If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 300: | Line 300: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0676092110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.817366,"lon":-119.304507,"icon":""}]} |
Location: 00/10-21-067-09W6/0 | |
Location Alias: 00/10-21-67-09 W6M | |
Location Alias 2: 00/10-21-067-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 6 | |
Range: 09 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: LONG RUN WAPITI 10-21-67-9 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0165001 | |
License Date: 1994-02-11 | |
License Status: Abandoned | |
Spud Date: 1994-02-28 | |
Final Drill Date: 1994-03-17 | |
Well Total Depth: 2267.00 m | |
Surface Hole Latitude: 54.817366 | |
Surface Hole Longitude: -119.304507 |
Date | Event |
---|---|
1994-02-11 | Obtained License |
1994-03-03 | Surface Casing Operation Performed |
1994-03-15 | Drill Stem Test Performed |
1994-03-17 | Finished Drilling |
1994-03-17 | Well Log Performed |
1994-03-18 | Well Log Performed |
1994-03-19 | Drill Stem Test Performed |
1994-03-21 | Production Casing Operation Performed |
1994-03-21 | Rig Released |
1994-03-21 | Well Mode changed to Drilled and Cased |
1995-01-12 | Well Log Performed |
1995-01-14 | Perforation Treatment Performed - Jet Perforation |
1995-01-14 | Well Log Performed |
1995-01-15 | Perforation Treatment Performed - Fractured |
2001-03-15 | Well Began Production |
2001-03-15 | Well Fluid changed to Gas |
2001-03-15 | Well Mode changed to Flowing |
2006-01-01 | Well Fluid changed to Gas |
2006-01-01 | Well Mode changed to Suspended |
2009-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-06 | Plug Back Performed |
2009-03-06 | Well Fluid changed to Gas |
2009-03-06 | Well Mode changed to Abandoned Zone |
2009-03-07 | Perforation Treatment Performed - Jet Perforation |
2009-03-08 | Perforation Treatment Performed - Remedial Casing |
2009-03-09 | Perforation Treatment Performed - Cement Plug |
2009-03-09 | Plug Back Performed |
2009-03-14 | Well Abandoned |
2009-03-14 | Well Fluid changed to Gas |
2009-03-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-01-14 | Perforation | 2059.00 | 2078.00 | 13 |
1995-01-15 | Fracture | 2059.00 | 2078.00 | 0 |
2009-03-06 | Packing Device Capped w/Cement | 2042.00 | 2050.00 | 0 |
2009-03-07 | Perforation | 635.00 | 636.00 | 20 |
2009-03-08 | Remedial Casing Cementing | 635.00 | 636.00 | 0 |
2009-03-09 | Cement Plug | 619.00 | 635.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 76 | 0.0 | 0.0 | 0.0 |
2001 | 399 | 0.0 | 0.0 | 0.0 |
For data sources see[5]