X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22205"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22205
 
| Well ID: 37-003-22205
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.513358, -79.715013 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.513358, -79.715013 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Allegheny County, Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Plum Borough, Allegheny County, Pennsylvania|Plum Borough]]
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: BURTON UNIT 4H
 
|-
 
|-
 
| First Permit Date: 2012-01-11
 
| First Permit Date: 2012-01-11
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.513358
 
| Latitude: 40.513358
Line 33: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 3449.0
 +
| style="text-align:right;" | 92.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 72.3
 +
| style="text-align:right;" | 92.0
 +
|-
 
|-
 
|-
 
| 2013-0
 
| 2013-0
Line 43: Line 62:
 
|-
 
|-
 
|-
 
|-
| 2012-0
+
| 2014-0
| style="text-align:right;" | 3449.0
+
| style="text-align:right;" | 5164.0
| style="text-align:right;" | 92.0
+
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
| style="text-align:right;" | 72.3
+
| style="text-align:right;" | 92.19
| style="text-align:right;" | 92.0
+
| style="text-align:right;" | 365.0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-0
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 1310.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 1189.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-0
 
| 2012-0
Line 92: Line 95:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 99: Line 102:
 
| 2012-0
 
| 2012-0
 
| FRACING FLUID WASTE
 
| FRACING FLUID WASTE
| style="text-align:right;" | 1310.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| FRANKLIN
 
| PA
 
| PA
Line 110: Line 113:
 
| 2012-0
 
| 2012-0
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 1189.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| FRANKLIN
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2012-0
+
| 2013-0
| DRILLING FLUID WASTE
+
| PRODUCED FLUID
| style="text-align:right;" | 570.0
+
| style="text-align:right;" | 637.0
 
| Bbl
 
| Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES DISCHARGE
| PA0091472
+
| PA0095443
| TUNNELTON LIQUIDS COMPANY
+
| CREEKSIDE TREATMENT FACILITY
| SALTSBURG
+
| CREEKSIDE
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2013-0
+
| 2014-0
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 637.0
+
| style="text-align:right;" | 2.0
 
| Bbl
 
| Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 141: Line 144:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 148: Line 157:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 2052685
 
| 2052685
Line 154: Line 165:
 
| TOP HOLE COMPLETE. TOP HOLE RIG IS GONE.
 
| TOP HOLE COMPLETE. TOP HOLE RIG IS GONE.
 
THE SITE IS CLEAN AND DOZED.
 
THE SITE IS CLEAN AND DOZED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 162: Line 175:
 
| US ENERGY DRILLING TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL.
 
| US ENERGY DRILLING TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL.
 
SITE IS OK.
 
SITE IS OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 170: Line 185:
 
| US ENERGY DRILLED TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL.
 
| US ENERGY DRILLED TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL.
 
THE SITE IS BEING REPAIRED FOR THE BIG RIG.
 
THE SITE IS BEING REPAIRED FOR THE BIG RIG.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 178: Line 195:
 
| US ENERGY RIG DRILLED INTO OPEN MINE AT 6OO'.
 
| US ENERGY RIG DRILLED INTO OPEN MINE AT 6OO'.
 
BASKET ABOVE THE MINE WILL BE SET AT 560'.
 
BASKET ABOVE THE MINE WILL BE SET AT 560'.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 185: Line 204:
 
| No Violations Noted
 
| No Violations Noted
 
| TOP HOLE COMPLETE. BIG RIG WILL FINISH.
 
| TOP HOLE COMPLETE. BIG RIG WILL FINISH.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 193: Line 214:
 
| TOP HOLE COMPLETE. SITE IS CLEAN AND DOZED FOR BOTTOM HOLE RIG.
 
| TOP HOLE COMPLETE. SITE IS CLEAN AND DOZED FOR BOTTOM HOLE RIG.
 
THE PIT LEVEL IS LOW.
 
THE PIT LEVEL IS LOW.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 200: Line 223:
 
| No Violations Noted
 
| No Violations Noted
 
| TOP HOLE IS COMPLETE. NO BOTTOM HOLE RI YET.
 
| TOP HOLE IS COMPLETE. NO BOTTOM HOLE RI YET.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 207: Line 232:
 
| No Violations Noted
 
| No Violations Noted
 
| TOP HOLE IS COMPLETE. NO BIG RIG YET. THERE IS NO ACTIVITY AT THIS SITE.
 
| TOP HOLE IS COMPLETE. NO BIG RIG YET. THERE IS NO ACTIVITY AT THIS SITE.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 215: Line 242:
 
| CONTRACTOR EXPANDING SITE AND SPREADING STONE. BIG RIG WILL ARRIVE IN THE NEXT FEW DAYS.
 
| CONTRACTOR EXPANDING SITE AND SPREADING STONE. BIG RIG WILL ARRIVE IN THE NEXT FEW DAYS.
 
SITE AND E&S ARE OK.
 
SITE AND E&S ARE OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 224: Line 253:
 
THE RIG IS UP AND SUPPORT EQUIPTMENT IS BEING SET.
 
THE RIG IS UP AND SUPPORT EQUIPTMENT IS BEING SET.
 
THE SITE IS IN GOOD SHAPE.
 
THE SITE IS IN GOOD SHAPE.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 239: Line 270:
 
2 feet of freeboard, as required by the regulations.  The photo shows there is now the 2' of freeboard, but this 2' of freeboard should always be maintained, at all times.
 
2 feet of freeboard, as required by the regulations.  The photo shows there is now the 2' of freeboard, but this 2' of freeboard should always be maintained, at all times.
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 246: Line 279:
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLTE AND THE RIG IS GONE. TD @ 5008'.
 
| DRILLING COMPLTE AND THE RIG IS GONE. TD @ 5008'.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 253: Line 288:
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING EQUIPTMENT IS GONE. THE SITE IS CLEAN. WATER IS BEING TRUCKED IN FOR THE FRAC JOB.
 
| DRILLING EQUIPTMENT IS GONE. THE SITE IS CLEAN. WATER IS BEING TRUCKED IN FOR THE FRAC JOB.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 261: Line 298:
 
| THIS HORIZONTAL OIL WELL HAS BEEN DRILLED AND FRACED.
 
| THIS HORIZONTAL OIL WELL HAS BEEN DRILLED AND FRACED.
 
SERVICE RIG IS RUNNING TUBING.
 
SERVICE RIG IS RUNNING TUBING.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 268: Line 307:
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE. WELL IS FRACED. A SERVICE RIG IS UP AND WORKING. SITE IN GOOD CONDITION.
 
| DRILLING COMPLETE. WELL IS FRACED. A SERVICE RIG IS UP AND WORKING. SITE IN GOOD CONDITION.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 275: Line 316:
 
| No Violations Noted
 
| No Violations Noted
 
| JACK IS OPERATING. THE SITE IS IN GOOD SHAPE. TANKS ARE DIKED.
 
| JACK IS OPERATING. THE SITE IS IN GOOD SHAPE. TANKS ARE DIKED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 280: Line 323:
 
| 2167324
 
| 2167324
 
| 2013-05-13
 
| 2013-05-13
| Allegheny
 
| Plum Boro
 
 
| No Violations Noted
 
| No Violations Noted
 +
| A HORIZONTAL OIL AND GAS WELL. THE TANKS ARE DIKED AND THE SITE IS RESTORED.
 +
|
 +
|
 +
|
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 05:42, 25 June 2015

Well Details

Well ID: 37-003-22205
Loading map...
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: BURTON UNIT 4H
First Permit Date: 2012-01-11
Last Permit Date: 2012-01-11
Spud Date: 2012-06-14
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.513358
Longitude: -79.715013

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 3449.0 92.0 0.0 0.0 72.3 92.0
2013-0 10833.0 365.0 0.0 0.0 97.8 365.0
2014-0 5164.0 365.0 0.0 0.0 92.19 365.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 DRILLING FLUID WASTE 570.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2012-0 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2012-0 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2013-0 PRODUCED FLUID 637.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2014-0 PRODUCED FLUID 2.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2052685 2012-02-29 No Violations Noted TOP HOLE COMPLETE. TOP HOLE RIG IS GONE.

THE SITE IS CLEAN AND DOZED.

2054239 2012-02-22 No Violations Noted US ENERGY DRILLING TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL.

SITE IS OK.

2054293 2012-03-06 No Violations Noted US ENERGY DRILLED TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL.

THE SITE IS BEING REPAIRED FOR THE BIG RIG.

2054300 2012-02-16 No Violations Noted US ENERGY RIG DRILLED INTO OPEN MINE AT 6OO'.

BASKET ABOVE THE MINE WILL BE SET AT 560'.

2055030 2012-03-21 No Violations Noted TOP HOLE COMPLETE. BIG RIG WILL FINISH.
2064318 2012-04-19 No Violations Noted TOP HOLE COMPLETE. SITE IS CLEAN AND DOZED FOR BOTTOM HOLE RIG.

THE PIT LEVEL IS LOW.

2067389 2012-04-27 No Violations Noted TOP HOLE IS COMPLETE. NO BOTTOM HOLE RI YET.
2072476 2012-05-21 No Violations Noted TOP HOLE IS COMPLETE. NO BIG RIG YET. THERE IS NO ACTIVITY AT THIS SITE.
2074687 2012-06-08 No Violations Noted CONTRACTOR EXPANDING SITE AND SPREADING STONE. BIG RIG WILL ARRIVE IN THE NEXT FEW DAYS.

SITE AND E&S ARE OK.

2078182 2012-06-14 No Violations Noted LES WILSON RIG #25 WILL DRILL THE BOTTOM PORTION OF THIS SHALLOW, HORIZONTAL OIL WELL.

THE RIG IS UP AND SUPPORT EQUIPTMENT IS BEING SET. THE SITE IS IN GOOD SHAPE.

2081745 2012-07-03 No Violations Noted John Ley WQS SWRO was on site to conduct a site inspection. The site sign was properly displayed and the E&S plan was on site. The Erosion and Sediment Pollution Control Program Manual, pg. 30 states "Rock filters are not required where roadway surface is stabilized, ditches are provided with protective liners, and cut banks are stabilized."

The attached pictures show that none of the banks along the access road have been stabilized. At a minimum, the banks should be stabilized (i.e. seeded and mulched) to help prevent erosion of the ditches themselves and excess sedimentation.

In addition to the road banks needing stabilized by seeding and mulching, the entire site (banks and fill) needs to be stabilized.

The picture showing the staining on the pit sidewalls, shows that at one time there was less than the required 2 feet of freeboard, as required by the regulations. The photo shows there is now the 2' of freeboard, but this 2' of freeboard should always be maintained, at all times.

2085953 2012-07-05 No Violations Noted DRILLING COMPLTE AND THE RIG IS GONE. TD @ 5008'.
2085954 2012-07-09 No Violations Noted DRILLING EQUIPTMENT IS GONE. THE SITE IS CLEAN. WATER IS BEING TRUCKED IN FOR THE FRAC JOB.
2093434 2012-08-02 No Violations Noted THIS HORIZONTAL OIL WELL HAS BEEN DRILLED AND FRACED.

SERVICE RIG IS RUNNING TUBING.

2106815 2012-10-09 No Violations Noted DRILLING COMPLETE. WELL IS FRACED. A SERVICE RIG IS UP AND WORKING. SITE IN GOOD CONDITION.
2116548 2012-10-22 No Violations Noted JACK IS OPERATING. THE SITE IS IN GOOD SHAPE. TANKS ARE DIKED.
2167324 2013-05-13 No Violations Noted A HORIZONTAL OIL AND GAS WELL. THE TANKS ARE DIKED AND THE SITE IS RESTORED.

For data sources see[3]

References