X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0424220112000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0424220112000
 
| Well ID: 0424220112000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.58694000000002688, -113.04640699999998787 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.58694, -113.046407 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/12-01-042-22W4/0
 
| Location: 00/12-01-042-22W4/0
 +
|-
 +
| Location Alias: 00/12-01-42-22 W4M
 +
|-
 +
| Location Alias 2: 00/12-01-042-22 W4/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Camrose County,_Alberta|Camrose County]]
 
|-
 
|-
 
| Well Name: EMBER BASHAW 12-1-42-22
 
| Well Name: EMBER BASHAW 12-1-42-22
 +
|-
 +
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0344659
 
|-
 
|-
 
| License Date: 2005-12-07
 
| License Date: 2005-12-07
 
|-
 
|-
| Final Drilling Date: 2006-01-30
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2005-12-21
 +
|-
 +
| Final Drill Date: 2006-01-30
 +
|-
 +
| Well Total Depth: 693 m
 +
|-
 +
| Surface Hole Latitude: 52.58694
 +
|-
 +
| Surface Hole Longitude: -113.046407
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 345
 +
| style="text-align: right;" | 345.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 339
 +
| style="text-align: right;" | 340
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 323
 +
| style="text-align: right;" | 324
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 319
 +
| style="text-align: right;" | 319.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 317.5
 +
| style="text-align: right;" | 318
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 305.5
 +
| style="text-align: right;" | 306.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 289
 +
| style="text-align: right;" | 292
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 264
 +
| style="text-align: right;" | 265
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 260
 +
| style="text-align: right;" | 261
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 254
 +
| style="text-align: right;" | 254.5
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 693.0m
+
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 246.5
 +
| style="text-align: right;" | 247
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Coalbed Methane-Coals and Oth
+
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 235
 +
| style="text-align: right;" | 235.5
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Status: Flowing
+
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 231.5
 +
| style="text-align: right;" | 232.5
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Well Type: Not Applicable
+
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 229
 +
| style="text-align: right;" | 229.5
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 224
 +
| style="text-align: right;" | 225
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Latitude: 52.58694000000002688
+
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 219
 +
| style="text-align: right;" | 220
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -113.04640699999998787
+
| 2006-02-10
 +
| Perforation
 +
| style="text-align: right;" | 215
 +
| style="text-align: right;" | 216
 +
| style="text-align: right;" | 13
 
|-
 
|-
 +
| 2006-03-05
 +
| Fracture
 +
| style="text-align: right;" | 215
 +
| style="text-align: right;" | 345.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-10-05
 +
| Perforation
 +
| style="text-align: right;" | 287.5
 +
| style="text-align: right;" | 288.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-10-05
 +
| Perforation
 +
| style="text-align: right;" | 286
 +
| style="text-align: right;" | 287
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2007-10-05
 +
| Perforation
 +
| style="text-align: right;" | 281.2
 +
| style="text-align: right;" | 281.7
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2007-10-05
 +
| Perforation
 +
| style="text-align: right;" | 276
 +
| style="text-align: right;" | 278
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2007-10-16
 +
| Fracture
 +
| style="text-align: right;" | 305.5
 +
| style="text-align: right;" | 345.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-10-16
 +
| Fracture
 +
| style="text-align: right;" | 287.5
 +
| style="text-align: right;" | 292
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-10-16
 +
| Fracture
 +
| style="text-align: right;" | 215
 +
| style="text-align: right;" | 265
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-10-16
 +
| Fracture
 +
| style="text-align: right;" | 276
 +
| style="text-align: right;" | 287
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 4341
 +
| style="text-align: right;" | 441.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2007
 +
| style="text-align: right;" | 8748
 +
| style="text-align: right;" | 610.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2008
 +
| style="text-align: right;" | 8769
 +
| style="text-align: right;" | 887.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 8731
 +
| style="text-align: right;" | 691.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1.5
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8751
 +
| style="text-align: right;" | 580.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.2
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 8756
 +
| style="text-align: right;" | 552.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8778
 +
| style="text-align: right;" | 413.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2.9
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8732
 +
| style="text-align: right;" | 381.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8754
 +
| style="text-align: right;" | 388.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8716
 +
| style="text-align: right;" | 406.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1.6
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8721
 +
| style="text-align: right;" | 256.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1.6
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8730
 +
| style="text-align: right;" | 258.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8717
 +
| style="text-align: right;" | 230.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 2159
 +
| style="text-align: right;" | 47.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 22:45, 6 June 2019

Well Details

Well ID: 0424220112000
Loading map...
Location: 00/12-01-042-22W4/0
Location Alias: 00/12-01-42-22 W4M
Location Alias 2: 00/12-01-042-22 W4/00
Province: Alberta
County/Municipality: Camrose County
Well Name: EMBER BASHAW 12-1-42-22
Operator Name: Ember Resources Inc.
License Number: 0344659
License Date: 2005-12-07
License Status: Issued
Spud Date: 2005-12-21
Final Drill Date: 2006-01-30
Well Total Depth: 693 m
Surface Hole Latitude: 52.58694
Surface Hole Longitude: -113.046407

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-10 Perforation 345 345.5 13
2006-02-10 Perforation 339 340 13
2006-02-10 Perforation 323 324 13
2006-02-10 Perforation 319 319.5 13
2006-02-10 Perforation 317.5 318 13
2006-02-10 Perforation 305.5 306.5 13
2006-02-10 Perforation 289 292 13
2006-02-10 Perforation 264 265 13
2006-02-10 Perforation 260 261 13
2006-02-10 Perforation 254 254.5 13
2006-02-10 Perforation 246.5 247 13
2006-02-10 Perforation 235 235.5 13
2006-02-10 Perforation 231.5 232.5 13
2006-02-10 Perforation 229 229.5 13
2006-02-10 Perforation 224 225 13
2006-02-10 Perforation 219 220 13
2006-02-10 Perforation 215 216 13
2006-03-05 Fracture 215 345.5 0
2007-10-05 Perforation 287.5 288.5 13
2007-10-05 Perforation 286 287 20
2007-10-05 Perforation 281.2 281.7 20
2007-10-05 Perforation 276 278 20
2007-10-16 Fracture 305.5 345.5 0
2007-10-16 Fracture 287.5 292 0
2007-10-16 Fracture 215 265 0
2007-10-16 Fracture 276 287 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4341 441.5 0.0 0.0
2007 8748 610.1 0.0 0.0
2008 8769 887.3 0.0 0.0
2009 8731 691.2 0.0 1.5
2010 8751 580.9 0.0 0.2
2011 8756 552.5 0.0 0.0
2012 8778 413.0 0.0 2.9
2013 8732 381.9 0.0 0.0
2014 8754 388.9 0.0 0.0
2015 8716 406.7 0.0 1.6
2016 8721 256.0 0.0 1.6
2017 8730 258.8 0.0 0.0
2018 8717 230.6 0.0 0.0
2019 2159 47.2 0.0 0.0

For data sources see[4]

References