If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 351: | Line 351: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-005-30859 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.787647,"lon":-79.596958,"icon":""}]} |
County: Armstrong | |
Municipality: North Buffalo Township | |
Operator Name: MDS ENERGY LTD | |
Well Pad ID: 146264 | |
Farm/Lease Name: JACK G YOUNKINS ETUX 1M-15 | |
First Permit Date: 2011-08-23 | |
Last Permit Date: 2011-08-23 | |
Spud Date: 2011-12-06 | |
Unconventional: Yes | |
Horizontal: No | |
Producing: Yes | |
Violations: None | |
Latitude: 40.787647 | |
Longitude: -79.596958 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1997032 | 2011-08-11 | No Violations Noted | Operator submitted Permit Application for Drilling or Altering a Well (drilled within 200 feet from any existing building) dated 07-07-11.
When drilling below surface casing, require choke lines, pump-out sub to be installed on bottom hole assembly, and standby access to kill-fluids. Per 78.72. Use of safety devices - blow-out prevention equipment., Operator shall use blow-out prevention equipment after setting casing with a competent casing seat when drilling within 200 feet of a building. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan. |
|
2025279 | 2011-12-09 | No Violations Noted | Drill rig located onsite, drilling was not ongoing at the time of the inspection. Drill pit located onsite and it contained drill cuttings and fluids. Pit had more than the required two feet of lined freeboard. All site and access road erosion controls had been implemented properly and there was no evidence of accelerated erosion or sedimentation. Noted that the access road would require routine maintenance prior to and after the removal of the drill rig and subsequently when well stimulation equipment is brought onsite. | |
2026769 | 2011-12-12 | No Violations Noted | First Class Energy Rig#1 Schramm drilling at 682' at time of inspection. Pit lined and freeboard maintained.
Discussed w/Operator rep R. Morris cement basket set at 379' on 13 3/8". Operator stated open mine/pillar/lost circulation detected at approximately 420' ¿ 430'. Reviewed w/Operator installation of choke lines and associated valves off annular BOP as per previously discussed plans. Inspection conducted w/OGI J. Olson. |
|
2041443 | 2012-02-09 | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Drill pit located onsite. Pit contianed cuttings and minimal fluids. Pit had more than the required two feet of lined freeboard. The Department recommends that the operator begin final site restoration activities as soon as the weather permits in the spring of 2012. | |
2064202 | 2012-05-01 | No Violations Noted | At the time of inspection the well appeared to drilled and equipped for production. The well apparatus and brine tank battery located onsite appear to be in sound condition. The Department suggest that the Operator continue to monitor the site to ensure that restoration status of 70% uniform vegetative coverage is met. | |
2099897 | 2012-09-06 | No Violations Noted | Site restoration extension unitl 8/31/2013 | |
2137397 | 2013-02-01 | No Violations Noted | Site was slightly snow covered at time of inspection. No accelerated erosion or off-site transport of sediment was noted. Operator was granted an extension on restoration until August 2013. Site does not yet have 70% uniform vegetative cover. Brine tanks and production equipment appear to be in good order. No leaks of production fluids to the environment were detected. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 7629.0 | 163.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 18098.0 | 148.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 1390.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 | AQUATIC SYNTHESIS UNLIMITED, LLC (KAY ARENA) | INDIANA | PA |
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 215.0 | Bbl | ROAD SPREADING | SOMERSET COUNTY ROADSPREADING | PA | ||
2011-2 | FRACING FLUID WASTE | 905.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2011-2 | FRACING FLUID WASTE | 896.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 | PATRIOT WATER TREATMENT | WARREN | OH |
2011-2 | FRACING FLUID WASTE | 290.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2011-2 | PRODUCED FLUID | 210.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2012-1 | PRODUCED FLUID | 742.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 | AQUATIC SYNTHESIS UNLIMITED, LLC (KAY ARENA) | INDIANA | PA |
2012-1 | FRACING FLUID WASTE | 1365.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 | BLAZEK PUMP AND WELL | HIRAM | OH |
2012-1 | PRODUCED FLUID | 412.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 | BLAZEK PUMP AND WELL | HIRAM | OH |
2012-1 | PRODUCED FLUID | 1679.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-1 | PRODUCED FLUID | 578.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2012-1 | FRACING FLUID WASTE | 615.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-1 | PRODUCED FLUID | 1578.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-1 | FRACING FLUID WASTE | 515.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |
2012-1 | PRODUCED FLUID | 199.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |