X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645100612020

Well Details

Well ID: 0645100612020
Loading map...
Location: 02/12-06-064-10W5/0
Location Alias: 02/12-06-64-10 W5M
Location Alias 2: 02/12-06-064-10 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 10
Section: 06
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 12-6-64-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0042922
License Date: 1972-07-05
License Status: Issued
Spud Date: 1972-07-14
Final Drill Date: 1972-08-07
Well Total Depth: 2653.30 m
Surface Hole Latitude: 54.509964
Surface Hole Longitude: -115.511302

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-07-05 Obtained License
1972-07-22 Drill Stem Test Performed
1972-08-07 Finished Drilling
1972-08-07 Production Casing Operation Performed
1972-08-07 Well Mode changed to Drilled and Cased
1972-09-22 Perforation Treatment Performed - Jet Perforation
1972-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-28 Well Began Injection
1972-11-28 Well Fluid changed to Water
1972-11-28 Well Type changed to Injection
1974-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-23 Perforation Treatment Performed - Fractured
1984-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-08 Well Log Performed
1989-06-10 Perforation Treatment Performed - Jet Perforation
1989-06-10 Well Log Performed
1989-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-13 Well Log Performed
1991-05-02 Well Log Performed
1992-02-01 Perforation Treatment Performed - Jet Perforation
1992-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-09 Well Log Performed
1993-08-16 Well Log Performed
1993-08-17 Well Log Performed
1993-09-20 Well Fluid changed to Solvent
1993-09-20 Well Type changed to Injection
1997-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-03 Perforation Treatment Performed - Jet Perforation
1999-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-09-22 Perforation 2606.00 2626.20 7
1989-06-10 Perforation 2566.50 2568.30 7
1989-06-10 Perforation 2575.90 2578.00 0
1989-06-12 Acid Treatment 2566.50 2626.20 0
1992-02-01 Perforation 2583.20 2585.60 13
1992-02-01 Perforation 2587.80 2589.30 13
1992-02-01 Perforation 2595.40 2600.00 13
1992-02-08 Acid Treatment 2566.50 2626.20 0
1997-01-03 Perforation 2590.80 2593.90 14
1997-01-03 Acid Treatment 2590.80 2593.90 0
1997-01-03 Packing Device Capped w/Cement 2601.00 2603.50 0
1972-09-26 Acid Treatment 2606.00 2626.20 0
1999-12-16 Acid Treatment 2566.50 2600.00 0
2002-02-08 Acid Treatment 2566.50 2600.00 0
2007-07-26 Acid Treatment 2566.50 2600.00 0
2008-01-18 Acid Treatment 2566.50 2600.00 0
2012-03-06 Acid Treatment 2566.50 2600.00 0
2012-06-19 Acid Treatment 2566.50 2600.00 0
2015-12-08 Acid Treatment 2566.50 2600.00 0
1974-05-02 Acid Treatment 2606.00 2626.20 0
1974-12-15 Acid Treatment 2606.00 2626.20 0
1975-08-20 Acid Treatment 2606.00 2626.20 0
1976-02-11 Acid Treatment 2606.00 2626.20 0
1978-05-23 Acid Treatment 2606.00 2626.20 0
1980-01-23 Fracture 2606.00 2626.20 0
1984-04-03 Acid Treatment 2606.00 2626.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-06 No Incident Encountered 0.00 0.00
2012-06-19 No Incident Encountered 0.00 0.00
2015-12-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References