X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-019-20326"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-019-20326
 
| Well ID: 34-019-20326
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.6070140754, -81.2649828159 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.60701408, -81.26498282 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Carroll County, Ohio|Carroll]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ENERVEST OPERATING L]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 1968-11-29
 
| Spud Date: 1968-11-29
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Active Injection
 
|-
 
|-
| Violations: 1
+
| Violations: 0
 
|-
 
|-
| Latitude: 40.6070140754
+
| Latitude: 40.60701408
 
|-
 
|-
| Longitude: -81.2649828159
+
| Longitude: -81.26498282
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1984-0
 +
| style="text-align:right;" | 662.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 336.0
 +
|
 +
|-
 +
|-
 +
| 1985-0
 +
| style="text-align:right;" | 830.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 244.0
 +
|
 +
|-
 +
|-
 +
| 1986-0
 +
| style="text-align:right;" | 353.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 89.0
 +
|
 +
|-
 +
|-
 +
| 1998-0
 +
| style="text-align:right;" | 353.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 156.0
 +
|
 +
|-
 +
|-
 +
| 1999-0
 +
| style="text-align:right;" | 47.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 39.0
 +
|
 +
|-
 +
|-
 +
| 2000-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 181.0
 +
|
 +
|-
 +
|-
 +
| 2001-0
 +
| style="text-align:right;" | 74.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 131.0
 +
|
 +
|-
 +
|-
 +
| 2002-0
 +
| style="text-align:right;" | 211.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 227.0
 +
|
 +
|-
 +
|-
 +
| 2003-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 507.0
 +
|
 +
|-
 +
|-
 +
| 2004-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 491.0
 +
|
 +
|-
 +
|-
 +
| 2005-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 865.0
 +
|
 +
|-
 +
|-
 +
| 2006-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1050.0
 +
|
 +
|-
 +
|-
 +
| 2007-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1096.0
 +
|
 +
|-
 +
|-
 +
| 2008-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 591.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 423.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 152.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 220:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1012232119
 
| -1012232119
 
| 2010-02-26
 
| 2010-02-26
|
+
|  
 
| Inspection revealed that the injection pressure is 550 PSI and the annulus pressure is 330 PSI . No violations at this time.
 
| Inspection revealed that the injection pressure is 550 PSI and the annulus pressure is 330 PSI . No violations at this time.
|
+
|  
|
+
|  
|
+
| Phone Call
 
|-
 
|-
 
|-
 
|-
 
| -1012654515
 
| -1012654515
 
| 2007-05-22
 
| 2007-05-22
|
+
|  
 
| Inspection revealed that the injection pressure is 1100 psi and the annulus pressure is 240 psi . No violations at this time.
 
| Inspection revealed that the injection pressure is 1100 psi and the annulus pressure is 240 psi . No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1053664438
 
| -1053664438
 
| 2008-06-03
 
| 2008-06-03
|
+
|  
 
| Inspection revealed that the injection pressure is 600 PSI and the annular pressure is 500 PSI . They aren't injecting into the well at this time.
 
| Inspection revealed that the injection pressure is 600 PSI and the annular pressure is 500 PSI . They aren't injecting into the well at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1081891408
 +
| 2014-06-11
 +
|
 +
| Inspection revealed that injection pump was not in operation during my inspection.
 +
Note: Timber cutters are using lease road to well and loading timber near this well.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1086716627
 
| -1086716627
 
| 2009-01-23
 
| 2009-01-23
|
+
|  
 
| Inspection revealed that the injection pressure is 400 PSI and the annulus pressure is 300 PSI . No violations at this time.
 
| Inspection revealed that the injection pressure is 400 PSI and the annulus pressure is 300 PSI . No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1095137664
 
| -1095137664
 
| 2010-05-10
 
| 2010-05-10
|
+
|  
 
| Inspection revealed that the injection pressure is 700 PSI and the annulus pressure is 400 PSI. No violations at this time.
 
| Inspection revealed that the injection pressure is 700 PSI and the annulus pressure is 400 PSI. No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 110876213
 +
| 2006-07-31
 +
|
 +
| Inspection revealed that the injection pressure is 300 psi and the annular pressure is 220 . No violations at this time .
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1133574630
 +
| 2013-10-29
 +
|
 +
| Well is down awaiting service rig to perform repair work on tubing and packer.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1275952473
 +
| 2005-05-17
 +
|
 +
| Inspection revealed that the injection pressure was 480 and the annulus pressure was 200 . No violations at this time .
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1288i506
 +
| 2002-04-10
 +
|
 +
| Note : The well is a production well that is being converted into a salt water injection well  ( permit issued on  04 / 02 / 02 ) .  Bishop Well Services rig is pulling the rods and tubing  ( stripping job ) .  No violations at this time .
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1288i541
 +
| 2002-05-20
 +
|
 +
| Appalachian Well Services is trying to get the casing to back off at 3215' ;  shot the casing twice with a light shot in an attempt to get the casing to back off at the collar at 3215' . Also tried to shoot and back off at 3023' once . Finally got the casing backed off , depth unknown at this time . I will check the site again tomorrow to see where the casing backed off .
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1288i557
 +
| 2002-05-27
 +
|
 +
| The inspection revealed that they are building the tank pad and the dike area for the storage facility . No violations at this time .
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1304293221
 +
| 2012-10-05
 +
|
 +
| Inspection revealed that facility appears to be in satisfactory condition this inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1348385758
 +
| 2015-02-13
 +
|
 +
| Inspection revealed that the two wells on this lease are not being used at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1357928730
 +
| 2006-11-15
 +
|
 +
| Inspection revealed that the injection pressure is 320 and the annulus pressure is 180 . No violations at this time .
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1363695452
 
| -1363695452
 
| 2013-03-08
 
| 2013-03-08
|
+
|  
 
| Inspection revealed that injection pump was not in operation during my inspection.
 
| Inspection revealed that injection pump was not in operation during my inspection.
 
Note: Walked flow line area going to well head to monitor for leaks none were found and I called company personnel to discuss replacing I.D. tags at wellhead and he stated he had new ones made and would place them at the well heads next week.
 
Note: Walked flow line area going to well head to monitor for leaks none were found and I called company personnel to discuss replacing I.D. tags at wellhead and he stated he had new ones made and would place them at the well heads next week.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1380115008
 +
| 2013-09-25
 +
|
 +
| Inspection revealed that well is down awaiting on service rig to remove tubing and packer from well and then run casing scraper and then replace tubing and packer in well.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1384468883
 +
| 2013-11-14
 +
|
 +
| Packer set at 5181' new tubing 4.7# per ft. top perforation@5274.'will pressure test tomorrow.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1395494463
 +
| 2013-03-19
 +
|
 +
| Inspected site along with county inspector and it was noted that injection pump was in operation today.
 +
Note: New I.D. tags have been posted on both wells at this facility.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -141132166
 
| -141132166
 
| 2008-06-18
 
| 2008-06-18
|
+
|  
 
| Inspection revealed that the injection pressure is 810 PSI and the annular pressure is 500 PSI . No violations at this time.
 
| Inspection revealed that the injection pressure is 810 PSI and the annular pressure is 500 PSI . No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 142506317
 +
| 2013-02-08
 +
|
 +
| Inspection revealed that clean up in tank area is complete after operator called and stated that they had blockage in crossover plumbing from 210 bbl tanks and tank had overrun approximately 2 bbl of oil from tank, all free standing oil has been cleaned up and outer tank has been clean and absorbent has been applied to affected area.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1459625585
 
| -1459625585
 
| 2007-10-16
 
| 2007-10-16
|
+
|  
 
| Inspection revealed that the injection pressure is 1140 PSI and the annulus pressure is 900 PSI . No violations at this time.
 
| Inspection revealed that the injection pressure is 1140 PSI and the annulus pressure is 900 PSI . No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1483092378
 +
| 2006-01-27
 +
|
 +
| Inspection revealed no violations at this time . Injection pressure is 800 and the annulus pressure is 1000 .
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1511146964
 +
| 2013-01-04
 +
|
 +
| Inspection revealed that injection pump was not in operation today and facility is in satisfactory condition this inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1513085965
 
| -1513085965
 
| 2007-08-02
 
| 2007-08-02
|
+
|  
 
| Inspection revealed that the injection pressure is 1070 PSI and the annulus pressure is 750 . No violations at this time.
 
| Inspection revealed that the injection pressure is 1070 PSI and the annulus pressure is 750 . No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1514197844
 +
| 2010-01-19
 +
|
 +
| Inspection revealed that they are injecting into the well at this time. Injection pressure at the wellhead is 475 PSI and the annulus pressure is 340 PSI. No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1521585145
 
| -1521585145
 
| 2005-12-27
 
| 2005-12-27
|
+
|  
 
| Inspection revealed no violations at this time . Injection pressure is 800 and the annulus pressure is 1000.
 
| Inspection revealed no violations at this time . Injection pressure is 800 and the annulus pressure is 1000.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1566314287
 
| -1566314287
 
| 2005-02-23
 
| 2005-02-23
|
+
|  
| Inspection revealed that the operator is injecting into this well at this time . The injection pressure is 450 psi and the annulus pressure is 200 psi . No violations at this time .
+
| Inspection revealed that the operator is injecting into this well at this time . The injection pressure is 450 psi and the annulus pressure is 200 psi . No violations at this time .
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1586759606
 +
| 2007-03-29
 +
|
 +
| Inspection revealed that the injection pressure is 140 psi and the annulus pressure is 240 psi . No violations at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1674275868
 +
| 2014-02-11
 +
|
 +
| On site to witness Universal Well Services pump off disk from bottom of packer and then perform 500 gallon acid job on well and once job was done well was shut in too let acid soak.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1710716399
 
| -1710716399
 
| 2008-11-18
 
| 2008-11-18
|
+
|  
 
| Inspection revealed that the injection pressure is 400 PSI and the annulus pressure is 910 PSI . No violations at this time.
 
| Inspection revealed that the injection pressure is 400 PSI and the annulus pressure is 910 PSI . No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1742394343
 +
| 2008-03-07
 +
|
 +
| Inspection revealed that the injection pressure is 400psi and the annulus is 850psi . No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1757900278
 
| -1757900278
 
| 2014-03-27
 
| 2014-03-27
|
+
|  
 
| Inspection revealed that injection pump was not in operation today and it was noted that unloading pad has been steamed cleaned since my last inspection.
 
| Inspection revealed that injection pump was not in operation today and it was noted that unloading pad has been steamed cleaned since my last inspection.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1838870106
 +
| 2013-11-15
 +
|
 +
| On site to pressure test annulus of tubing Chipco Services(Corey's rig) they ran 5179' of new tubing and a new Baker Set Lock packer equipped with on/off tool and setting depth is 5181' to center of elements overall length of entire string is 5184.10,well was tested@1300# with no decline in pressure.
 +
Note well was tested@1300# with hole fluid and once preliminary testing passed they unjayed from packer and they flushed annulus with 60 barrel of inhibitor laden fluid and once inhibitor was present we hooked back onto packer and performed final testing with no decline in pressure.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 18476655
 +
| 2008-09-08
 +
|
 +
| Inspection revealed the injection pressure is 550 PSI and the annular pressure is 445 PSI . No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1853941203
 
| -1853941203
 
| 2009-06-01
 
| 2009-06-01
|
+
|  
 
| Inspection revealed that the injection pressure is 200 PSI and the annulus pressure is 580 PSI. No violations at this time.
 
| Inspection revealed that the injection pressure is 200 PSI and the annulus pressure is 580 PSI. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1879636218
 
| -1879636218
 
| 2008-10-09
 
| 2008-10-09
|
+
|  
 
| Inspection revealed that the injection pressure is 760 PSI and the annulus pressure is 920 PSI . No violations at this time
 
| Inspection revealed that the injection pressure is 760 PSI and the annulus pressure is 920 PSI . No violations at this time
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1899991315
 +
| 2005-04-21
 +
|
 +
| Inspection revealed that the injection pressure is 520 PSI and the annulus pressure is 210 PSI . No violations at this time .
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1912883724
 +
| 2012-12-07
 +
|
 +
| Facility appears to be in satisfactory condition this inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1948492001
 
| -1948492001
 
| 2008-07-09
 
| 2008-07-09
|
+
|  
 
| Inspection revealed that the injection pressure is 590 PSI and the annular pressure is 730 PSI . No violations at this time.
 
| Inspection revealed that the injection pressure is 590 PSI and the annular pressure is 730 PSI . No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1953305719
 
| -1953305719
 
| 2006-08-14
 
| 2006-08-14
|
+
|  
 
| Inspection revealed that there is a hammer union on the wellhead dripping brine . I contacted Mike Leach and he advised that it would be repaired immediately . The injection pressure is 380 and the annular pressure is 210 . Returned to site later and the brine drip was repaired .
 
| Inspection revealed that there is a hammer union on the wellhead dripping brine . I contacted Mike Leach and he advised that it would be repaired immediately . The injection pressure is 380 and the annular pressure is 210 . Returned to site later and the brine drip was repaired .
|
+
|  
| 9-3-07(H)
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1954567703
 
| -1954567703
 
| 2007-06-18
 
| 2007-06-18
|
+
|  
 
| Inspection revealed that the injection pressure is 1160 and the annulus pressure is 240 . No violations at this time.
 
| Inspection revealed that the injection pressure is 1160 and the annulus pressure is 240 . No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1980152710
 +
| 2005-01-27
 +
|
 +
| Inspection revealed no violations at this time . Injection pressure was zero psi and the annulus was 200 psi . They are injecting into the #6 SWIW well at this time . They will start injecting back into this well 02/01/2005 . They alternate injection between the #6 and #7 well .
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1981029576
 
| -1981029576
 
| 2009-07-23
 
| 2009-07-23
|
+
|  
 
| Inspection revealed that the injection pressure is 900 PSI and the annulus pressure is 240 PSI. No violations at this time.
 
| Inspection revealed that the injection pressure is 900 PSI and the annulus pressure is 240 PSI. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -199787451
 
| -199787451
 
| 2014-05-01
 
| 2014-05-01
|
+
|  
 
| Inspection revealed that injection pump was not in operation today.
 
| Inspection revealed that injection pump was not in operation today.
 
Note: Unloading pad has been steamed cleaned since my last inspection.
 
Note: Unloading pad has been steamed cleaned since my last inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -2009941691
 
| -2009941691
 
| 2009-08-11
 
| 2009-08-11
|
+
|  
 
| Inspection revealed that the injection pressure is 520 PSI and the annulus pressure is 240 PSI. No violations at this time.
 
| Inspection revealed that the injection pressure is 520 PSI and the annulus pressure is 240 PSI. No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 202466643
 +
| 2014-10-06
 +
|
 +
| Inspection revealed that injection pump was not in operation during my inspection and it was noted that owner has reclaimed site from recent work over project.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 205629777
 +
| 2008-02-06
 +
|
 +
| Inspection revealed that the injection pressure is 1150psi and the annulus pressure is 860psi. No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -2126616318
 
| -2126616318
 
| 2014-07-16
 
| 2014-07-16
|
+
|  
 
| Inspected site along with two staff members from central office and it was determined that injection pump was not in operation today
 
| Inspected site along with two staff members from central office and it was determined that injection pump was not in operation today
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -313333576
 
| -313333576
 
| 2007-12-20
 
| 2007-12-20
|
+
|  
 
| Inspection revealed that the injection pressure is 450psi  and the annulus pressure is 850 psi. No violations at this time.
 
| Inspection revealed that the injection pressure is 450psi  and the annulus pressure is 850 psi. No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 396231400
 +
| 2014-12-12
 +
|
 +
| Inspection revealed that injection pump was not in operation during my inspection and it appears that this facility is not used much at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 398128426
 +
| 2013-05-29
 +
|
 +
| Facility is in satisfactory condition this inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 404733869
 +
| 2006-02-21
 +
|
 +
| Inspection revealed no violations at this time . Injection pressure is 750 psi and the annulus pressure is 1000 .
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -500718937
 
| -500718937
 
| 2008-12-16
 
| 2008-12-16
|
+
|  
 
| Inspection revealed that the injection pressure is 800 PSI and the annulus pressure is 920 PSI . No violations at this time.
 
| Inspection revealed that the injection pressure is 800 PSI and the annulus pressure is 920 PSI . No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -537192896
 
| -537192896
 
| 2010-04-07
 
| 2010-04-07
|
+
|  
 
| Inspection revealed that the injection pressure is 500 PSI and the annulus pressure is 770 PSI . No violations at this time. Injection pump not running at this time. NOTE: The annulus pressure has increased from 330 PSI to 770 PSI since the last inspection on 02/26/2010.
 
| Inspection revealed that the injection pressure is 500 PSI and the annulus pressure is 770 PSI . No violations at this time. Injection pump not running at this time. NOTE: The annulus pressure has increased from 330 PSI to 770 PSI since the last inspection on 02/26/2010.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 58200469
 +
| 2015-05-11
 +
|
 +
| Inspection revealed that injection pump was not in operation today.
 +
Note: Called Mike Burkhart company rep requesting that he have 2 valve on oil tank replaced ASAP.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -59927238
 
| -59927238
 
| 2009-05-06
 
| 2009-05-06
|
+
|  
 
| Inspection revealed that the injection pressure is 240 PSI and the annular pressure is 580 PSI. No violations at this time.
 
| Inspection revealed that the injection pressure is 240 PSI and the annular pressure is 580 PSI. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -636946494
 
| -636946494
 
| 2007-09-10
 
| 2007-09-10
|
+
|  
 
| Inspection revealed that the injection pressure is 300 PSI and the annulus pressure is 750 PSI. No violations at this time.
 
| Inspection revealed that the injection pressure is 300 PSI and the annulus pressure is 750 PSI. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -641545335
 
| -641545335
 
| 2006-05-04
 
| 2006-05-04
|
+
|  
 
| Inspection revealed that the injection pressure is 180 psi and the annulus pressure is 440 psi ; they are not injecting into this well at this time . No violations at this time .
 
| Inspection revealed that the injection pressure is 180 psi and the annulus pressure is 440 psi ; they are not injecting into this well at this time . No violations at this time .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -654080793
 
| -654080793
 
| 2013-08-02
 
| 2013-08-02
|
+
|  
 
| Inspection revealed that well is not in operation at this time, tank area is clean and neat and identification is posted at well head and flow line area is free of leakage.
 
| Inspection revealed that well is not in operation at this time, tank area is clean and neat and identification is posted at well head and flow line area is free of leakage.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 657414761
 +
| 2007-07-19
 +
|
 +
| Inspection revealed that the injection pressure is 150 psi and the annulus pressure is 220 psi. No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -658322120
 
| -658322120
 
| 2006-06-08
 
| 2006-06-08
|
+
|  
 
| Inspection revealed no violations at this time . Injection pressure is 240 psi and annulus pressure is 420 psi .
 
| Inspection revealed no violations at this time . Injection pressure is 240 psi and annulus pressure is 420 psi .
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -702233813
 
| -702233813
 
| 2008-01-09
 
| 2008-01-09
|
+
|  
 
| Inspection revealed that the injection pressure is 500psi and the annulus pressure is 840psi. No violations at this time.
 
| Inspection revealed that the injection pressure is 500psi and the annulus pressure is 840psi. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -740296455
 
| -740296455
 
| 2012-06-20
 
| 2012-06-20
|
+
|  
 
| I am checking this well as requested by UIC Supervisor Tom Tomastik and DNR Deputy Chief Bob Worstall. I found this well in operation with no violations at this time.
 
| I am checking this well as requested by UIC Supervisor Tom Tomastik and DNR Deputy Chief Bob Worstall. I found this well in operation with no violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -837401372
 
| -837401372
 
| 2010-06-09
 
| 2010-06-09
|
+
|  
 
| Inspection revealed that the injection pressure is 650 PSI and the annulus pressure is 390 PSI. No violations at this time.
 
| Inspection revealed that the injection pressure is 650 PSI and the annulus pressure is 390 PSI. No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 842394882
 +
| 2014-01-13
 +
|
 +
| Inspection revealed that well is not in operation at this time they are waiting on weather conditions to improve so they can get pump truck on site to blow off plug on bottom of tubing and then perform acid job on said well.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -844909984
 
| -844909984
 
| 2009-11-03
 
| 2009-11-03
|
+
|  
 
| Inspection revealed that the injection pressure is 600 PSI and the annular  pressure is 350 PSI. No violations at this time.
 
| Inspection revealed that the injection pressure is 600 PSI and the annular  pressure is 350 PSI. No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 873793297
 +
| 2014-11-19
 +
|
 +
| Inspection revealed that injection pump was not in operation today.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -886365456
 
| -886365456
 
| 2005-08-10
 
| 2005-08-10
|
+
|  
 
| Inspection revealed that the injection pressure was 20 and the annulus pressure was 200 . No violations at this time .
 
| Inspection revealed that the injection pressure was 20 and the annulus pressure was 200 . No violations at this time .
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -976868098
 
| 2013-06-26
 
|
 
| Inspection revealed that well was not in operation during my inspection.
 
Note: Fresh water in dike area needs to removed to allow for volume in the event of spill.
 
|
 
|
 
|
 
|-
 
|-
 
| 1081891408
 
| 2014-06-11
 
|
 
| Inspection revealed that injection pump was not in operation during my inspection.
 
Note: Timber cutters are using lease road to well and loading timber near this well.
 
|
 
|
 
|
 
|-
 
|-
 
| 110876213
 
| 2006-07-31
 
|
 
| Inspection revealed that the injection pressure is 300 psi and the annular pressure is 220 . No violations at this time .
 
|
 
|
 
|
 
|-
 
|-
 
| 1133574630
 
| 2013-10-29
 
|
 
| Well is down awaiting service rig to perform repair work on tubing and packer.
 
|
 
|
 
|
 
|-
 
|-
 
| 1275952473
 
| 2005-05-17
 
|
 
|  Inspection revealed that the injection pressure was 480 and the annulus pressure was 200 . No violations at this time .
 
|
 
|
 
|
 
|-
 
|-
 
| 1288i506
 
| 2002-04-10
 
|
 
|  Note : The well is a production well that is being converted into a salt water injection well  ( permit issued on  04 / 02 / 02 ) .  Bishop Well Services rig is pulling the rods and tubing  ( stripping job ) .  No violations at this time .
 
|
 
|
 
|
 
|-
 
|-
 
| 1288i541
 
| 2002-05-20
 
|
 
|  Appalachian Well Services is trying to get the casing to back off at 3215' ;  shot the casing twice with a light shot in an attempt to get the casing to back off at the collar at 3215' . Also tried to shoot and back off at 3023' once . Finally got the casing backed off , depth unknown at this time . I will check the site again tomorrow to see where the casing backed off .
 
|
 
|
 
|
 
|-
 
|-
 
| 1288i557
 
| 2002-05-27
 
|
 
|  The inspection revealed that they are building the tank pad and the dike area for the storage facility . No violations at this time .
 
|
 
|
 
|
 
|-
 
|-
 
| 1304293221
 
| 2012-10-05
 
|
 
| Inspection revealed that facility appears to be in satisfactory condition this inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| 1357928730
 
| 2006-11-15
 
|
 
| Inspection revealed that the injection pressure is 320 and the annulus pressure is 180 . No violations at this time .
 
|
 
|
 
|
 
|-
 
|-
 
| 1380115008
 
| 2013-09-25
 
|
 
| Inspection revealed that well is down awaiting on service rig to remove tubing and packer from well and then run casing scraper and then replace tubing and packer in well.
 
|
 
|
 
|
 
|-
 
|-
 
| 1384468883
 
| 2013-11-14
 
|
 
| Packer set at 5181' new tubing 4.7# per ft. top perforation@5274.'will pressure test tomorrow.
 
|
 
|
 
|
 
|-
 
|-
 
| 1395494463
 
| 2013-03-19
 
|
 
| Inspected site along with county inspector and it was noted that injection pump was in operation today.
 
Note: New I.D. tags have been posted on both wells at this facility.
 
|
 
|
 
|
 
|-
 
|-
 
| 142506317
 
| 2013-02-08
 
|
 
| Inspection revealed that clean up in tank area is complete after operator called and stated that they had blockage in crossover plumbing from 210 bbl tanks and tank had overrun approximately 2 bbl of oil from tank, all free standing oil has been cleaned up and outer tank has been clean and absorbent has been applied to affected area.
 
|
 
|
 
|
 
|-
 
|-
 
| 1483092378
 
| 2006-01-27
 
|
 
| Inspection revealed no violations at this time . Injection pressure is 800 and the annulus pressure is 1000 .
 
|
 
|
 
|
 
|-
 
|-
 
| 1511146964
 
| 2013-01-04
 
|
 
| Inspection revealed that injection pump was not in operation today and facility is in satisfactory condition this inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| 1514197844
 
| 2010-01-19
 
|
 
| Inspection revealed that they are injecting into the well at this time. Injection pressure at the wellhead is 475 PSI and the annulus pressure is 340 PSI. No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 1586759606
 
| 2007-03-29
 
|
 
| Inspection revealed that the injection pressure is 140 psi and the annulus pressure is 240 psi . No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 1674275868
 
| 2014-02-11
 
|
 
| On site to witness Universal Well Services pump off disk from bottom of packer and then perform 500 gallon acid job on well and once job was done well was shut in too let acid soak.
 
|
 
|
 
|
 
|-
 
|-
 
| 1742394343
 
| 2008-03-07
 
|
 
| Inspection revealed that the injection pressure is 400psi and the annulus is 850psi . No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 1838870106
 
| 2013-11-15
 
|
 
| On site to pressure test annulus of tubing Chipco Services(Corey's rig) they ran 5179' of new tubing and a new Baker Set Lock packer equipped with on/off tool and setting depth is 5181' to center of elements overall length of entire string is 5184.10,well was tested@1300# with no decline in pressure.
 
Note well was tested@1300# with hole fluid and once preliminary testing passed they unjayed from packer and they flushed annulus with 60 barrel of inhibitor laden fluid and once inhibitor was present we hooked back onto packer and performed final testing with no decline in pressure.
 
|
 
|
 
|
 
|-
 
|-
 
| 18476655
 
| 2008-09-08
 
|
 
| Inspection revealed the injection pressure is 550 PSI and the annular pressure is 445 PSI . No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 1899991315
 
| 2005-04-21
 
|
 
| Inspection revealed that the injection pressure is 520 PSI and the annulus pressure is 210 PSI . No violations at this time .
 
|
 
|
 
|
 
|-
 
|-
 
| 1912883724
 
| 2012-12-07
 
|
 
| Facility appears to be in satisfactory condition this inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| 1980152710
 
| 2005-01-27
 
|
 
|  Inspection revealed no violations at this time . Injection pressure was zero psi and the annulus was 200 psi . They are injecting into the #6 SWIW well at this time . They will start injecting back into this well 02/01/2005 . They alternate injection between the #6 and #7 well .
 
|
 
|
 
|
 
|-
 
|-
 
| 205629777
 
| 2008-02-06
 
|
 
| Inspection revealed that the injection pressure is 1150psi and the annulus pressure is 860psi. No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 398128426
 
| 2013-05-29
 
|
 
| Facility is in satisfactory condition this inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| 404733869
 
| 2006-02-21
 
|
 
| Inspection revealed no violations at this time . Injection pressure is 750 psi and the annulus pressure is 1000 .
 
|
 
|
 
|
 
|-
 
|-
 
| 657414761
 
| 2007-07-19
 
|
 
| Inspection revealed that the injection pressure is 150 psi and the annulus pressure is 220 psi. No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 842394882
 
| 2014-01-13
 
|
 
| Inspection revealed that well is not in operation at this time they are waiting on weather conditions to improve so they can get pump truck on site to blow off plug on bottom of tubing and then perform acid job on said well.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 908078842
 
| 908078842
 
| 2013-12-04
 
| 2013-12-04
|
+
|  
 
| Inspection revealed that injection operations have ceased this week due to deer season.
 
| Inspection revealed that injection operations have ceased this week due to deer season.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 956990243
 
| 956990243
 
| 2009-04-01
 
| 2009-04-01
|
+
|  
 
| Inspection revealed that the injection pressure is 500 PSI and the annulus pressure is 300 PSI . No violations at this time.
 
| Inspection revealed that the injection pressure is 500 PSI and the annulus pressure is 300 PSI . No violations at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -976868098
 +
| 2013-06-26
 +
|
 +
| Inspection revealed that well was not in operation during my inspection.
 +
Note: Fresh water in dike area needs to removed to allow for volume in the event of spill.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 13:03, 16 July 2015

Well Details

Well ID: 34-019-20326
Loading map...
County: Carroll
Municipality:
Operator Name: ENERVEST OPERATING L
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1968-11-29
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 40.60701408
Longitude: -81.26498282

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1984-0 662.0 336.0
1985-0 830.0 244.0
1986-0 353.0 89.0
1998-0 353.0 156.0
1999-0 47.0 39.0
2000-0 0.0 181.0
2001-0 74.0 131.0
2002-0 211.0 227.0
2003-0 0.0 507.0
2004-0 0.0 491.0
2005-0 0.0 865.0
2006-0 0.0 1050.0
2007-0 0.0 1096.0
2008-0 0.0 591.0
2010-0 0.0 0.0
2011-0 0.0 423.0
2012-0 0.0 152.0
2013-0 0.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1012232119 2010-02-26 Inspection revealed that the injection pressure is 550 PSI and the annulus pressure is 330 PSI . No violations at this time. Phone Call
-1012654515 2007-05-22 Inspection revealed that the injection pressure is 1100 psi and the annulus pressure is 240 psi . No violations at this time.
-1053664438 2008-06-03 Inspection revealed that the injection pressure is 600 PSI and the annular pressure is 500 PSI . They aren't injecting into the well at this time.
1081891408 2014-06-11 Inspection revealed that injection pump was not in operation during my inspection.

Note: Timber cutters are using lease road to well and loading timber near this well.

-1086716627 2009-01-23 Inspection revealed that the injection pressure is 400 PSI and the annulus pressure is 300 PSI . No violations at this time.
-1095137664 2010-05-10 Inspection revealed that the injection pressure is 700 PSI and the annulus pressure is 400 PSI. No violations at this time.
110876213 2006-07-31 Inspection revealed that the injection pressure is 300 psi and the annular pressure is 220 . No violations at this time .
1133574630 2013-10-29 Well is down awaiting service rig to perform repair work on tubing and packer.
1275952473 2005-05-17 Inspection revealed that the injection pressure was 480 and the annulus pressure was 200 . No violations at this time .
1288i506 2002-04-10 Note : The well is a production well that is being converted into a salt water injection well ( permit issued on 04 / 02 / 02 ) . Bishop Well Services rig is pulling the rods and tubing ( stripping job ) . No violations at this time .
1288i541 2002-05-20 Appalachian Well Services is trying to get the casing to back off at 3215' ; shot the casing twice with a light shot in an attempt to get the casing to back off at the collar at 3215' . Also tried to shoot and back off at 3023' once . Finally got the casing backed off , depth unknown at this time . I will check the site again tomorrow to see where the casing backed off .
1288i557 2002-05-27 The inspection revealed that they are building the tank pad and the dike area for the storage facility . No violations at this time .
1304293221 2012-10-05 Inspection revealed that facility appears to be in satisfactory condition this inspection.
-1348385758 2015-02-13 Inspection revealed that the two wells on this lease are not being used at this time.
1357928730 2006-11-15 Inspection revealed that the injection pressure is 320 and the annulus pressure is 180 . No violations at this time .
-1363695452 2013-03-08 Inspection revealed that injection pump was not in operation during my inspection.

Note: Walked flow line area going to well head to monitor for leaks none were found and I called company personnel to discuss replacing I.D. tags at wellhead and he stated he had new ones made and would place them at the well heads next week.

1380115008 2013-09-25 Inspection revealed that well is down awaiting on service rig to remove tubing and packer from well and then run casing scraper and then replace tubing and packer in well.
1384468883 2013-11-14 Packer set at 5181' new tubing 4.7# per ft. top perforation@5274.'will pressure test tomorrow.
1395494463 2013-03-19 Inspected site along with county inspector and it was noted that injection pump was in operation today.

Note: New I.D. tags have been posted on both wells at this facility.

-141132166 2008-06-18 Inspection revealed that the injection pressure is 810 PSI and the annular pressure is 500 PSI . No violations at this time.
142506317 2013-02-08 Inspection revealed that clean up in tank area is complete after operator called and stated that they had blockage in crossover plumbing from 210 bbl tanks and tank had overrun approximately 2 bbl of oil from tank, all free standing oil has been cleaned up and outer tank has been clean and absorbent has been applied to affected area.
-1459625585 2007-10-16 Inspection revealed that the injection pressure is 1140 PSI and the annulus pressure is 900 PSI . No violations at this time.
1483092378 2006-01-27 Inspection revealed no violations at this time . Injection pressure is 800 and the annulus pressure is 1000 .
1511146964 2013-01-04 Inspection revealed that injection pump was not in operation today and facility is in satisfactory condition this inspection.
-1513085965 2007-08-02 Inspection revealed that the injection pressure is 1070 PSI and the annulus pressure is 750 . No violations at this time.
1514197844 2010-01-19 Inspection revealed that they are injecting into the well at this time. Injection pressure at the wellhead is 475 PSI and the annulus pressure is 340 PSI. No violations at this time.
-1521585145 2005-12-27 Inspection revealed no violations at this time . Injection pressure is 800 and the annulus pressure is 1000.
-1566314287 2005-02-23 Inspection revealed that the operator is injecting into this well at this time . The injection pressure is 450 psi and the annulus pressure is 200 psi . No violations at this time .
1586759606 2007-03-29 Inspection revealed that the injection pressure is 140 psi and the annulus pressure is 240 psi . No violations at this time.
1674275868 2014-02-11 On site to witness Universal Well Services pump off disk from bottom of packer and then perform 500 gallon acid job on well and once job was done well was shut in too let acid soak.
-1710716399 2008-11-18 Inspection revealed that the injection pressure is 400 PSI and the annulus pressure is 910 PSI . No violations at this time.
1742394343 2008-03-07 Inspection revealed that the injection pressure is 400psi and the annulus is 850psi . No violations at this time.
-1757900278 2014-03-27 Inspection revealed that injection pump was not in operation today and it was noted that unloading pad has been steamed cleaned since my last inspection.
1838870106 2013-11-15 On site to pressure test annulus of tubing Chipco Services(Corey's rig) they ran 5179' of new tubing and a new Baker Set Lock packer equipped with on/off tool and setting depth is 5181' to center of elements overall length of entire string is 5184.10,well was tested@1300# with no decline in pressure.

Note well was tested@1300# with hole fluid and once preliminary testing passed they unjayed from packer and they flushed annulus with 60 barrel of inhibitor laden fluid and once inhibitor was present we hooked back onto packer and performed final testing with no decline in pressure.

18476655 2008-09-08 Inspection revealed the injection pressure is 550 PSI and the annular pressure is 445 PSI . No violations at this time.
-1853941203 2009-06-01 Inspection revealed that the injection pressure is 200 PSI and the annulus pressure is 580 PSI. No violations at this time.
-1879636218 2008-10-09 Inspection revealed that the injection pressure is 760 PSI and the annulus pressure is 920 PSI . No violations at this time
1899991315 2005-04-21 Inspection revealed that the injection pressure is 520 PSI and the annulus pressure is 210 PSI . No violations at this time .
1912883724 2012-12-07 Facility appears to be in satisfactory condition this inspection.
-1948492001 2008-07-09 Inspection revealed that the injection pressure is 590 PSI and the annular pressure is 730 PSI . No violations at this time.
-1953305719 2006-08-14 Inspection revealed that there is a hammer union on the wellhead dripping brine . I contacted Mike Leach and he advised that it would be repaired immediately . The injection pressure is 380 and the annular pressure is 210 . Returned to site later and the brine drip was repaired .
-1954567703 2007-06-18 Inspection revealed that the injection pressure is 1160 and the annulus pressure is 240 . No violations at this time.
1980152710 2005-01-27 Inspection revealed no violations at this time . Injection pressure was zero psi and the annulus was 200 psi . They are injecting into the #6 SWIW well at this time . They will start injecting back into this well 02/01/2005 . They alternate injection between the #6 and #7 well .
-1981029576 2009-07-23 Inspection revealed that the injection pressure is 900 PSI and the annulus pressure is 240 PSI. No violations at this time.
-199787451 2014-05-01 Inspection revealed that injection pump was not in operation today.

Note: Unloading pad has been steamed cleaned since my last inspection.

-2009941691 2009-08-11 Inspection revealed that the injection pressure is 520 PSI and the annulus pressure is 240 PSI. No violations at this time.
202466643 2014-10-06 Inspection revealed that injection pump was not in operation during my inspection and it was noted that owner has reclaimed site from recent work over project.
205629777 2008-02-06 Inspection revealed that the injection pressure is 1150psi and the annulus pressure is 860psi. No violations at this time.
-2126616318 2014-07-16 Inspected site along with two staff members from central office and it was determined that injection pump was not in operation today
-313333576 2007-12-20 Inspection revealed that the injection pressure is 450psi and the annulus pressure is 850 psi. No violations at this time.
396231400 2014-12-12 Inspection revealed that injection pump was not in operation during my inspection and it appears that this facility is not used much at this time.
398128426 2013-05-29 Facility is in satisfactory condition this inspection.
404733869 2006-02-21 Inspection revealed no violations at this time . Injection pressure is 750 psi and the annulus pressure is 1000 .
-500718937 2008-12-16 Inspection revealed that the injection pressure is 800 PSI and the annulus pressure is 920 PSI . No violations at this time.
-537192896 2010-04-07 Inspection revealed that the injection pressure is 500 PSI and the annulus pressure is 770 PSI . No violations at this time. Injection pump not running at this time. NOTE: The annulus pressure has increased from 330 PSI to 770 PSI since the last inspection on 02/26/2010.
58200469 2015-05-11 Inspection revealed that injection pump was not in operation today.

Note: Called Mike Burkhart company rep requesting that he have 2 valve on oil tank replaced ASAP.

-59927238 2009-05-06 Inspection revealed that the injection pressure is 240 PSI and the annular pressure is 580 PSI. No violations at this time.
-636946494 2007-09-10 Inspection revealed that the injection pressure is 300 PSI and the annulus pressure is 750 PSI. No violations at this time.
-641545335 2006-05-04 Inspection revealed that the injection pressure is 180 psi and the annulus pressure is 440 psi ; they are not injecting into this well at this time . No violations at this time .
-654080793 2013-08-02 Inspection revealed that well is not in operation at this time, tank area is clean and neat and identification is posted at well head and flow line area is free of leakage.
657414761 2007-07-19 Inspection revealed that the injection pressure is 150 psi and the annulus pressure is 220 psi. No violations at this time.
-658322120 2006-06-08 Inspection revealed no violations at this time . Injection pressure is 240 psi and annulus pressure is 420 psi .
-702233813 2008-01-09 Inspection revealed that the injection pressure is 500psi and the annulus pressure is 840psi. No violations at this time.
-740296455 2012-06-20 I am checking this well as requested by UIC Supervisor Tom Tomastik and DNR Deputy Chief Bob Worstall. I found this well in operation with no violations at this time.
-837401372 2010-06-09 Inspection revealed that the injection pressure is 650 PSI and the annulus pressure is 390 PSI. No violations at this time.
842394882 2014-01-13 Inspection revealed that well is not in operation at this time they are waiting on weather conditions to improve so they can get pump truck on site to blow off plug on bottom of tubing and then perform acid job on said well.
-844909984 2009-11-03 Inspection revealed that the injection pressure is 600 PSI and the annular pressure is 350 PSI. No violations at this time.
873793297 2014-11-19 Inspection revealed that injection pump was not in operation today.
-886365456 2005-08-10 Inspection revealed that the injection pressure was 20 and the annulus pressure was 200 . No violations at this time .
908078842 2013-12-04 Inspection revealed that injection operations have ceased this week due to deer season.
956990243 2009-04-01 Inspection revealed that the injection pressure is 500 PSI and the annulus pressure is 300 PSI . No violations at this time.
-976868098 2013-06-26 Inspection revealed that well was not in operation during my inspection.

Note: Fresh water in dike area needs to removed to allow for volume in the event of spill.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.