If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404112508020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.472795,"lon":-111.446061,"icon":""}]} |
Location: 02/08-25-040-11W4/0 | |
Location Alias: 02/08-25-40-11 W4M | |
Location Alias 2: 02/08-25-040-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 11 | |
Section: 25 | |
County/Municipality: Flagstaff County | |
Well Name: COYOTE PROVO 8-25-40-11 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0158744 | |
License Date: 1993-06-02 | |
License Status: Abandoned | |
Spud Date: 1993-06-24 | |
Final Drill Date: 1993-06-27 | |
Well Total Depth: 1100.00 m | |
Surface Hole Latitude: 52.472795 | |
Surface Hole Longitude: -111.446061 |
Date | Event |
---|---|
1993-05-27 | Well Log Performed |
1993-06-02 | Obtained License |
1993-06-10 | Well Log Performed |
1993-06-25 | Direction Drilling Operation Performed - Deviate |
1993-06-25 | Surface Casing Operation Performed |
1993-06-27 | Finished Drilling |
1993-06-27 | Well Log Performed |
1993-06-27 | Well Mode changed to Drilled and Cased |
1993-06-28 | Production Casing Operation Performed |
1993-06-28 | Rig Released |
1993-07-08 | Well Log Performed |
1993-09-02 | Well Log Performed |
1993-09-03 | Perforation Treatment Performed - Jet Perforation |
1993-10-12 | Well Began Production |
1993-10-12 | Well Fluid changed to Crude Oil |
1993-10-12 | Well Mode changed to Pumping |
1996-06-09 | Perforation Treatment Performed - Jet Perforation |
1996-06-09 | Well Log Performed |
1998-02-24 | Well Fluid changed to Crude Oil |
1998-02-24 | Well Mode changed to Suspended |
2009-03-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-28 | Plug Back Performed |
2009-03-28 | Well Fluid changed to Crude Oil |
2009-03-28 | Well Mode changed to Abandoned Zone |
2010-07-14 | Well Abandoned |
2010-07-14 | Well Fluid changed to Crude Oil |
2010-07-14 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1993-06-25 | 204.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-09-03 | Perforation | 1014.00 | 1018.00 | 13 |
1996-06-09 | Perforation | 1014.50 | 1020.50 | 17 |
2009-03-28 | Packing Device Capped w/Cement | 999.50 | 1007.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 1856 | 0.0 | 0.0 | 0.0 |
1994 | 8187 | 0.0 | 0.0 | 0.0 |
1995 | 8487 | 0.0 | 0.0 | 0.0 |
1996 | 3372 | 0.0 | 0.0 | 0.0 |
1997 | 192 | 0.0 | 0.0 | 0.0 |
For data sources see[6]