37-031-23610

Well Details

Well ID: 37-031-23610
Loading map...
Operator Name: WINFALL ENERGY INC N V
First Permit Date: 2002-06-11
Last Permit Date: 2002-06-11
Spud Date: 2002-07-22
Unconventional: No
Horizontal: No
Violations: None
Latitude: 41.146917
Longitude: -79.51973

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 346.71 365.0 0.0 0.0 0.0 0.0
2009-0 1353.0 265.0 0.0 0.0 0.0 0.0
2008-0 2585.57 365.0 0.0 0.0 9.71 365.0
2007-0 0.0 0.0 0.0 0.0 0.0 0.0
2006-0 3258.43 365.0 0.0 0.0 11.43 365.0
2005-0 2978.14 365.0 0.0 0.0 22.52 365.0
2004-0 9001.0 365.0 0.0 0.0 49.6 365.0
2003-0 8642.0 365.0 0.0 0.0 0.0 0.0
2002-0 9780.0 365.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2002-0 BRINE 0.02 Bbl OTHER NOT LISTED

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1143641 2002-06-19 Violation(s) Noted Access road crosses an unnamed blue line to the Clarion River.

Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign.

306828
1143641 2002-06-19 Violation(s) Noted Access road crosses an unnamed blue line to the Clarion River.

Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign.

306828
1143641 2002-06-19 Violation(s) Noted Access road crosses an unnamed blue line to the Clarion River.

Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign.

306829
1143641 2002-06-19 Violation(s) Noted Access road crosses an unnamed blue line to the Clarion River.

Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign.

306830
1143641 2002-06-19 Violation(s) Noted Access road crosses an unnamed blue line to the Clarion River.

Erosion and sedimentation are taking place at the crossing. No E+S control BMP's at the crossing to prevent sediment from reaching the stream. Site appears to be constructed less than 100 feet from the stream. Measured 70 feet from the stream channel to the edge of the disturbed area. The site has been constructed but the well has not been drilled. A pit is constructed and is full of water. No E+S plan on site or site I.d. sign.

306830
1153492 2002-07-25 No Violations Noted Waiver for this site has been approved.

Site i.d. sign and E+S plan are posted on the access road. E+S controls at the stream crossing are working and being maintained. Well is being drilled. A pit is on site lined with a 20 mil. liner. No visialbe holes in the liner. Pit has adequate freeboard.

References