If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0555022204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.761281,"lon":-114.221138,"icon":""}]} |
Location: 00/04-22-055-02W5/0 | |
Location Alias: 00/04-22-55-02 W5M | |
Location Alias 2: 00/04-22-055-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 5 | |
Range: 02 | |
Section: 22 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: PLACID LAC ST. ANNE NO. 2 | |
Operator Name: Placid Oil Company | |
License Number: 0005535 | |
License Date: 1952-10-24 | |
License Status: RecExempt | |
Spud Date: 1952-10-27 | |
Final Drill Date: 1952-11-29 | |
Well Total Depth: 1554.50 m | |
Surface Hole Latitude: 53.761281 | |
Surface Hole Longitude: -114.221138 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-10-24 | Obtained License |
1952-11-01 | Production Casing Operation Performed |
1952-11-17 | Drill Stem Test Performed |
1952-11-19 | Drill Stem Test Performed |
1952-11-20 | Drill Stem Test Performed |
1952-11-29 | Finished Drilling |
1952-11-29 | Well Mode changed to Drilled and Cased |
1952-12-08 | Perforation Treatment Performed - Bullet Perforation |
1952-12-10 | Perforation Treatment Performed - Cement Squeeze |
1952-12-13 | Perforation Treatment Performed - Bullet Perforation |
1952-12-13 | Perforation Treatment Performed - Cement Squeeze |
1952-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-12-16 | Perforation Treatment Performed - Bullet Perforation |
1952-12-22 | Perforation Treatment Performed - Bullet Perforation |
1952-12-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-02-14 | Well Began Production |
1953-02-14 | Well Fluid changed to Crude Oil |
1953-02-14 | Well Mode changed to Pumping |
1956-07-04 | Perforation Treatment Performed - Cement Plug |
1956-07-04 | Well Abandoned |
1956-07-04 | Well Fluid changed to Crude Oil |
1956-07-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-12-08 | Bullet Perforation | 1411.50 | 1413.40 | 20 |
1956-07-04 | Cement Plug | 1364.60 | 1395.10 | 0 |
1952-12-10 | Cement Squeeze | 1411.50 | 1413.40 | 0 |
1952-12-13 | Cement Squeeze | 1411.50 | 1413.40 | 0 |
1952-12-13 | Bullet Perforation | 1402.70 | 1405.10 | 20 |
1952-12-15 | Acid Treatment | 1402.70 | 1405.10 | 0 |
1952-12-16 | Bullet Perforation | 1380.10 | 1400.90 | 13 |
1952-12-16 | Acid Treatment | 1380.10 | 1405.10 | 0 |
1952-12-22 | Bullet Perforation | 1405.10 | 1406.30 | 30 |
1952-12-24 | Acid Treatment | 1380.10 | 1400.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]