X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-36702"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36702
 
| Well ID: 37-063-36702
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.456101, -79.106683 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.456101, -79.106683 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Indiana County, Pennsylvania|Indiana]]
 +
|-
 +
| Municipality: [[West Wheatfield Township, Indiana County, Pennsylvania|West Wheatfield Township]]
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: JAMES MCCONNELL 3
 
|-
 
|-
 
| First Permit Date: 2009-10-26
 
| First Permit Date: 2009-10-26
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: INACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.456101
 
| Latitude: 40.456101
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2009-0
| style="text-align:right;" | 2851.0
+
| style="text-align:right;" | 0.0
| style="text-align:right;" | 365.0
+
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 43: Line 53:
 
|-
 
|-
 
|-
 
|-
| 2012-0
+
| 2010-0
| style="text-align:right;" | 3790.0
+
| style="text-align:right;" | 5195.0
| style="text-align:right;" | 366.0
+
| style="text-align:right;" | 245.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2012-0
| style="text-align:right;" | 5195.0
+
| style="text-align:right;" | 3790.0
| style="text-align:right;" | 245.0
+
| style="text-align:right;" | 366.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 70: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2013-0
 +
| style="text-align:right;" | 2851.0
 +
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 2531.0
 +
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 79: Line 98:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 90: Line 115:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 30.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
Line 108: Line 122:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 119: Line 133:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 130: Line 144:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| FRANKLIN
 
| PA
 
| PA
Line 141: Line 155:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 152: Line 166:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| FRANKLIN
 
| PA
 
| PA
Line 160: Line 174:
 
| PRODUCED FLUID
 
| PRODUCED FLUID
 
| style="text-align:right;" | 91.0
 
| style="text-align:right;" | 91.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
| CREEKSIDE TREATMENT FACILITY
 +
| CREEKSIDE
 +
| PA
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 27.0
 
| Bbl
 
| Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 168: Line 193:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 175: Line 206:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1845230
 
| 1845230
Line 180: Line 213:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S or IW issues at the site.  Well location marked at site.  Pit dug but no aligned.  Filter fence set around the site.  Well sign and E&S plan located at the entrance way of site.  Down gradient filter fence present along site pad. Rig not present.  Called Penneco to change on-site E&S plan.
 
| At the time of inspection, no E&S or IW issues at the site.  Well location marked at site.  Pit dug but no aligned.  Filter fence set around the site.  Well sign and E&S plan located at the entrance way of site.  Down gradient filter fence present along site pad. Rig not present.  Called Penneco to change on-site E&S plan.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 186: Line 221:
 
| 2009-11-23
 
| 2009-11-23
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, the well was actively being drilled. The site was properly signed with E&S plan onsite available for review. The pit sustained a 2ft of freeboard and was structural ok, but it is recommended that measures to secure the pit liner are enhanced, as the liner did not appear to be suitably secured with either backfill or stakes. Noted that filter fabric fence was installed down gradient from site, but it is recommended the operator monitor all sediment BMP¿s to ensure proper functioning ability in order to prevent potential pollution events such as accelerated erosion or sedimentation issues. Also noted, that inspector Paul Wyrwas made a phone call to operator noting the relocation of drill pit, which was not changed on the E&S plan. Also noted the prior approval was given, with the exception that proper landowner consent was received, that the well may be established closer than 200ft to an existing building/ water supply.
+
| At the time of inspection, the well was actively being drilled. The site was properly signed with E&S plan onsite available for review. The pit sustained a 2ft of freeboard and was structural ok, but it is recommended that measures to secure the pit liner are enhanced, as the liner did not appear to be suitably secured with either backfill or stakes. Noted that filter fabric fence was installed down gradient from site, but it is recommended the operator monitor all sediment BMP﾿s to ensure proper functioning ability in order to prevent potential pollution events such as accelerated erosion or sedimentation issues. Also noted, that inspector Paul Wyrwas made a phone call to operator noting the relocation of drill pit, which was not changed on the E&S plan. Also noted the prior approval was given, with the exception that proper landowner consent was received, that the well may be established closer than 200ft to an existing building/ water supply.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 193: Line 230:
 
| 2009-12-04
 
| 2009-12-04
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S or IW issues at the site.  Well sign and E&S plan located at the entrance of site.  Pit aligned with 20 mil plastic.  No freeboard issues.  Conductor pipe set at 37 ft ¿ 13 3/8 ¿pipe.  Current depth at 220¿ Second stringer 9 5/8¿ pipe was set at 210 ft using 75 sks and basket at 84¿.  Permit and sedimentary log present.  Water not recorded.  Sedimentary consisted of ss/sh alternation and coal seam.  No voids or methane detected.  Filter fence set around the site.  Permit set for 4975 ft well.
+
| At the time of inspection, no E&S or IW issues at the site.  Well sign and E&S plan located at the entrance of site.  Pit aligned with 20 mil plastic.  No freeboard issues.  Conductor pipe set at 37 ft ﾿ 13 3/8 ﾿pipe.  Current depth at 220﾿ Second stringer 9 5/8﾿ pipe was set at 210 ft using 75 sks and basket at 84﾿.  Permit and sedimentary log present.  Water not recorded.  Sedimentary consisted of ss/sh alternation and coal seam.  No voids or methane detected.  Filter fence set around the site.  Permit set for 4975 ft well.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 201: Line 240:
 
| No Violations Noted
 
| No Violations Noted
 
| During this inspection, well properly tagged and in production. Drilling completed on 12/2/2009. Site restored with minimum 705 vegetative cover, although recommend that operator reseed to ensure that uniform coverage is achieved across the site. Access road appears stable. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. Appears that brine tank may have a small seep or minor (< 5gals) release occurred during pumping of tank as discoloration along a section of bottom of tank and rock underlying tank is noted. Spoke with Dean Walters of Penneco on 9/28/10 at 930am regarding the possible concerns with the tank, operator had plans to look at tank and get back to me on findings. A follow up inspection will be conducted to ensure action has been taken and/or cleanup measures are performed as needed. Accompanied with WQS Dana Burk during inspection.
 
| During this inspection, well properly tagged and in production. Drilling completed on 12/2/2009. Site restored with minimum 705 vegetative cover, although recommend that operator reseed to ensure that uniform coverage is achieved across the site. Access road appears stable. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. Appears that brine tank may have a small seep or minor (< 5gals) release occurred during pumping of tank as discoloration along a section of bottom of tank and rock underlying tank is noted. Spoke with Dean Walters of Penneco on 9/28/10 at 930am regarding the possible concerns with the tank, operator had plans to look at tank and get back to me on findings. A follow up inspection will be conducted to ensure action has been taken and/or cleanup measures are performed as needed. Accompanied with WQS Dana Burk during inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 211: Line 252:
 
Spoke with Dean Walters on 10/4/10 at 8am whom informed me that a small seep was detected on bottom of tank, tank was emptied, and repair is planned for 10/4/10. Operator informed that release was very minor (<5 gals) and that all impacted rock would be removed and replaced. Again, a follow inspection will be conducted to ensure repair/cleanup is completed.  
 
Spoke with Dean Walters on 10/4/10 at 8am whom informed me that a small seep was detected on bottom of tank, tank was emptied, and repair is planned for 10/4/10. Operator informed that release was very minor (<5 gals) and that all impacted rock would be removed and replaced. Again, a follow inspection will be conducted to ensure repair/cleanup is completed.  
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 217: Line 260:
 
| 2010-12-02
 
| 2010-12-02
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S or IW issues at the site.  Well completed with 8¿ x 4¿ pipe and reduced to 2¿ production line.  Line connected to totalize meter, separator (showing 300 psi), heater running and 100 bbl brine tank (<10 bbl fluid).    No signs of leakage around well head.  Well tag present
+
| At the time of inspection, no E&S or IW issues at the site.  Well completed with 8﾿ x 4﾿ pipe and reduced to 2﾿ production line.  Line connected to totalize meter, separator (showing 300 psi), heater running and 100 bbl brine tank (<10 bbl fluid).    No signs of leakage around well head.  Well tag present
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 21:08, 26 June 2015

Well Details

Well ID: 37-063-36702
Loading map...
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: JAMES MCCONNELL 3
First Permit Date: 2009-10-26
Last Permit Date: 2009-10-26
Spud Date: 2009-11-18
Unconventional: No
Horizontal: No
Well Status: INACTIVE
Violations: 0
Latitude: 40.456101
Longitude: -79.106683

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-0 5195.0 245.0 0.0 0.0 0.0 0.0
2011-0 5048.0 334.0 0.0 0.0 0.0 0.0
2012-0 3790.0 366.0 0.0 0.0 0.0 0.0
2013-0 2851.0 365.0 0.0 0.0 0.0 0.0
2014-0 2531.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 PRODUCED FLUID 25.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 PRODUCED FLUID 40.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 PRODUCED FLUID 35.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2011-0 PRODUCED FLUID 144.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2012-0 PRODUCED FLUID 30.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2013-0 PRODUCED FLUID 91.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2014-0 PRODUCED FLUID 27.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1845230 2009-11-19 No Violations Noted At the time of inspection, no E&S or IW issues at the site. Well location marked at site. Pit dug but no aligned. Filter fence set around the site. Well sign and E&S plan located at the entrance way of site. Down gradient filter fence present along site pad. Rig not present. Called Penneco to change on-site E&S plan.
1847467 2009-11-23 No Violations Noted At the time of inspection, the well was actively being drilled. The site was properly signed with E&S plan onsite available for review. The pit sustained a 2ft of freeboard and was structural ok, but it is recommended that measures to secure the pit liner are enhanced, as the liner did not appear to be suitably secured with either backfill or stakes. Noted that filter fabric fence was installed down gradient from site, but it is recommended the operator monitor all sediment BMP﾿s to ensure proper functioning ability in order to prevent potential pollution events such as accelerated erosion or sedimentation issues. Also noted, that inspector Paul Wyrwas made a phone call to operator noting the relocation of drill pit, which was not changed on the E&S plan. Also noted the prior approval was given, with the exception that proper landowner consent was received, that the well may be established closer than 200ft to an existing building/ water supply.
1847593 2009-12-04 No Violations Noted At the time of inspection, no E&S or IW issues at the site. Well sign and E&S plan located at the entrance of site. Pit aligned with 20 mil plastic. No freeboard issues. Conductor pipe set at 37 ft ﾿ 13 3/8 ﾿pipe. Current depth at 220﾿ Second stringer 9 5/8﾿ pipe was set at 210 ft using 75 sks and basket at 84﾿. Permit and sedimentary log present. Water not recorded. Sedimentary consisted of ss/sh alternation and coal seam. No voids or methane detected. Filter fence set around the site. Permit set for 4975 ft well.
1917839 2010-09-22 No Violations Noted During this inspection, well properly tagged and in production. Drilling completed on 12/2/2009. Site restored with minimum 705 vegetative cover, although recommend that operator reseed to ensure that uniform coverage is achieved across the site. Access road appears stable. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. Appears that brine tank may have a small seep or minor (< 5gals) release occurred during pumping of tank as discoloration along a section of bottom of tank and rock underlying tank is noted. Spoke with Dean Walters of Penneco on 9/28/10 at 930am regarding the possible concerns with the tank, operator had plans to look at tank and get back to me on findings. A follow up inspection will be conducted to ensure action has been taken and/or cleanup measures are performed as needed. Accompanied with WQS Dana Burk during inspection.
1917845 2010-10-01 No Violations Noted This inspection is being conducted as a follow-up to a possible concern with the structural integrity of brine tank. Brine tank appears empty. Side of tank and rock were slightly discolored. Spoke to landowner, who stated that operator pumped out brine tank earlier in the week and had plans to repair tank early next week.

Spoke with Dean Walters on 10/4/10 at 8am whom informed me that a small seep was detected on bottom of tank, tank was emptied, and repair is planned for 10/4/10. Operator informed that release was very minor (<5 gals) and that all impacted rock would be removed and replaced. Again, a follow inspection will be conducted to ensure repair/cleanup is completed.

1931748 2010-12-02 No Violations Noted At the time of inspection, no E&S or IW issues at the site. Well completed with 8﾿ x 4﾿ pipe and reduced to 2﾿ production line. Line connected to totalize meter, separator (showing 300 psi), heater running and 100 bbl brine tank (<10 bbl fluid). No signs of leakage around well head. Well tag present

For data sources see[3]

References