If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Ashtabula_County,_Ohio|Ashtabula]] | | County: [[Ashtabula_County,_Ohio|Ashtabula]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Morgan Township,_Ashtabula_County,_Ohio|Morgan Township]] |
|- | |- | ||
| Operator Name: [[RHDK OIL & GAS LLC/DBA RED HIL]] | | Operator Name: [[RHDK OIL & GAS LLC/DBA RED HIL]] |
Well ID: 34-007-23909 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.683688968,"lon":-80.87354483,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashtabula | |
Municipality: Morgan Township | |
Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
Well Pad ID: | |
Farm/Lease Name: GREATER CLEVELAND COUNCIL BSA | |
License Status: Producing | |
License Date: 1990-03-28 | |
Spud Date: 1990-05-10 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1990-05-16 | |
Well Total Depth: 6139 ft | |
Configuration: Vertical | |
Latitude: 41.683688968 | |
Longitude: -80.87354483 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1990-03-28 | 168 RED HILL DEVELOPMENT GeoDate 3/28/90 |
Oil and Gas | 1990-03-28 | Issued Date 3/28/90 Expired Date 3/28/91 Acres 0640000 Tool Type CRAF Proposed Formation DOR/CL/RSRN Proposed Depth 06139 Proposed Drill Depth 06139 |
Original Spud | 1990-05-09 | Hi Jerry,
This well just came to my attention. Please inspect when you are next in the area. It was drilled by Red Hill to the Rose Run (dry) and plugged back to the Clinton. They have never reported any production on it and supposedly they lost the lease to Belvoir because they did not continue to drill wells. I suspect this well may be sitting idle; it is still under Red Hill's bond. They may need a NOV to do something about this well. Let me know what you find out. Thanks, Mike 12/09/05 |
Completed | 1990-05-16 | Hi Jerry,
This well just came to my attention. Please inspect when you are next in the area. It was drilled by Red Hill to the Rose Run (dry) and plugged back to the Clinton. They have never reported any production on it and supposedly they lost the lease to Belvoir because they did not continue to drill wells. I suspect this well may be sitting idle; it is still under Red Hill's bond. They may need a NOV to do something about this well. Let me know what you find out. Thanks, Mike 12/09/05 |
Plugged Back | 1990-05-16 | Hi Jerry,
This well just came to my attention. Please inspect when you are next in the area. It was drilled by Red Hill to the Rose Run (dry) and plugged back to the Clinton. They have never reported any production on it and supposedly they lost the lease to Belvoir because they did not continue to drill wells. I suspect this well may be sitting idle; it is still under Red Hill's bond. They may need a NOV to do something about this well. Let me know what you find out. Thanks, Mike 12/09/05 |
Reached Total Depth | 1990-05-16 | Hi Jerry,
This well just came to my attention. Please inspect when you are next in the area. It was drilled by Red Hill to the Rose Run (dry) and plugged back to the Clinton. They have never reported any production on it and supposedly they lost the lease to Belvoir because they did not continue to drill wells. I suspect this well may be sitting idle; it is still under Red Hill's bond. They may need a NOV to do something about this well. Let me know what you find out. Thanks, Mike 12/09/05 |
Completion Report Received | 1990-08-21 | Hi Jerry,
This well just came to my attention. Please inspect when you are next in the area. It was drilled by Red Hill to the Rose Run (dry) and plugged back to the Clinton. They have never reported any production on it and supposedly they lost the lease to Belvoir because they did not continue to drill wells. I suspect this well may be sitting idle; it is still under Red Hill's bond. They may need a NOV to do something about this well. Let me know what you find out. Thanks, Mike 12/09/05 |
Construction Permit Expires | 1991-03-28 | Hi Jerry,
This well just came to my attention. Please inspect when you are next in the area. It was drilled by Red Hill to the Rose Run (dry) and plugged back to the Clinton. They have never reported any production on it and supposedly they lost the lease to Belvoir because they did not continue to drill wells. I suspect this well may be sitting idle; it is still under Red Hill's bond. They may need a NOV to do something about this well. Let me know what you find out. Thanks, Mike 12/09/05 |
Record Last Modified | 2015-09-24 | Hi Jerry,
This well just came to my attention. Please inspect when you are next in the area. It was drilled by Red Hill to the Rose Run (dry) and plugged back to the Clinton. They have never reported any production on it and supposedly they lost the lease to Belvoir because they did not continue to drill wells. I suspect this well may be sitting idle; it is still under Red Hill's bond. They may need a NOV to do something about this well. Let me know what you find out. Thanks, Mike 12/09/05 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3218 | 3332 | 0 |
2006-09-11 | 3255 | 3322 | 6 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 71600 Gal | 0 | SLICKWATER FRAC-N2 ASSIST | ||
N2 | 0 | 162 Mscf | 0 | 21.6 BPM |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1995 | RHDK OIL & GAS LLC/DBA RED HIL | 0 | 0 | 365 |
2010 | RHDK OIL & GAS LLC/DBA RED HIL | 0 | 0 | 365 |
2011 | RHDK OIL & GAS LLC/DBA RED HIL | 0 | 0 | 365 |
2014 | RHDK OIL & GAS LLC/DBA RED HIL | 0 | 0 | 0 |
2016 | RHDK OIL & GAS LLC/DBA RED HIL | 0 | 0 | 0 |
2017 | RHDK OIL & GAS LLC/DBA RED HIL | 0 | 0 | 365 |
2018 | RHDK OIL & GAS LLC/DBA RED HIL | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1995 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 0 | 365 |
2010 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 0 | 365 |
2011 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 0 | 365 |
2014 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 0 | 0 |
2016 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 0 | 0 |
2017 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 0 | 365 |
2018 | RHDK OIL & GAS LLC/DBA RED HIL | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1415814931 | 2014-11-04 | Exempt Well Pre Transfer | No Violations | I inspected this well in response to a request from Erica Freeman in the Columbus office to determine the current use of the well. My inspection found the well is equipped with a pumping unit and one 210 barrel steel tank and one separator. I spoke with Bill Roloff [ On Site Property Manager ], He told me the well is only for domestic production for the cabins on the property. There are no compliance issues with this well. |
2126486975 | 2003-04-15 | Preliminary Restoration | No Violations | Restoration approved . |
For data sources see[9]