If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 316: | Line 316: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0854072505060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.400222,"lon":-110.959567,"icon":""}]} |
Location: 06/05-25-085-07W4/0 | |
Location Alias: 06/05-25-85-07 W4M | |
Location Alias 2: 06/05-25-085-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 085 | |
Meridian: 4 | |
Range: 07 | |
Section: 25 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: NEXEN OPTI 06S11 NEWBY 5-25-85-7 | |
Operator Name: CNOOC Petroleum North America ULC | |
License Number: 0327185 | |
License Date: 2005-02-28 | |
License Status: Issued | |
Spud Date: 2005-05-09 | |
Final Drill Date: 2005-07-03 | |
Well Total Depth: 1327.00 m | |
Surface Hole Latitude: 56.400222 | |
Surface Hole Longitude: -110.959567 |
Date | Event |
---|---|
2005-02-28 | Obtained License |
2005-05-09 | Direction Drilling Operation Performed - Deviate |
2005-05-09 | Surface Casing Operation Performed |
2005-06-18 | Direction Drilling Operation Performed - Horizontal |
2005-06-18 | Well Log Performed |
2005-06-19 | Intermediate Casing Operation Performed |
2005-06-19 | Well Log Performed |
2005-06-30 | Well Log Performed |
2005-07-03 | Finished Drilling |
2005-07-03 | Well Log Performed |
2005-07-03 | Well Mode changed to Drilled and Cased |
2005-07-04 | Liner Casing Operation Performed |
2005-07-04 | Perforation Treatment Performed - Slotted Liner or Casing |
2005-07-04 | Rig Released |
2005-07-04 | Well Log Performed |
2007-10-01 | Well Began Production |
2007-10-01 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-05-09 | 1.00 | Deviate (5 - 79 degrees) |
2005-06-18 | 343.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-07-04 | Slotted Liner | 367.40 | 1317.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]