00 0
2006 BELDEN & BLAKE CORP 2106.00 365 0.00 0 0.00 0
2007 BELDEN & BLAKE CORP 1,914.00 365 0.00 0 0.00 0
2008 BELDEN & BLAKE CORP 1700.00 366 0.00 0 0.00 0
2009 BELDEN & BLAKE CORP 1,552.00 365 0.00 0 0.00 0
2010 BELDEN & BLAKE CORP 1,075.00 365 0.00 0 0.00 0
2011 BELDEN & BLAKE CORP 1,217.00 365 0.00 0 0.00 0
2012 ENERVEST OPR LLC 952.00 365 0.00 0 0.00 0
2013 ENERVEST OPR LLC 798.00 365 0.00 0 0.00 0
2014 ENERVEST OPR LLC 812.82 365 0.00 0 0.00 0
2015 ENERVEST OPR LLC 522.00 357 0.00 0 0.00 0
2016 ENERVEST OPR LLC 755.00 366 0.00 0 0.00 0
2017 ENERVEST OPR LLC 445.00 365 0.00 0 0.00 0
2018 ENERVEST OPR LLC 611.00 365 0.00 0 0.00 0
2019 ENERVEST OPR LLC 500.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 BELDEN & BLAKE CORP Brine 143.00 Bbl Road Spreading
2003 BELDEN & BLAKE CORP Fracking Fluid 800.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2003 BELDEN & BLAKE CORP Drilling 600.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2004 BELDEN & BLAKE CORP Brine 393.00 Bbl Road Spreading
2005 BELDEN & BLAKE CORP Brine 116.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2006 BELDEN & BLAKE CORP Brine 160.00 Bbl Other
2006 BELDEN & BLAKE CORP Brine 85.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2007 BELDEN & BLAKE CORP Produced Fluid 76.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2008 BELDEN & BLAKE CORP Brine 75.00 Bbl Other NOT SPEC
2009 BELDEN & BLAKE CORP Produced Fluid 83.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 BELDEN & BLAKE CORP Produced Fluid 76.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2013 ENERVEST OPR LLC Produced Fluid 83.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 ENERVEST OPR LLC Produced Fluid 43.33 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 ENERVEST OPR LLC Produced Fluid 46.67 Bbl Road Spreading
2017 ENERVEST OPR LLC Produced Fluid 40.83 Bbl Road Spreading
2018 ENERVEST OPR LLC Produced Fluid 41.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 ENERVEST OPR LLC Produced Fluid 40.42 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 ENERVEST OPR LLC Produced Fluid 50.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1268504 Primary Facility 2003-08-15 Drilling/Alteration No Violations Noted
1275744 Primary Facility 2003-09-30 Drilling/Alteration No Violations Noted
1277509 Primary Facility 2003-10-09 Site Restoration No Violations Noted
1346831 Primary Facility 2004-06-03 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References