X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-21455"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-21455
 
| Well ID: 37-003-21455
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.525958, -79.819204 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.525958, -79.819204 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 03/16/2000
+
| Spud Date: 2000-03-16
 
|-
 
|-
| Permit Date: 3/13/2000
+
| Permit Date: 2000-03-13
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 191
 
| style="text-align: right;" | 191
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
Line 83: Line 108:
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 146: Line 171:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 155: Line 180:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 164: Line 189:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 173: Line 198:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 182: Line 207:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 191: Line 216:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 200: Line 225:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 209: Line 234:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 223: Line 248:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 228: Line 254:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2000-0
+
| 2000
 +
| [[HUNTLEY & HUNTLEY INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 900.00 Bbl
 
| style="text-align: right;" | 900.00 Bbl
Line 253: Line 280:
 
| 1003938
 
| 1003938
 
| Primary Facility
 
| Primary Facility
| 01/30/2001
+
| 2001-01-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 260: Line 287:
 
| 1056075
 
| 1056075
 
| Primary Facility
 
| Primary Facility
| 07/26/2001
+
| 2001-07-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 267: Line 294:
 
| 1722006
 
| 1722006
 
| Primary Facility
 
| Primary Facility
| 07/17/2008
+
| 2008-07-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 274: Line 301:
 
| 930181
 
| 930181
 
| Primary Facility
 
| Primary Facility
| 03/23/2000
+
| 2000-03-23
 
| Complaint Inspection
 
| Complaint Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 281: Line 308:
 
| 930444
 
| 930444
 
| Primary Facility
 
| Primary Facility
| 04/11/2000
+
| 2000-04-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 288: Line 315:
 
| 931796
 
| 931796
 
| Primary Facility
 
| Primary Facility
| 03/24/2000
+
| 2000-03-24
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 295: Line 322:
 
| 934883
 
| 934883
 
| Primary Facility
 
| Primary Facility
| 04/07/2000
+
| 2000-04-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 302: Line 329:
 
| 934884
 
| 934884
 
| Primary Facility
 
| Primary Facility
| 04/03/2000
+
| 2000-04-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 309: Line 336:
 
| 952555
 
| 952555
 
| Primary Facility
 
| Primary Facility
| 07/20/2000
+
| 2000-07-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 328: Line 355:
 
| 236173
 
| 236173
 
| 03/23/2000
 
| 03/23/2000
| 03/23/2000
+
| 2000-03-23
 
| 78.60B - Tophole water discharged improperly
 
| 78.60B - Tophole water discharged improperly
 
| Administrative
 
| Administrative
Line 336: Line 363:
 
| 237999
 
| 237999
 
| 03/23/2000
 
| 03/23/2000
| 03/23/2000
+
| 2000-03-23
 
| 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
 
| 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 358: Line 385:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/27/2000
+
| 2000-03-27
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 366: Line 393:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/25/2000
+
| 2000-04-25
| 05/03/2000
+
| 2000-05-03
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
Line 376: Line 403:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/27/2000
+
| 2000-03-27
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 384: Line 411:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/25/2000
+
| 2000-04-25
| 05/03/2000
+
| 2000-05-03
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
Line 394: Line 421:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/27/2000
+
| 2000-03-27
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 402: Line 429:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/25/2000
+
| 2000-04-25
| 05/03/2000
+
| 2000-05-03
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
Line 412: Line 439:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/27/2000
+
| 2000-03-27
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 420: Line 447:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/25/2000
+
| 2000-04-25
| 05/03/2000
+
| 2000-05-03
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
 
| style="text-align: right;" | $5,300.00
Line 432: Line 459:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 05:50, 19 August 2019

Well Details

Well ID: 37-003-21455
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Plum Borough
Operator Name: HUNTLEY & HUNTLEY INC
Well Pad ID:
Farm/Lease Name: FRANK FURKO 1
License Status: Active
Spud Date: 2000-03-16
Permit Date: 2000-03-13
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.525958
Longitude: -79.819204

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2000 HUNTLEY & HUNTLEY INC 44,806.00 191 0.00 0 0.00 0
2001 HUNTLEY & HUNTLEY INC 56,774.00 365 0.00 0 0.00 0
2002 HUNTLEY & HUNTLEY INC 43,121.00 361 0.00 0 0.00 0
2003 HUNTLEY & HUNTLEY INC 32,007.00 365 0.00 0 0.00 0
2005 HUNTLEY & HUNTLEY INC 22,989.00 365 0.00 0 0.00 0
2006 HUNTLEY & HUNTLEY INC 20,725.00 365 0.00 0 0.00 0
2008 HUNTLEY & HUNTLEY INC 15,835.00 365 0.00 0 0.00 0
2009 HUNTLEY & HUNTLEY INC 13,497.00 365 0.00 0 0.00 0
2010 HUNTLEY & HUNTLEY INC 13,320.00 365 0.00 0 0.00 0
2011 HUNTLEY & HUNTLEY INC 10,889.00 365 0.00 0 0.00 0
2012 HUNTLEY & HUNTLEY INC 11,799.00 366 0.00 0 0.00 0
2013 HUNTLEY & HUNTLEY INC 11,766.74 365 0.00 0 0.00 0
2014 HUNTLEY & HUNTLEY INC 10,697.00 365 0.00 0 0.00 0
2015 HUNTLEY & HUNTLEY INC 9,909.00 365 0.00 0 0.00 0
2016 HUNTLEY & HUNTLEY INC 8,771.00 366 0.00 0 0.00 0
2017 HUNTLEY & HUNTLEY INC 7,127.00 365 0.00 0 0.00 0
2018 HUNTLEY & HUNTLEY INC 7,945.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2000 HUNTLEY & HUNTLEY INC Brine 900.00 Bbl Brine or Industrial Waste Treatment Plt

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1003938 Primary Facility 2001-01-30 Routine/Complete Inspection No Violations Noted operating well
1056075 Primary Facility 2001-07-26 Routine/Complete Inspection No Violations Noted prod to line 1 tank no prob e&s ok
1722006 Primary Facility 2008-07-17 Routine/Complete Inspection No Violations Noted well producing, 1 tank on location, no problems
930181 Primary Facility 2000-03-23 Complaint Inspection Violation(s) Noted discharge of top hole water to stream
930444 Primary Facility 2000-04-11 Drilling/Alteration No Violations Noted Site ID and E&S Plan are at hand. Wellhead is established w/pit containment, freeboard ok. Lining OK. Downgrade: Open grass field with slow drainage. Topsoil: piled for reclamation. Old B.&L.E.grade is near access entrance w/some buried ties.
931796 Primary Facility 2000-03-24 Compliance Evaluation No Violations Noted INSPECT W/MANGINI/HILDEBRAND
934883 Primary Facility 2000-04-07 Routine/Complete Inspection No Violations Noted FRAC WELL
934884 Primary Facility 2000-04-03 Routine/Complete Inspection No Violations Noted PERF AND SPOT ACID
952555 Primary Facility 2000-07-20 Routine/Complete Inspection No Violations Noted Loc.: Hulton Rd. at Turnpike crossing. Equipt. storage area is butressed with pinned square tie wall as an embankment in landscaping. Well is tagged, equipped, producing to Equitable. Mulched and seeded area of restoration.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
930181 236173 03/23/2000 2000-03-23 78.60B - Tophole water discharged improperly Administrative
930181 237999 03/23/2000 2000-03-23 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
236173 50763 NOV - Notice of Violation Comply/Closed 2000-03-27
236173 50764 CACP - Consent Assessment of Civil Penalty Comply/Closed 2000-04-25 2000-05-03 $5,300.00 $5,300.00
236173 50766 NOV - Notice of Violation Comply/Closed 2000-03-27
236173 50767 CACP - Consent Assessment of Civil Penalty Comply/Closed 2000-04-25 2000-05-03 $5,300.00 $5,300.00
237999 50763 NOV - Notice of Violation Comply/Closed 2000-03-27
237999 50764 CACP - Consent Assessment of Civil Penalty Comply/Closed 2000-04-25 2000-05-03 $5,300.00 $5,300.00
237999 50766 NOV - Notice of Violation Comply/Closed 2000-03-27
237999 50767 CACP - Consent Assessment of Civil Penalty Comply/Closed 2000-04-25 2000-05-03 $5,300.00 $5,300.00

For data sources see[6]

References