X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0524262712002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0524262712002
 
| Well ID: 0524262712002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.52124500000002172, -113.75937799999996969 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.521245, -113.759378 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/12-27-052-26W4/2
 
| Location: 00/12-27-052-26W4/2
 +
|-
 +
| Location Alias: 00/12-27-52-26 W4M
 +
|-
 +
| Location Alias 2: 00/12-27-052-26 W4/02
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Parkland County,_Alberta|Parkland County]]
 
|-
 
|-
 
| Well Name: CENTRAL LEDUC WILD NO. 1 WELL
 
| Well Name: CENTRAL LEDUC WILD NO. 1 WELL
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0001842
 
|-
 
|-
 
| License Date: 1950-08-04
 
| License Date: 1950-08-04
 
|-
 
|-
| Final Drilling Date: 1950-09-17
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1950-08-09
 +
|-
 +
| Final Drill Date: 1950-09-17
 +
|-
 +
| Well Total Depth: 1565.1 m
 +
|-
 +
| Surface Hole Latitude: 53.521245
 +
|-
 +
| Surface Hole Longitude: -113.759378
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1950-09-18
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1559.1
 +
| style="text-align: right;" | 1561.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1950-11-29
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1559.1
 +
| style="text-align: right;" | 1561.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1950-12-02
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1562.4
 +
| style="text-align: right;" | 1563
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1950-12-04
 +
| Acid Treatment
 +
| style="text-align: right;" | 1562.4
 +
| style="text-align: right;" | 1563
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1950-12-04
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1562.4
 +
| style="text-align: right;" | 1563
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1950-12-07
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1559.7
 +
| style="text-align: right;" | 1560
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1950-12-09
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1560
 +
| style="text-align: right;" | 1560.3
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1950-12-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1559.7
 +
| style="text-align: right;" | 1560.3
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1950-12-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1560.3
 +
| style="text-align: right;" | 1560.6
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1950-12-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1559.7
 +
| style="text-align: right;" | 1560.6
 +
| style="text-align: right;" | 10
 +
|-
 +
| 1950-12-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1560.6
 +
| style="text-align: right;" | 1560.9
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1950-12-14
 +
| Perforation
 +
| style="text-align: right;" | 1560.6
 +
| style="text-align: right;" | 1560.9
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 1565.1m
+
| 1950-12-14
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1560.6
 +
| style="text-align: right;" | 1560.9
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1951-01-07
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1560.9
 +
| style="text-align: right;" | 1561.2
 +
| style="text-align: right;" | 20
 
|-
 
|-
| Status: Abandoned
+
| 1962-05-24
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1524
 +
| style="text-align: right;" | 1524
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 1962-05-25
 +
| Perforation
 +
| style="text-align: right;" | 1275.6
 +
| style="text-align: right;" | 1275.9
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 1962-05-26
 +
| Acid Treatment
 +
| style="text-align: right;" | 1275.6
 +
| style="text-align: right;" | 1275.9
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 53.52124500000002172
+
| 1962-05-29
 +
| Perforation
 +
| style="text-align: right;" | 1275.9
 +
| style="text-align: right;" | 1276.8
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -113.75937799999996969
+
| 1990-10-02
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1262
 +
| style="text-align: right;" | 1270
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 33.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 623.2
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 123.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 770.1
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 52.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1301.0
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 5.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 130.3
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 16:19, 7 June 2019

Well Details

Well ID: 0524262712002
Loading map...
Location: 00/12-27-052-26W4/2
Location Alias: 00/12-27-52-26 W4M
Location Alias 2: 00/12-27-052-26 W4/02
Province: Alberta
County/Municipality: Parkland County
Well Name: CENTRAL LEDUC WILD NO. 1 WELL
Operator Name:
License Number: 0001842
License Date: 1950-08-04
License Status: RecCertified
Spud Date: 1950-08-09
Final Drill Date: 1950-09-17
Well Total Depth: 1565.1 m
Surface Hole Latitude: 53.521245
Surface Hole Longitude: -113.759378

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-18 Open Hole/Barefoot Completion 1559.1 1561.5 0
1950-11-29 Cement Squeeze 1559.1 1561.5 0
1950-12-02 Bullet Perforation 1562.4 1563 13
1950-12-04 Acid Treatment 1562.4 1563 0
1950-12-04 Cement Squeeze 1562.4 1563 0
1950-12-07 Bullet Perforation 1559.7 1560 13
1950-12-09 Bullet Perforation 1560 1560.3 13
1950-12-10 Bullet Perforation 1559.7 1560.3 13
1950-12-10 Bullet Perforation 1560.3 1560.6 13
1950-12-10 Bullet Perforation 1559.7 1560.6 10
1950-12-10 Bullet Perforation 1560.6 1560.9 16
1950-12-14 Perforation 1560.6 1560.9 13
1950-12-14 Bullet Perforation 1560.6 1560.9 13
1951-01-07 Bullet Perforation 1560.9 1561.2 20
1962-05-24 Packing Device Capped w/Cement 1524 1524 0
1962-05-25 Perforation 1275.6 1275.9 13
1962-05-26 Acid Treatment 1275.6 1275.9 0
1962-05-29 Perforation 1275.9 1276.8 13
1990-10-02 Packing Device Capped w/Cement 1262 1270 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 33.5 0.0 623.2
1963 0 123.6 0.0 770.1
1964 0 52.4 0.0 1301.0
1965 0 5.2 0.0 130.3

For data sources see[4]

References