X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134161201000

Well Details

Well ID: 0134161201000
Loading map...
Location: 00/01-12-013-16W4/0
Location Alias: 00/01-12-13-16 W4M
Location Alias 2: 00/01-12-013-16 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 16
Section: 12
County/Municipality: Municipal District of Taber
Well Name: NORCEN ENCHANT 1-12-13-16
Operator Name: Canadian Natural Resources Limited
License Number: 0201533
License Date: 1997-05-21
License Status: Issued
Spud Date: 1997-06-02
Final Drill Date: 1997-06-11
Well Total Depth: 1411.00 m
Surface Hole Latitude: 50.065783
Surface Hole Longitude: -112.054994

For data sources see[1][2]

Well History

Date Event
1997-05-21 Obtained License
1997-06-04 Surface Casing Operation Performed
1997-06-06 Direction Drilling Operation Performed - Deviate
1997-06-11 Finished Drilling
1997-06-11 Well Log Performed
1997-06-11 Well Mode changed to Drilled and Cased
1997-06-12 Production Casing Operation Performed
1997-06-13 Rig Released
1997-06-19 Well Log Performed
1997-07-13 Perforation Treatment Performed - Jet Perforation
1997-07-15 Perforation Treatment Performed - Fractured
1997-07-16 Perforation Treatment Performed - Jet Perforation
1997-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-18 Perforation Treatment Performed - Remedial Casing
1997-08-02 Well Began Production
1997-08-02 Well Fluid changed to Crude Oil
1997-08-02 Well Mode changed to Pumping
2001-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-16 Well Log Performed
2001-10-10 Well Began Injection
2001-10-10 Well Fluid changed to Water
2001-10-10 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-06 934.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-13 Perforation 1354.00 1355.00 18
1997-07-13 Perforation 1358.50 1360.50 18
1997-07-13 Perforation 1369.00 1370.00 18
1997-07-13 Perforation 1371.00 1372.00 18
1997-07-15 Fracture 1354.00 1372.00 0
1997-07-16 Perforation 201.50 202.00 16
1997-07-17 Acid Treatment 201.50 202.00 0
1997-07-18 Remedial Casing Cementing 201.50 202.00 0
2001-07-14 Acid Treatment 1354.00 1372.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3115 0.0 0.0 0.0
1998 2619 0.0 0.0 0.0
1999 7497 0.0 0.0 0.0
2000 8692 0.0 0.0 0.0
2001 1584 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References