| Well ID: 0564200906022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.823314,"lon":-112.927328,"icon":""}]} |
| Location: 02/06-09-056-20W4/2 | |
| Location Alias: 02/06-09-56-20 W4M | |
| Location Alias 2: 02/06-09-056-20 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 09 | |
| County/Municipality: Lamont County | |
| Well Name: TAC REDWATER 6-9-56-20 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0169176 | |
| License Date: 1994-08-02 | |
| License Status: Abandoned | |
| Spud Date: 1994-09-14 | |
| Final Drill Date: 1994-09-22 | |
| Well Total Depth: 1347.00 m | |
| Surface Hole Latitude: 53.823314 | |
| Surface Hole Longitude: -112.927328 |
| Date | Event |
|---|---|
| 1994-08-02 | Obtained License |
| 1994-09-14 | Surface Casing Operation Performed |
| 1994-09-15 | Direction Drilling Operation Performed - Horizontal |
| 1994-09-17 | Production Casing Operation Performed |
| 1994-09-20 | Direction Drilling Operation Performed - Horizontal |
| 1994-09-20 | Well Log Performed |
| 1994-09-22 | Finished Drilling |
| 1994-09-22 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-09-24 | Rig Released |
| 1994-09-24 | Well Structure changed to Drain |
| 1994-09-26 | Well Log Performed |
| 2004-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-01-21 | Perforation Treatment Performed - Cement Plug |
| 2015-01-21 | Plug Back Performed |
| 2015-01-21 | Well Mode changed to Abandoned Zone |
| 2015-01-21 | Well Structure changed to Drain |
| 2015-02-06 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1994-09-15 | 678.00 | Horizontal |
| 1994-09-20 | 976.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-09-22 | Open Hole/Barefoot Completion | 965.00 | 1347.00 | 0 |
| 2004-08-06 | Packing Device Capped w/Cement | 874.00 | 882.00 | 0 |
| 2015-01-21 | Cement Plug | 541.40 | 857.40 | 0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-01-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]