X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0354222206020"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0354222206020
 
| Well ID: 0354222206020
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.01863700000001245, -113.06570799999997234 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.018637, -113.065708 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/06-22-035-22W4/0
 
| Location: 02/06-22-035-22W4/0
 +
|-
 +
| Location Alias: 02/06-22-35-22 W4M
 +
|-
 +
| Location Alias 2: 02/06-22-035-22 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 035
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 22
 +
|-
 +
| Section: 22
 +
|-
 +
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
 
|-
 
|-
 
| Well Name: RENAISSANCE 02 ELNORA 6-22-35-22
 
| Well Name: RENAISSANCE 02 ELNORA 6-22-35-22
 +
|-
 +
| Operator Name: [[Husky Oil Operations Limited]]
 +
|-
 +
| License Number: 0119909
 
|-
 
|-
 
| License Date: 1985-12-02
 
| License Date: 1985-12-02
 
|-
 
|-
| Final Drilling Date: 1985-12-07
+
| License Status: RecCertified
 
|-
 
|-
| Total Depth: 1570.0m
+
| Spud Date: 1985-11-25
 
|-
 
|-
| Fluid Type: Not Applicable
+
| Final Drill Date: 1985-12-07
 
|-
 
|-
| Status: Abandoned
+
| Well Total Depth: 1570.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 52.018637
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -113.065708
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1985-11-27
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-12-02
 +
| Obtained License
 +
|-
 +
| 1985-12-07
 +
| Finished Drilling
 +
|-
 +
| 1985-12-08
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-12-08
 +
| Well Log Performed
 +
|-
 +
| 1985-12-09
 +
| Drill Stem Test Performed
 
|-
 
|-
| Latitude: 52.01863700000001245
+
| 1985-12-10
 +
| Drill Stem Test Performed
 
|-
 
|-
| Longitude: -113.06570799999997234
+
| 1985-12-11
 +
| Production Casing Operation Performed
 
|-
 
|-
 +
| 1985-12-11
 +
| Rig Released
 +
|-
 +
| 1985-12-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-12-30
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1986-01-06
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1997-01-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1997-01-23
 +
| Plug Back Performed
 +
|-
 +
| 1997-01-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-01-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-01-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-01-26
 +
| Plug Back Performed
 +
|-
 +
| 2000-01-27
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2000-02-04
 +
| Well Abandoned
 +
|-
 +
| 2000-02-04
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1985-12-23
 +
| Perforation
 +
| style="text-align: right;" | 1543.00
 +
| style="text-align: right;" | 1548.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1985-12-23
 +
| Perforation
 +
| style="text-align: right;" | 1530.00
 +
| style="text-align: right;" | 1532.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1985-12-30
 +
| Fracture
 +
| style="text-align: right;" | 1530.00
 +
| style="text-align: right;" | 1548.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-01-23
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1533.00
 +
| style="text-align: right;" | 1541.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-01-25
 +
| Fracture
 +
| style="text-align: right;" | 1530.00
 +
| style="text-align: right;" | 1532.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-01-26
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1517.00
 +
| style="text-align: right;" | 1525.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-01-26
 +
| Perforation
 +
| style="text-align: right;" | 320.00
 +
| style="text-align: right;" | 321.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2000-01-27
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 320.00
 +
| style="text-align: right;" | 321.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 16:34, 13 July 2020

Well Details

Well ID: 0354222206020
Loading map...
Location: 02/06-22-035-22W4/0
Location Alias: 02/06-22-35-22 W4M
Location Alias 2: 02/06-22-035-22 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 22
County/Municipality: Red Deer County
Well Name: RENAISSANCE 02 ELNORA 6-22-35-22
Operator Name: Husky Oil Operations Limited
License Number: 0119909
License Date: 1985-12-02
License Status: RecCertified
Spud Date: 1985-11-25
Final Drill Date: 1985-12-07
Well Total Depth: 1570.00 m
Surface Hole Latitude: 52.018637
Surface Hole Longitude: -113.065708

For data sources see[1][2]

Well History

Date Event
1985-11-27 Surface Casing Operation Performed
1985-12-02 Obtained License
1985-12-07 Finished Drilling
1985-12-08 Drill Stem Test Performed
1985-12-08 Well Log Performed
1985-12-09 Drill Stem Test Performed
1985-12-10 Drill Stem Test Performed
1985-12-11 Production Casing Operation Performed
1985-12-11 Rig Released
1985-12-23 Perforation Treatment Performed - Jet Perforation
1985-12-30 Perforation Treatment Performed - Fractured
1986-01-06 Well Mode changed to Drilled and Cased
1997-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-23 Plug Back Performed
1997-01-25 Perforation Treatment Performed - Fractured
2000-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-26 Perforation Treatment Performed - Jet Perforation
2000-01-26 Plug Back Performed
2000-01-27 Perforation Treatment Performed - Remedial Casing
2000-02-04 Well Abandoned
2000-02-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-23 Perforation 1543.00 1548.00 13
1985-12-23 Perforation 1530.00 1532.00 13
1985-12-30 Fracture 1530.00 1548.00 0
1997-01-23 Packing Device Capped w/Cement 1533.00 1541.00 0
1997-01-25 Fracture 1530.00 1532.00 0
2000-01-26 Packing Device Capped w/Cement 1517.00 1525.00 0
2000-01-26 Perforation 320.00 321.00 13
2000-01-27 Remedial Casing Cementing 320.00 321.00 0

For data sources see[4]



References