If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0655112606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.651805,"lon":-115.555403,"icon":""}]} |
| Location: 00/06-26-065-11W5/0 | |
| Location Alias: 00/06-26-65-11 W5M | |
| Location Alias 2: 00/06-26-065-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 26 | |
| County/Municipality: Big Lakes County | |
| Well Name: 1976082 SWANHS 6-26-65-11 | |
| Operator Name: Razor Energy Corp. | |
| License Number: 0075251 | |
| License Date: 1979-04-18 | |
| License Status: Suspension | |
| Spud Date: 1979-04-30 | |
| Final Drill Date: 1979-05-29 | |
| Well Total Depth: 2675.00 m | |
| Surface Hole Latitude: 54.651805 | |
| Surface Hole Longitude: -115.555403 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-04-18 | Obtained License |
| 1979-05-01 | Lost Circulation Occurred |
| 1979-05-22 | Liner Casing Operation Performed |
| 1979-05-29 | Finished Drilling |
| 1979-05-29 | Perforation Treatment Performed - Open-Hole Completion |
| 1979-05-31 | Drill Stem Test Performed |
| 1979-06-01 | Drill Stem Test Performed |
| 1979-06-02 | Drill Stem Test Performed |
| 1979-06-04 | Drill Stem Test Performed |
| 1979-06-05 | Drill Stem Test Performed |
| 1979-06-07 | Well Mode changed to Drilled and Cased |
| 1979-08-26 | Well Log Performed |
| 1979-08-31 | Perforation Treatment Performed - Cement Squeeze |
| 1979-12-04 | Perforation Treatment Performed - Jet Perforation |
| 1979-12-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-12-22 | Well Began Production |
| 1979-12-22 | Well Fluid changed to Crude Oil |
| 1979-12-22 | Well Mode changed to Flowing |
| 1980-02-22 | Perforation Treatment Performed - Jet Perforation |
| 1980-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-02-25 | Well Fluid changed to Crude Oil |
| 1980-02-25 | Well Mode changed to Pumping |
| 1980-03-26 | Perforation Treatment Performed - Jet Perforation |
| 1980-06-20 | Perforation Treatment Performed - Jet Perforation |
| 1980-06-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-08-21 | Perforation Treatment Performed - Jet Perforation |
| 1980-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-12-07 | Perforation Treatment Performed - Cement Squeeze |
| 1987-12-01 | Well Fluid changed to Crude Oil |
| 1987-12-01 | Well Mode changed to Suspended |
| 1998-03-07 | Well Log Performed |
| 1998-03-14 | Perforation Treatment Performed - Cement Squeeze |
| 1998-03-14 | Plug Back Performed |
| 1998-03-14 | Well Fluid changed to Crude Oil |
| 1998-03-14 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-05-29 | Open Hole/Barefoot Completion | 2585.00 | 2675.00 | 0 |
| 1980-06-20 | Perforation | 2604.00 | 2611.00 | 13 |
| 1980-06-21 | Acid Treatment | 2604.00 | 2611.00 | 0 |
| 1980-08-21 | Perforation | 2595.00 | 2602.00 | 13 |
| 1980-08-22 | Acid Treatment | 2595.00 | 2602.00 | 0 |
| 1980-12-07 | Cement Squeeze | 2595.00 | 2624.00 | 0 |
| 1998-03-14 | Cement Squeeze | 2604.00 | 2633.00 | 0 |
| 1979-08-31 | Cement Squeeze | 2585.00 | 2675.00 | 0 |
| 1979-12-04 | Perforation | 2638.00 | 2646.00 | 13 |
| 1979-12-05 | Acid Treatment | 2638.00 | 2646.00 | 0 |
| 1980-02-22 | Perforation | 2628.00 | 2633.00 | 13 |
| 1980-02-23 | Acid Treatment | 2628.00 | 2633.00 | 0 |
| 1980-03-26 | Perforation | 2622.00 | 2624.00 | 14 |
| 1980-03-26 | Perforation | 2620.00 | 2621.00 | 14 |
| 1980-03-26 | Perforation | 2617.00 | 2618.00 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1979 | 257 | 0.0 | 0.0 | 0.0 |
| 1980 | 4731 | 0.0 | 0.0 | 0.0 |
| 1981 | 1055 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1979-05-01 | Lost Circulation | 126.00 | 126.00 |
For data sources see[6]