X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031612000

Well Details

Well ID: 0485031612000
Loading map...
Location: 00/12-16-048-03W5/0
Location Alias: 00/12-16-48-03 W5M
Location Alias 2: 00/12-16-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 16
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 12-16-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0045295
License Date: 1973-03-02
License Status: RecCertified
Spud Date: 1973-03-09
Final Drill Date: 1973-03-11
Well Total Depth: 973.80 m
Surface Hole Latitude: 53.143592
Surface Hole Longitude: -114.389651

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-02 Obtained License
1973-03-11 Finished Drilling
1973-03-11 Well Mode changed to Drilled and Cased
1973-03-12 Production Casing Operation Performed
1973-08-09 Perforation Treatment Performed - Selective Jet Perforations
1973-08-10 Perforation Treatment Performed - Fractured
1973-08-20 Well Began Production
1973-08-20 Well Fluid changed to Crude Oil
1973-08-20 Well Mode changed to Pumping
1984-12-02 Well Fluid changed to Crude Oil
1984-12-02 Well Mode changed to Suspended
2000-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-09 Plug Back Performed
2000-08-09 Well Log Performed
2000-08-17 Well Abandoned
2000-08-17 Well Fluid changed to Crude Oil
2000-08-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-08-09 Selective Jet Perforations 947.00 947.60 0
1973-08-09 Selective Jet Perforations 948.20 948.80 0
1973-08-09 Selective Jet Perforations 949.50 950.10 0
1973-08-09 Selective Jet Perforations 950.70 952.80 0
1973-08-09 Selective Jet Perforations 953.10 953.10 0
1973-08-10 Fracture 947.00 953.10 0
2000-08-09 Packing Device Capped w/Cement 929.00 937.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 3123 0.0 0.0 0.0
1974 7938 0.0 0.0 0.0
1975 7882 0.0 0.0 0.0
1976 5873 0.0 0.0 0.0
1977 4762 0.0 0.0 0.0
1978 4269 0.0 0.0 0.0
1979 8502 0.0 0.0 0.0
1980 8465 0.0 0.0 0.0
1981 8226 0.0 0.0 0.0
1982 8050 0.0 0.0 0.0
1983 8604 0.0 0.0 0.0
1984 7195 0.0 0.0 0.0

For data sources see[5]

References