If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404032504D02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.466584,"lon":-110.313432,"icon":""}]} |
Location: D0/04-25-040-03W4/2 | |
Location Alias: D0/04-25-40-03 W4M | |
Location Alias 2: D0/04-25-040-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 03 | |
Section: 25 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 4-25-40-3 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0143015 | |
License Date: 1990-01-30 | |
License Status: Suspension | |
Spud Date: 1990-02-20 | |
Final Drill Date: 1990-02-23 | |
Well Total Depth: 812.00 m | |
Surface Hole Latitude: 52.466584 | |
Surface Hole Longitude: -110.313432 |
Date | Event |
---|---|
1990-01-30 | Obtained License |
1990-02-21 | Surface Casing Operation Performed |
1990-02-23 | Drill Stem Test Performed |
1990-02-23 | Finished Drilling |
1990-02-23 | Well Log Performed |
1990-02-23 | Well Mode changed to Drilled and Cased |
1990-02-24 | Production Casing Operation Performed |
1990-02-24 | Rig Released |
1990-03-02 | Well Log Performed |
1990-03-03 | Perforation Treatment Performed - Jet Perforation |
2005-06-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-06-26 | Perforation Treatment Performed - Jet Perforation |
2005-06-26 | Plug Back Performed |
2005-07-15 | Well Began Production |
2005-07-15 | Well Fluid changed to Crude Oil |
2005-07-15 | Well Mode changed to Pumping |
2009-05-01 | Well Fluid changed to Crude Oil |
2009-05-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-03-03 | Perforation | 776.80 | 778.00 | 14 |
2005-06-26 | Packing Device Capped w/Cement | 752.50 | 760.50 | 0 |
2005-06-26 | Packing Device Capped w/Cement | 742.00 | 750.00 | 0 |
2005-06-26 | Perforation | 703.50 | 705.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 3085 | 0.0 | 0.0 | 0.0 |
2006 | 7071 | 0.0 | 0.0 | 0.0 |
2007 | 7870 | 0.0 | 0.0 | 0.0 |
2008 | 1164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]