37-115-20467

Well Details

Well ID: 37-115-20467
Loading map...
County: Susquehanna
Municipality: Forest Lake Township
Operator Name: CARRIZO (MARCELLUS) LLC
Well Pad ID: 145322
Farm/Lease Name: BAKER 5H
First Permit Date: 2010-11-17
Last Permit Date: 2010-11-17
Spud Date: 2010-12-03
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 6
Latitude: 41.884158
Longitude: -75.992305

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1950418 2011-02-16 Violation(s) Noted Drillers log not being kep on site and up to date. Opeartor needs to repair and maintain secondary containment and store all drilling materials on containment. 604973
1950418 2011-02-16 Violation(s) Noted Drillers log not being kep on site and up to date. Opeartor needs to repair and maintain secondary containment and store all drilling materials on containment. 604974
1950418 2011-02-16 Violation(s) Noted Drillers log not being kep on site and up to date. Opeartor needs to repair and maintain secondary containment and store all drilling materials on containment. 604975
1950418 2011-02-16 Violation(s) Noted Drillers log not being kep on site and up to date. Opeartor needs to repair and maintain secondary containment and store all drilling materials on containment. 604976
2007326 2011-09-29 No Violations Noted
2014427 2011-10-25 Pending DEP arrived on site at 11 am. The purpose of the inspection was to check the status of the wells and not any activity on site. At the time of inspection, crews were installing new plastic secondary containment for upcoming frac. Six wells have been drilled (1H - 6H). All six wells are currently shut in and not vented. Inspection of the Baker 5H cellar revealed minor bubbling. It is requested by the DEP that the Operator identify the source of the leak. The Operator is to notify the DEP when this work is to be completed. The Operator shall provide a summary of the findings, and a description fo what repairs need to be completed. According to Chapter 78 Section 78.86...the Operator has the option to correct the defect or submit a plan to correct the defect for approval by the Department within 30 days.
2027785 2011-11-23 No Violations Noted DEP on site 9:00. Baker Hughes on site. Currently fraccing Stage 2 of well. Currently pumping @ 87 bbls/min. Monitoring pressures on Backside of 1H, 3H, and 5H. No significant increases on any backside pressures so far. have completed 6 stages on 1H and 3H so far. Walked site. Secondary containment in place. Company Man indicated if an significant changes are encountered on backside pressures being monitored, the DEP would be notified.
2053181 2012-03-13 No Violations Noted Please refer to Baker 1H 3-13-12 inspection report regarding details of the investigation. Permit number is 37-115-20471.
2077198 2012-06-18 Violation(s) Noted see inspection report for full details 642173
2077198 2012-06-18 Violation(s) Noted see inspection report for full details 642174

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 516078.0 180.0 0.0 0.0 0.0 0.0
2012-1 604321.0 122.0 0.0 0.0 0.0 0.0
2011-2 3485.0 3.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 4357.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2011-1 DRILL CUTTINGS 1126.0 Tons LANDFILL NY STATE #32S11 ALLIED WASTE SYSTEMS NIAGARA FALLS NY
2011-1 DRILL CUTTINGS 90.0 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH
2011-2 PRODUCED FLUID 3661.0 Bbl REUSE OTHER THAN ROAD SPREADING FRAC WATER REUSE PA
2012-1 PRODUCED FLUID 18543.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-1 DRILL CUTTINGS 126.0 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH