Well ID: 37-051-00118
Loading map...
First Permit Date: 1856-08-15
Last Permit Date: 1856-08-15
Spud Date: 1800-01-01
Unconventional: No
Horizontal: No
Violations: 6
Latitude: 39.91975
Longitude: -79.849944

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 12.0 365.0 0.0 0.0 0.0 0.0
2012-0 12.0 365.0 0.0 0.0 0.0 0.0
2011-0 12.0 365.0 0.0 0.0 0.0 0.0
2010-0 0.0 365.0 0.0 0.0 0.0 0.0
2009-0 182.0 365.0 0.0 0.0 0.0 0.0
2008-0 550.0 365.0 0.0 0.0 0.0 0.0
2007-0 1043.0 365.0 0.0 0.0 0.0 0.0
2005-0 1972.0 365.0 0.0 0.0 0.0 0.0
2004-0 3315.0 365.0 0.0 0.0 0.0 0.0
2003-0 2648.87 365.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1852514 2009-12-16 Violation(s) Noted 578592
1852514 2009-12-16 Violation(s) Noted 578592
1852514 2009-12-16 Violation(s) Noted 578593
1852514 2009-12-16 Violation(s) Noted 578593
1852514 2009-12-16 Violation(s) Noted 578594
1852514 2009-12-16 Violation(s) Noted 578594
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580130
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580130
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580130
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580131
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580131
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580131
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580132
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580132
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP¿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580132
1864936 2010-01-20 No Violations Noted Inspection related to the gas line replacement that this well is attached to.
1864965 2010-02-03 No Violations Noted Inspection related to the gas line replacement that this well is attached to.