If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-031-23610 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.146917,"lon":-79.51973,"icon":""}]} |
Operator Name: WINFALL ENERGY INC N V | |
First Permit Date: 2002-06-11 | |
Last Permit Date: 2002-06-11 | |
Spud Date: 2002-07-22 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 41.146917 | |
Longitude: -79.51973 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 346.71 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 1353.0 | 265.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 2585.57 | 365.0 | 0.0 | 0.0 | 9.71 | 365.0 |
2007-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2006-0 | 3258.43 | 365.0 | 0.0 | 0.0 | 11.43 | 365.0 |
2005-0 | 2978.14 | 365.0 | 0.0 | 0.0 | 22.52 | 365.0 |
2004-0 | 9001.0 | 365.0 | 0.0 | 0.0 | 49.6 | 365.0 |
2003-0 | 8642.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2002-0 | 9780.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2002-0 | BRINE | 0.02 | Bbl | OTHER | NOT LISTED |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1143641 | 2002-06-19 | Violation(s) Noted | Access road crosses an unnamed blue line to the Clarion River.
Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign. |
306828 |
1143641 | 2002-06-19 | Violation(s) Noted | Access road crosses an unnamed blue line to the Clarion River.
Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign. |
306828 |
1143641 | 2002-06-19 | Violation(s) Noted | Access road crosses an unnamed blue line to the Clarion River.
Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign. |
306829 |
1143641 | 2002-06-19 | Violation(s) Noted | Access road crosses an unnamed blue line to the Clarion River.
Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign. |
306830 |
1143641 | 2002-06-19 | Violation(s) Noted | Access road crosses an unnamed blue line to the Clarion River.
Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign. |
306830 |
1153492 | 2002-07-25 | No Violations Noted | Waiver for this site has been approved.
Site i.d. sign and E+S plan are posted on the access road. E+S controls at the stream crossing are working and being maintained. Well is being drilled. A pit is on site lined with a 20 mil. liner. No visialbe holes in the liner. Pit has adequate freeboard. |